CSPP/IMAPP Users' Group Meeting May 21-23, 2013

Slides:



Advertisements
Similar presentations
ATR Combi & Freighter  Exit.
Advertisements

1 CAN WE TURN A PHONE IN TO A SATELLITE? Android Open 2011San Francisco,10th Oct
The Public Sector and Xtremesofts AppMetrics Working Together to Maximize Application Availability for Government Servants and Citizens Web Site:
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Processes and Operating Systems
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 1 Embedded Computing.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Consult + Engineer + Commission Creating Exceptional Environments © All Rights Reserved January 18, 2011 UNINTERRUPTIBLE POWER SYSTEM (UPS)
Page 1 Landsat Data Continuity Mission Status Jim Irons LDCM Project Scientist Earth Sciences Division NASA Goddard Space Flight Center Greenbelt, Maryland.
CLOSE APPROACH PREDICTION ANALYSIS OF THE EARTH SCIENCE CONSTELLATION WITH THE FENGYUN-1C DEBRIS Matthew Duncan - a.i. solutions, Inc. Colorado Springs,
© The Aerospace Corporation 2010 IAC-10.A Effects of Space Debris on the Cost of Space Operations William Ailor, The Aerospace Corporation James.
Making the System Operational
World Health Organization
WIND INSIGHT a wind power forecasting tool for power system security management Dr Nicholas Cutler 21 March 2013

MODIS Land Products Workshop April 18, 2003 Instructors: Matt Reeves Numerical Terradynamics Simulation Group University of Montana Dave Verbyla Dept.
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
Chapter 1: Introduction to Scaling Networks
15. Oktober Oktober Oktober 2012.
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems July 2012.
Space Weather in CMA Xiaonong Shen Deputy Administrator China Meteorological Administration 17 May 2011 WMO Cg-XVI Side Event Global Preparedness for Space.
CloudSat System Engineering Report [ Mission Performance] Presented to CloudSat Science Team Ron Boain Project System Engineer 18 October 2006.
1. Four LLs were published in February Transmission Relaying – Undesired Blocking 2.Lack of Separation for Critical Control Power Supply Leads.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 30 Slide 1 Security Engineering 2.
Import Tracking and Landed Cost Processing An Enhancement For AS/400 DMAS from  Copyright I/O International, 2001, 2005, 2008, 2012 Skip Intro Version.
Satellite Communication
Summary of Terra and Aqua MODIS Long-term Performance Jack Xiong 1, Brian Wenny 2, Sri Madhaven 2, Amit Angal 3, William Barnes 4, and Vincent Salomonson.
ASTER Operation Scenario and Status Y. Yamaguchi (Nagoya Univ., Japan) M. Fujita, T. Tachikawa, M. Kato, H. Tsu ( ERSDAC, Japan), M.J. Abrams, L. Maldonado.
Terra: Aging Spacecraft and Considerations of Maintaining Mean LocalTime vs. Maintaining Altitude and Allowing MLT to Drift K. Thome, T. Heyd, D. Mantziaras,
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Frank Stocklin Ron Vento Leslie Ambrose June 28,2001 SUPERNOVA/ACCELERATION PROBE (SNAP) Data Systems.
Page 1HMI Team Meeting – January 26, 2005 HMI Mission Operations Rock Bush HMI Stanford Program Manager Stanford University
Terra at 10 The EOS Flagship Eric Moyer NASA/Goddard Space Flight Center Greenbelt, Md Photos provided by Al Lampe May 11, 2010 Goddard Space Flight.
CXC Manager’s Status Report Chandra Users’ Committee Meeting Edward M. Mattison 29 June 2004.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Advanced Spaceborne Thermal Emission and Reflection Radiometer
Launching, Orbital Effects & Satellite Subsystems
ESMO 1 Constellation Operations Lessons Learned For Future Exploration Angelita C. Kelly / NASA Goddard Space Flight Center Warren F. Case / SGT, Inc.
Van Allen Probes Spacecraft Operations July 29, 2015 Kristin Fretz
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA Presented.
Bits and Pieces. Spacecraft Systems Propulsion –Already discussed Communications Science instruments Power.
EOS Aura Science Team Meeting
1 Presented by Patrick Coronado ( Information provided by NASA/GSFC: Angie Kelly, Bill Guit, and Eric Moyer) Earth Observing System (EOS) Mission Status.
Terra Launched December 18, 1999
Aura Science Team Meeting Mission Operations Working Group HIRDLS – Jim Craft, Chris Hepplewhite Oct 1 - 5, 2007 JPL, Pasadena, Ca.
March 2004 At A Glance autoProducts is an automated flight dynamics product generation system. It provides a mission flight operations team with the capability.
Goddard Space Flight Center High Earth Orbit GPS Flight Experiment AMSAT-OSCAR 40 (AO-40) Frank H. Bauer NASA Goddard Space Flight Center November 1, 2001.
MODIS Collection 6 MCST Proposed Changes to L1B. Page 2 Introduction MODIS Collection History –Collection 5 – Feb present –Collection 4 – Jan.
SS Space Science MO&DA Programs - August Page 1 ACE Instrument Status Report Cosmic Ray Isotope Spectrometer (CRIS) Normal Operation. Electron Proton.
Science of the Aqua Mission By: Michael Banta ESS 5 th class Ms. Jakubowyc December 7, 2006.
Basic Satellite Communication (3) Components of Communications Satellite Dr. Joseph N. Pelton.
MODIS Preprocessing (before L1B) Changes over the Last Year (and looking forward) Chris Moeller and others CIMSS; Univ. Wisconsin July 13, 2004 Thanks.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
By: Kate Naumann And Colleen Simpkins. Aqua is a major international Earth Science satellite mission centered at NASA. It was launched on May 4, 2002.
Spaceweather Working Group Spaceweather Working Group Earth Science Mission Operations Eric Moyer ESMO Deputy Project Manager - Technical
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
1 J. Ranson NASA’s Earth Observing System Terra Mission Update Jon Ranson, Terra Project Scientist Si-Chee Tsay, Terra Deputy Project Scientist NASA’s.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
Page 1 NPOESS Preparatory Project (NPP) VIIRS Calibration Maneuvers May 15, 2008 Ocean PEATE Team.
Terra Status Update including End of Mission Orbit Kurt Thome – Terra Project Scientist Robert Wolfe –Terra Deputy Project Scientist for Data NASA/GSFC.
Lunar observation data set preparation
NASA Aqua.
Calibration and Performance MODIS Characterization Support Team (MCST)
MODIS Lunar Calibration Data Preparation and Results for GIRO Testing
Launch and On-orbit Checkout
CubeSat vs. Science Instrument Complexity
Presentation transcript:

CSPP/IMAPP Users' Group Meeting May 21-23, 2013 EOS Terra EOS Aqua EOS Terra and Aqua Status Angelita (Angie) C. Kelly EOS Science Interface Manager Constellation Mission Operations Manager (MOM) Earth Science Mission Operations Project NASA Goddard Space Flight Center Greenbelt, Md. 20720

Why Fly Constellations? Science is key! Widened orbit lines near viewer to give 3-D effect Constellations form single “virtual” platforms which enable near-coincident observations, thus providing enhanced science

Terra Status Summary Spacecraft Status - GREEN Instrument Status – GREEN ASTER (VNIR and TIR), CERES, MISR, MODIS, and MOPITT: Producing Great Science Data Capture/L0 Processing Status – GREEN SSR Data Capture to 04/30/2013: 99.91% Data Latency – Excellent Ground Systems – GREEN Responding to new security requirements and upgrades to obsolete hardware or COTS systems, as required

Terra Status (details) Spacecraft Bus – Nominal Operations (Very Good Health): All Components remain on primary hardware with te following exception: Direct Access Modulator (X-Band) primary side failed in 2008. No impact to Nominal Operations Battery Cell Failure (1 of 108). No impact to Nominal Operations Battery Heater Control failure (affects 4 of 18 Heater Groups). No impact to Nominal Operations Solar Array Panel Failure (1 of 24) in Sept 2000. No impact to Nominal Operations Solid State Recorder Print Wire Assembly Anomalies (9 of 59 are offline) Operationally able to manage by reducing ASTER data captured and increasing playback opportunities Recycle of Memory Unit likely to recover all PWAs currently offline; not warranted at this time MODIS – Nominal Operations (Very Good Health – some loss of redundancy) All voltages, currents, and temperatures as expected Power Supply Failure (June 2001). Switched to redundant. Formatter Degradation (Sept 2002). Switched to redundant. Solar Diffuser Screen Door Failed to Close (May 6th, 2003); configured to remain open indefinitely in July 2003 Current configuration allows for Nominal Science

Terra Status (additional details) MISR – Nominal Operations – (Excellent Health) All voltages, currents, and temperatures as expected ASTER – Nominal Operations (TIR and VNIR – Excellent Health, SWIR – Failed) All voltages, currents, and temperatures as expected. SWIR – Compressor unable to maintain detector temperature after April 2008. No Science Data VNIR – Nominal Operation TIR – Nominal Operation CERES-FORE and AFT (FM-1 & FM-2) – Nominal Operations (Excellent Health) Cross-Track and Biaxial Modes fully functioning. All channels remain operational. MOPITT – Nominal Operations. (Good Health – loss of redundancy; some blockage) Displacer-B Failure (May 2001). Operating Compressor B at reduced speed to minimize spacecraft disturbance Chopper motor failure resulting in ~3% blockage (August 2001)

Terra Fuel Usage: Actual & Predicted (Updated April 2013) Orbit Raise Maneuvers De-Inclination Maneuver Inclination and Drag Make Up Maneuvers Maintain Orbit, allow MLT to drift Required Fuel Reserve to safely exit 705km Constellation = 42kg Unusable Fuel = 5kg Based on predicted fuel usage, Terra can continue to perform propulsive maneuvers (to maintain the orbit) to support the science requirements into 2020. Mean Local Time (MLT) will drift from 10:30am to 10:15am.

Terra Spacecraft Anomalies Current Status of Battery Power Module Battery (PBAT) has performed superbly throughout mission (No Issues) Hex Bay Battery (BBAT) has experienced one (1) cell failure out of 54 cells and damage to the BBAT heater control Likely caused by a Micro-Meteor or Orbital Debris (MMOD) 10/09 The heater groups that are working are keeping the cell temperatures above -13 ºC Since the anomaly BBAT has been reconfigured to maintain a temperature margin and reduce the stress on the batteries Note: There is significant redundancy that only in the event of a catastrophic failure (multiple anomalies) would we lose an entire battery.  More likely scenario would be a continuing decrease in capacity (loss of cells) over a period of time. Terra Battery Life Capability is projected through May 2020

Terra Spacecraft Anomalies Direct Access System Modulator (DASM) Side 1 failed (February 25th, 2012) Not required for prime mission objectives Attempt to power cycle on 6/4/08 was unsuccessful. On 6/13/08, Switched to DASM-2 cross-strapped with Up-Converter-1 and Solid State Power Amplifier-1. Continuing with Direct Broadcast normal operations. SFE Anomaly (typically 1-2 per year) The Science Formatting Equipment (SFE) is turned off when part of its electronics “hangs” or stops operating properly Probably due to an Single Event Upset (SEU) All science recording stops when the SFE is off Has occurred 28 times since launch So far, the fix has been to turn the SFE back on

Terra MODIS Instrument Status Terra MODIS continues to operate nominally All voltages, currents, and temperatures are as expected Note: MODIS has full redundancy with the following exceptions: • MODIS Power Supply 2 Failure (June 15th, 2001) Power supply shutdown caused by a thermal runaway condition in one of the two Down Regulator FETs Suspected high energy particle as root cause Switch to power supply 1 • MODIS Formatter A Timing Errors (Sept. 10th, 2002) Formatter A exhibited several problems resulting in processing errors Likely cause was an incorrectly terminated clock signal On Sept. 10th, 2002 MODIS science data was affected. Switched to B side on Sept. 17th, 2002, with no further issues • MODIS Solar Diffuser Screen Door Failed to Close (May 6th, 2003) Thermal stress is the most likely cause Solar Diffuser Door was configured to remain open indefinitely in July 2003 Some calibration activities still possible

EOS Aqua Status

Aqua Status Summary Spacecraft Status - GREEN Instrument Status - GREEN AIRS, AMSU, CERES & MODIS: Producing Great Science HSB: Survival Mode since 2/5/2003 AMSR-E: Antenna Anomaly & Spin Down to 0 RPM on 10/04/2011 Spin-Up to ~2 RPM on 12/04/2012; operating at 2 rpm (no science data 2 rpm data will be usedfor calibration with AMSR2 on GCOM-W1 Data Capture/L0 Processing Status – GREEN SSR Data Capture to 04/30/2013: 99.97352898% Data Latency – Excellent Ground Systems – GREEN Responding to new security requirements and upgrades to obsolete hardware or COTS systems, as required

Aqua Summary Details Spacecraft Bus – Nominal Operations (Excellent Health) All Components remain on primary hardware. MODIS – Nominal Operations (Excellent Health) All voltages, currents, and temperatures as expected. AIRS – Nominal Operations (<5% of Channels degraded) – (Excellent Health) ~200 of 2378 channels are degraded due to radiation, however they are still useful. AMSU-A – Nominal Operations for 12 of 15 Channels (Good Health) 3 of 15 channels have been removed from Level 2 processing. CERES-AFT (FM-3) – Nominal Operations (Excellent Health) Cross-Track and Biaxial Modes fully functioning. All channels remain operational. CERES-FORE (FM-4) – Nominal Operations (Good Health) Cross-Track is Nominal. Biaxial Mode is Nominal when used. The Shortwave channel failed on March 30, 2005; the other two channels remain operational. AMSR-E – Operating at 2 rpm; No Science – Calibration Only (Poor Health) Operating at reduced rotation rate for calibration purposes only. HSB – Non-operational since February 2003 anomaly

Aqua Fuel Usage: Actual & Predicted (Updated April 2013) Aqua spacecraft has sufficient fuel to maintain its current orbit within the Afternoon Constellation through early 2022 and possibly beyond Fuel reserved to safely exit constellation, lower perigee, and meet Agency 25-year reentry requirement is approximately 24.5 kg.

Aqua MODIS Instrument Status All voltages, currents, and temperatures are as expected. There are no disturbing trends in any engineering parameter. Aqua MODIS continues to operate on prime equipment. Full redundancy exists except for 10 W Lamps used for calibration Lamps #2 and #3 failed prematurely Able to use remaining lamps for calibration purpose Life Limiting Items Designed 5/4/2002 4/12/2013 SRCA 10 W Lamp #1 (Hours of use) 500 200.2 306.6 SRCA 10 W Lamp #2 1 (Hours of use) 175.7 188.0 SRCA 10 W Lamp #3 1 (Hours of use) 178.5 205.7 SRCA 10 W Lamp #4 (Hours of use) 57.7 114.8 SRCA 1 W Lamp #1 (Hours of use) 5000 499.5 528.2 SRCA 1 W Lamp #2 (Hours of use) 269.8 274.9 Solar Diffuser Door Movements (Open or Close) 3022 1630 3072 2 Nadir Aperture Door Movements (Open or Close) 1316 1046 1053 Space View Door Movements (Open or Close) 624 632 Spectroradiometric Calibration Assembly (SRCA) 10 W Lamp #2 and Lamp #3 are no longer functional. Modified mode of operation to reduce the risk that Lamp #1 and #4 will fail prematurely. Solar Diffuser Door Movements have exceeded design. Use of Door has been reduced from once per week to once every 6 weeks. Use of Screen was reduced from once per week to once every three weeks. Modified calibration is possible if door fails. Aqua MODIS is in Excellent Health

Aqua MODIS Instrument Status All voltages, currents, and temperatures are as expected. There are no disturbing trends in any engineering parameter. Aqua MODIS continues to operate on prime equipment. Full redundancy exists except for 10 W Lamps used for calibration Lamps #2 and #3 failed prematurely Able to use remaining lamps for calibration purpose Life Limiting Items Designed 5/4/2002 4/12/2013 SRCA 10 W Lamp #1 (Hours of use) 500 200.2 306.6 SRCA 10 W Lamp #2 1 (Hours of use) 175.7 188.0 SRCA 10 W Lamp #3 1 (Hours of use) 178.5 205.7 SRCA 10 W Lamp #4 (Hours of use) 57.7 114.8 SRCA 1 W Lamp #1 (Hours of use) 5000 499.5 528.2 SRCA 1 W Lamp #2 (Hours of use) 269.8 274.9 Solar Diffuser Door Movements (Open or Close) 3022 1630 3072 2 Nadir Aperture Door Movements (Open or Close) 1316 1046 1053 Space View Door Movements (Open or Close) 624 632 Spectroradiometric Calibration Assembly (SRCA) 10 W Lamp #2 and Lamp #3 are no longer functional. Modified mode of operation to reduce the risk that Lamp #1 and #4 will fail prematurely. Solar Diffuser Door Movements have exceeded design. Use of Door has been reduced from once per week to once every 6 weeks. Use of Screen was reduced from once per week to once every three weeks. Modified calibration is possible if door fails. Aqua MODIS is in Excellent Health

Maneuvers • Drag Makeup Maneuvers (DMU) -- maintain nominal spacecraft altitude of 705 km • Inclination Adjust Maneuvers -- maintain nominal spacecraft mean local time (descending node) of 10:30 AM. -- Current predictions indicate need to perform 3 Inclination Burns per year (1 in Spring, 2 in Fall) to maintain 10:30am +/- 1 min goal. • Calibration Maneuvers -- MODIS Roll Maneuvers are performed approximately once/month to calibrate MODIS sensors on lunar illumination -- MODIS Lunar Calibration is performed ~4 days after full moon.

DRL/DB Website Screen shot from the DRL/DB website after the addition of a link to the aqua.nasa.gov website for the Aqua status

Orbital Debris Monitoring Orbital debris is a cause for concern by all space missions. Increased number of high interest events for the past 6 months NASA has an agreement with the US Air Force to provide notification of predicted conjunctions between Constellation satellites and other maneuverable and non-maneuverable space objects (e.g., orbital debris). This is implemented by the Robotic Systems Protection Program at Goddard.

SUMMARY Both EOS Terra and Aqua are operating nominally Both satellites have exceeded their design life (6 years) Terra is on its 14th year Aqua is on its 11th year Both satellites are producing excellent science Realtime operational application is valued Terra is projected to operate through ~2020 Aqua is projected to operate through 2022 and even beyond