NCWG2-11.4A INT1 Symbol Repository

Slides:



Advertisements
Similar presentations
The IHO Data Registry (S-100) Supporting e-Navigation and Maritime Spatial Planning International Hydrographic Organization.
Advertisements

Dreamweaver MX 2004 “Viewing the Workspace” Mrs. Wilson.
Lecture Microsoft Access and Relational Database Basics.
Tutorial 11: Connecting to External Data
Unit 7.b. Regional Situation and Opportunities: Status of Hydrography in the region Captain M K Barritt RN Vice Chairman IHOCBC.
PowerPoint Lesson 9 Importing and Exporting Information Microsoft Office 2010 Advanced Cable / Morrison 1.
1 California State University, Fullerton Chapter 8 Personal Productivity and Problem Solving.
2.00 Understand Computer Fundamentals Unit Objective: 2.01 Software.
Microsoft Excel 2007 © Wiley Publishing All Rights Reserved. The L Line The Express Line to Learning L Line.
© 2001 Business & Information Systems 2/e1 Chapter 8 Personal Productivity and Problem Solving.
Lead Black Slide Powered by DeSiaMore1. 2 Chapter 8 Personal Productivity and Problem Solving.
Computer Applications Chapter 16. Management Information Systems Management Information Systems (MIS)- an organized system of processing and reporting.
Spreadsheets 1 See W:\IST\Mr Charles\hardware\spreadsheet1.doc for images 23/02/11.
A search engine is a web site that collects and organizes content from all over the internet Search engines look through their own databases of.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
Institute for the Protection and Security of the Citizen HAZAS – Hazard Assessment ECCAIRS Technical Course Provided by the Joint Research Centre - Ispra.
INFORMATION TECHNOLOGY DATABASE MANAGEMENT. A database is a collection of information organized to provide efficient retrieval. The collected information.
Validator Registry Repository (ADORA) Index EngineCORDRAWEB Handle System ADL-R.
A Shared Commitment to Digital Preservation and Access.
Inter Regional Coordination Committee Revision of the IHO Strategic Plan and Input to the Long-term Work Programme /22 IRCC8-11.
CBSC-14 IHB Report Mustafa IPTES Director, IHO. Ratification of Protocol of Amendments on IHO Convention *47 of 48 approvals received. * Next IHC will.
IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-8 Agenda item 8 Input from HSSC-7 IHB.
Worldwide ENC Database Working Group
Working in Groups in Canvas
Update on S-100 Registry interface and Test operation
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Software Engineering Management
Pattern Library Project
Hydrographic Services and Standards Committee
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
Future of the Paper Chart
Underkeel Clearance Management (UKCM) Systems in S-49 (Standardization Of Mariners’ Routeing Guides), M-3 (IHO Resolutions), and S-32 (IHO Hydrographic.
Proposed IHO Work Programme for 2018
Principles of Web Design 5th Edition
Software Engineering Management
Report from the S-100WG to NCWG April 2016, IHB, Monaco
Interrelation between IHO organs with special regard to the Council
Agenda item 4: Self-assessment Reports by INT Charts/ENC Coordinators
MANAGING DATA RESOURCES
SPRWG Proposed orientations
Updates and Proposals from the HSSC
International Hydrographic Organization
Access 2007 The L Line The Express Line to Learning L L Line
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
INF 15.1: Update on Digital Reference Tool for Cartographer (DRTC)
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
NCWG Input to the IHO Strategic Plan and IHO 3 Year Work Plan
Workshop for Regional INT Charts / ENC Coordinators
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
NCWG2-11.2B US Response (Fathoms and Compass Terms)
Operation of the Organization under IHO Convention and its supporting Basic Documents
IHO Secretariat, Monaco, November
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
What is Capacity Building?
Scanning and Archiving the Five GEBCO Charts Edition
EAtHC Awareness Seminar
Agenda item 4: Self-assessment Reports by INT Charts/ENC Coordinators
IHO NCWG2 IHB, Monaco April 2016
Status Report of the SPRWG of the Council Future Strategic Plan
Report of the S-101 Project Team
Status Report on Inland ENC Development and Standardization
Hydrographic Services and Standards Committee
Workshop for Regional INT Charts / ENC Coordinators
Hydrographic Services and Standards Committee
Hydrographic Services and Standards Committee
Status Report of the SPRWG of the Council
Status Report of the SPRWG of the Council
Hydrographic Services and Standards Committee
IALA/IHO Interaction on the IMO Maritime Service Portfolio Program
Triennium of IHO centenary celebration activities (IHO-100)
Presentation transcript:

NCWG2-11.4A INT1 Symbol Repository 2nd Meeting of the Nautical Cartography Working Group 26-29 April 2016 Monaco NCWG2-11.4A INT1 Symbol Repository

Over 570 INT1 Symbols There are over 570 rows of entries in the latest editions of INT1 that hold graphic elements in the “Chart Specification of the IHO” or "INT1" column. Does it make sense that each organization supporting maritime safety must create each of these symbols over and over to produce their own chart 1 document?

Proposal Start sharing the symbol graphics used in S-4 and INT1 with all organizations that create chart 1 documents Not a recommendation to create a chart production symbol library Share the graphics with maritime academies? Provide complete public access to the symbols?

Benefits Ensure conformity with S-4 Ensure consistency among INT1s and chart 1s Reduce effort for all by sharing the task of creating symbol graphics

Recommendations 1. Endorse the establishment of a shared "S-4/INT1 Raster Nautical Chart Symbol Graphic Repository (or Library)." 2. Survey interested organizations to determine which graphic formats will be easiest export, store, extract, and import. 3. Establish simple rules for participation or membership in the library. 4. Establish a short term capacity to store graphics on an FTP site on an IHB or member states' computer server. 5. Establish a simple graphic file naming convention. 6. Encourage INT1 and chart 1 producing organizations contribute symbol graphics to the library. 7. Consider longer term goals for the library, such as possible use of an S-100 (or similar) portrayal registry to store and manage S-4 symbols, including the establishment of a governance process for submitting, validating, and retrieving symbols.