MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.

Slides:



Advertisements
Similar presentations
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Advertisements

1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
DM Elective Transfer Scenarios 29 January Principles  Incoming Shipper or Read Provider responsible for obtaining read at Start of GFD – i.e.
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
1 COR2789 Measures to Address Unregistered & Shipperless Sites October 2014.
IGT and Shipper Workgroup meeting 28 th February 2011.
Background Current balance of LDZ System and Customer charges
Datalogger / DMV Modification Proposals - Summary
Introduction of Code Contingency Guidelines Document
Project Nexus Workgroup (Settlement)
UK Link Technology Refresh
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
DSC Change Committee Summary – 12th December
Change Management Committee – June 2019 Update
DM Elective Transfer Scenarios 26 February 2009
Assignment Workshop 2 16th September 09, Solihull.
DSC Change Committee Summary – 7th November
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Change Management Committee – June 2019 Update
DSC Change Budget 17th October 2018
RAASP – Solution Options Scenario Comparison
CSEPs Reconciliation Proposals
COR1072 Enduring Transfer and Trade Arrangements
DSC Change Committee Summary – 12th September
DSC Change Committee Summary – 11th July
DSC Change Committee Summary – 10th October
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
UIG Task Force Progress Report
June 2019 Release Scope DSC Change Management Committee
Introduction of Code Contingency Guidelines Document
DSC Change Committee Summary – 13th March ‘19
Datalogger / DMV Modification Proposals - Summary
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
DSC Change Committee Summary – 13th February ‘19
UIG Task Force Progress Report
XRN4249 – Part B Data Migration Plan
PN UNC AMR Topic Workgroup
PN UNC Workgroup (Settlement topic)
Project Nexus Workgroup
Gas Customer Forum Project Nexus xoserve update (as of 19th July 2010) 26th July 2010 Final.
Change Management Committee – November 2019 Release Update
DN Interruption Phase II
Project Update Design, Build and System Test completed.
COR1000 Telecoms Project UK Link Committee
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Implementation Approach Distribution Workgroup – June 2014
RG 175 – Encouraging Participation in the Elective Daily Metered Regime – Tactical Solution. (Indicative Costs) Joel Martin – 26 June 2008.
Assignment of NTS Entry Capacity – Previous Work Undertaken
Data Office – Portfolio of work
Meter Read Rejections ..
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Project Nexus Workgroup
DSC Change Committee Update
DSC Change Committee Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSC Change Committee Update
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Presentation transcript:

MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd April 2009

Costs for DM Elective Solution Service ROM Range  Cost Base + Additional Level Service £ 250,000 £ 300,000 £ 385,000 xoserve Direct Project Analysis + Delivery Costs £ 70,000 £ 95,000 £ 2,000 Offline System Replacement £ 40,000 £ 60,000 £ 81,000   UK Link Ancillary Change £ - £ 54,500 Total £ 360,000 £ 455,000 £ 522,500 Service ROM Range  Cost Base Level Service £ 200,000 £ 250,000 £ 362,500 xoserve Direct Project Analysis + Delivery Costs £ 70,000 £ 95,000 £ 2,000 Offline System Replacement £ 40,000 £ 60,000 £ 81,000   UK Link Ancillary Change £ - £ 54,500 Total £ 310,000 £ 405,000 £ 500,000 N.B All costs have been rounded to nearest £500

Additional Scope Changes Identified During Analysis Issues were identified during detailed analysis that need to be addressed with the introduction of a DM Elective Service that were not identified as part of the original scope: Issues with the Transfer Read Process – No concept of a transfer read currently within the DM regime resulting in new requirements for the DM Elective Service Performance Enhancements to UK Link Readings Screen. UK Link Ancillary Change – RPA Message Enhancements Primarily changes to RPA Messages are required to ensure: They are clear to Shippers and DM Service Providers and consistent with UK Link Standards. The creation of new rejection codes as a result of the DM Elective Service. The reason for rejections in the existing RPA file are clear and warning messages are suppressed. The costs associated with the above issues were not accounted for during the ROM analysis and this is the reason for deviation from the estimated costs provided as part of the ROM.

UK Link Committee Discussion File formats published in UK Link summary (05/03/09) approved by UK Link Committee. xoserve asked to note that Shippers may not be aware that a site was previously DME. UK Link Committee felt that required notice to incoming Shipper was required due to impacts upon the transfer read process i.e. Shipper would have to load a replacement read to override the system generated estimate loaded on D. Incoming Shipper would receive an MBR file on D detailing the system generated estimate read. xoserve to consider solution option to inform incoming Shipper of sites previous configuration where a site was DM Elective.