News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al.

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Fill in missing numbers or operations
Misura del vapor dacqua in atmosfera mediante Lidar Raman F.Congeduti, P.DAulerio, T.Colavitto, P.Sanò, F.Cardillo (CNR, Istituto di Scienze dellAtmosfera.
Kapitel 21 Astronomie Autor: Bennett et al. Galaxienentwicklung Kapitel 21 Galaxienentwicklung © Pearson Studium 2010 Folie: 1.
Motivation Requirements Preliminary design Status Yaroslav Kalmykov Small Angle Magnet Institut für Kernphysik Technische Universität Darmstadt SFB 634.
Ozone Level ppb (parts per billion)
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Zm Chr1 (50-200cM) SBI-01 Zm Chr5 (0-75cM) Zm Chr9 (40-100cM) ESM Figure S3. Sorghum/maize DTF QTL synteny between sorghum and maize chromosomes. Sorghum.
Metric Conversions Ladder Method
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Motor Installation By Bill Lee Article 430. NF 15HP NF 25HP NF 30HP NF 50HP NF 75HP D.E.T.D. Fuse Feeder O.C. Feeder Conductors N.T.D IV. Time D.E.T.D.
FOM-Institute for Plasma Physics Rijnhuizen Association Euratom-FOM T E CT E C T E CT E C Carbon Chemical Erosion Yield Experiments in Pilot-PSI Jeroen.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
AS. 02/03 Finding fractions of a quantity AS. 02/03.
Office for Harmonization in the Internal Market (Trade Marks and Designs) 9th Designs Liaison Meeting – 7 October 2010 – Item No. 4.
1 1  1 =.
1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Multi Beamlett Extraction Experiments and Sector Magnet Field Investigation.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
Decimals 10ths and 100ths.
Learning to show the remainder
1 Do Polluted Clouds Have Sharper Cloud Edges? Christine Chiu, Julian Mann, Robin Hogan University of Reading Alexander Marshak, Warren Wiscombe NASA Goddard.
Leicester lab study CAVIAR spectroscopy meeting at UCL 30 th April 2010 Stephen Ball & Mark Watkins.
ZMQS ZMQS
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Break Time Remaining 10:00.
LINAC 4 Emittance Meter.
Fixed and Variable Costs. Median income per household member in the U.S. in 2006 was in the range from: 1)$15,000-20,000 2)$20,000-25,000 3)$25,000-30,000.
Look at This PowerPoint for help on you times tables
3-5 Warm Up Problem of the Day Lesson Presentation
Overview of Fermilab Accelerator Complex and Beam Lines T. Kobilarcik FNAL.
Money Matters First Grade Math 1. What coin is worth $0.01? 1.Penny 2.Nickel 3.Dime.
15. Oktober Oktober Oktober 2012.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Area of triangles.
Least Common Multiple LCM 2 Methods
Making Landmark or Friendly Numbers (Multiplication)
Pressure = force area = 12 N 25 cm 2 = 0.48 N/cm 2.
 Depth Into the earth Surface of the earth Distance along the fault plane 100 km (60 miles) Slip on an earthquake fault START.
LIDAR TECHNOLOGIES FOR EARTH OBSERVATION January 2008 Dr Kim Hampton Lidar Technologies Ltd.
High School by SSL Technologies Physics Ex-54 Click The optical power of a lens is a measure of how much the lens bends light. The greater the optical.
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
4m 3m Diagrams Not to scale Perimeter of Composite Shapes ? ? ? Perimeter = 4 m + 7 m +3m + 1m += 22m 4m 3m 1m.
Counting coins Teacher’s Notes Slides used as worksheet print outs rather than class presentation. Variations to quantity and appearance can be made easily.
Comparison of X-ray diffraction patterns of La 2 CuO 4+   from different crystals at room temperature Pia Jensen.
Least Common Multiples and Greatest Common Factors
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Number bonds to 10,
Bunch spacing, pile up and all that Frank Zimmermann HL-LHC/LIU brainstorming Jiva Hill, 24 June 2011.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
Flat Flow by Kamila Součková 11. Task Fill a thin gap between two large transparent horizontal parallel plates with a liquid and make a little hole in.
COMPTON POLARIMETRY Analysis status Scaling laws 3 GeV Toward 850 MeV.
Select a time to count down from the clock above
Value adding solutions to optical applications High-Power Lasers - Product Presentation.
Recent Results from NEOWISE Amy Mainzer JPL. WISE 4 imaging channels covering 3 – 25  m 40 cm telescope operating at
Osservatorio di Arcetri Adaptive primary mirrors for ELTs A. Riccardi 1, P. Salinari 1, G. Brusa 1, R. Ragazzoni 1, S. Esposito 1, D. Gallieni 2 and R.
Let’s Add! Click the cloud below for a secret question! Get Started!
Update on High Efficiency Laser Designs for Airborne and Space-Based Lidar Applications F. Hovis, R. Burnham, M. Storm, R. Edwards, P. Burns, E. Sullivan,
© 2006, François Brouard Case Real Group François Brouard, DBA, CA January 6, 2006.
10 mm is the same as... 1 cm. 20 mm is the same as... 2 cm.
Presentation transcript:

News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./ G. Baumgarten et al.

Telescope Field of View tests NWT Removed polarizer from NWT, using pol. branch for FOV tests 1.5 mm fiber: 180 µrad up to mm fiber: 120 µrad – mm fiber: 60 µrad – mm fiber: 96 µrad since

CamServer/Client on tel-srv2 Green=goodyellow=clouds?red=off Laser image BGM steps NWT CamClient CamServe r SET CamClient Distance to target Server timing BGM commands

Performance of new system Analysis of 40 or 50 images (25/s, ~2 s) for BGM3 steps (two motors) Analysis of 40 or 50 images (25/s, ~2 s) for BGM3 steps (two motors) 1 s timeout after motor command 1 s timeout after motor command Stabilization (1µrad : 100km) Stabilization (1µrad : 100km) – average 5 µrad NWT – average 10 µrad SET – Peaks 30 µrad Beam deviations mostly caused by air turbulence at low altitudes (wind) Beam deviations mostly caused by air turbulence at low altitudes (wind)

526th ALOMAR RMR-Lidar meeting - Norderstedt Optical Bench 2011

626th ALOMAR RMR-Lidar meeting - Norderstedt New Etalon Motor + Piston Etalon

726th ALOMAR RMR-Lidar meeting - Norderstedt New Etalon Housing

826th ALOMAR RMR-Lidar meeting - Norderstedt Etalon test measurements2010

926th ALOMAR RMR-Lidar meeting - Norderstedt Etalon test measurements2010

1026th ALOMAR RMR-Lidar meeting - Norderstedt Optical bench status and outlook Improvement: only one Etalon T=75% easy to align Improvement: only one Etalon T=75% easy to align replacement of 532 nm detectors lower darkcount < 25Hz, lower deadtime ~30 ns replacement of 532 nm detectors lower darkcount < 25Hz, lower deadtime ~30 ns replacement of 355 nm detectors higher QE~40%, darkcount <30 Hz replacement of 355 nm detectors higher QE~40%, darkcount <30 Hz

ALOMA R RMR- Lidar – Norderst edt, Instrument Network Communication (INC) internal RMR-lidar network: *.rmrlidar.rocketrange.no rmr-srv ( ) las-srv ( ) las-bm1 ( ) las-bm2 ( ) tel-srv1 ( ) tel-srv2 ( ) daq-atmos ( ) daq-spec ( ) power controller Control Room ( ) power controller Detection Room ( ) communication types port based (pb) file based (fb)

ALOMA R RMR- Lidar – Norderst edt, computers involved: 8 port based communication servers:17 clients:22 file based communication: several scripts INC: Summary

ALOMA R RMR- Lidar – Norderst edt, Installation of Newport NewStep motor for handling of /2 plate at HG of laser#1. Lasers: Maintenance July/August 2010

ALOMA R RMR- Lidar – Norderst edt, Lasers: Maintenance July/August 2010 Exchange of flash lamps. laser#1: 53 M pulses laser#2: 53 M pulses Sealing of flow regulator in power supply of laser#1 due to leakage.

ALOMA R RMR- Lidar – Norderst edt, Lasers: Maintenance March 2011 Exchange of flash lamps. laser#1: 43 M pulses laser#2: 40 M pulses Exchange of primary mirror at beam widening telescope on laser table#2 holes in coating, also at 45° mirrors => probably singular seeding problem Connection of lasers to the new observatory N2 purge system

ALOMA R RMR- Lidar – Norderst edt, Lasers: Maintenance March 2011 Exchange of iodine cell in seeder box due to observed strange behavior of absorption spectrum. old cell: usage since 1994, solid iodine at 40°C new cell: all iodine in gas phase at 40°C (by eye) Logging of 2 additional IR energies in seeder box, now: seeder head laser#1 group laser#2 group

ALOMA R RMR- Lidar – Norderst edt, Lasers: Misc Shutdown of seeder control PC, program runs now on laser control PC: saving of computer maintenance and energy runs now as executable created with LabVIEW 8.6 Mobile Laser Status

1826th ALOMAR RMR-Lidar meeting - Norderstedt Data base measurement statistics and system performance

measurement statistics 1994 – th ALOMAR RMR-Lidar meeting - Norderstedt

2026th ALOMAR RMR-Lidar meeting - Norderstedt Measurements 2010/2011 Single / Twin / DoRIS : Jan RMR-Meeting: 122 h 2010: Jan RMR-Meeting: 220 h 2011: Jan RMR-Meeting: 100 h

2126th ALOMAR RMR-Lidar meeting - Norderstedt Daily max. Signal

2226th ALOMAR RMR-Lidar meeting - Norderstedt Monthly mean max signal 2008 – 2011

2326th ALOMAR RMR-Lidar meeting - Norderstedt Monthly mean max signal 2008 – 2011

2426th ALOMAR RMR-Lidar meeting - Norderstedt Monthly mean background 2008 – 2011

2526th ALOMAR RMR-Lidar meeting - Norderstedt Monthly mean max signal 2008 – 2011

2626th ALOMAR RMR-Lidar meeting - Norderstedt Monthly mean max signal 2008 – 2011

2726th ALOMAR RMR-Lidar meeting - Norderstedt Data summary 61% of measurements performed under daylight conditions. 61% of measurements performed under daylight conditions. Most measurements performed with DoRIS, preferably N,E. Most measurements performed with DoRIS, preferably N,E. Time resolution 30 seconds. Time resolution 30 seconds.

2826th ALOMAR RMR-Lidar meeting - Norderstedt ALOMAR level1 datafiles Signal corr. For nonlinearity / background removed + Uncertainty (1.4 GB/24h w/o raman channels) Level 1a: Gridded in 5 min time slots / 150 m altitude (35 MB/24h) Level1a Level2 ?

2926th ALOMAR RMR-Lidar meeting - Norderstedt Future activities Summer 2011

3026th ALOMAR RMR-Lidar meeting - Norderstedt IAP RMR-Lidar operations summer 2011 NLC campaign : – Met. Rockets May 2011?