5/14/2019 Scintillator extrusion at FERMILAB (Joint FERMILAB-NICADD project) Victor Rykalin Victor Rykalin
$579,200 all included. 4-Apr-02 DHC 5000*5=$25000 5/14/2019 $579,200 all included. 4-Apr-02 By September 15/02 we paid $173,760 By ~December we should pay $ 405,440 BICRON , KURARAY 1kg~ $200 EXTRUDED(Outside) 1kg~$10 EXTRUDED(Fermilab) 1kg~$5 DHC 10 6 * 0.005 kg=5000 kg DHC 5000*5=$25000 5/14/2019 Victor Rykalin Victor Rykalin
ZE 40A UTS Technical Data OUTPUT 50-300 Pounds/hour Screw diameter Screw speed Drive power Exp. Output Height Weight Theoretical life DHC(min) 44 mm 1200 RPM 200 HP Det. By trials ~1100 mm ~3500 kg ~40000 hours 28(8hours) shifts 5/14/2019 Victor Rykalin
FERMILAB-NICADD 5/14/2019 Victor Rykalin
First steps. Extrusion through the known die, 2 dies(check how the die simulation works). Light output measurements. Extrusion through the hexagonal shape (we need new designed and manufactured die). Extrusion of the different scintillator shapes. 5/14/2019 Victor Rykalin
5/14/2019 Victor Rykalin
What will be as an output ?! 5/14/2019 Victor Rykalin
What will be as a result ?! 1MIP produce ~20000 Photons we detect(VLPC) ~40 Photons 5/14/2019 Victor Rykalin
Potential uses for the extruded scintillator. CKM-Photon veto system (strips) KOPIO (BNL)-Photon veto (strips) MECO (BNL)-Electron trigger Calorimeter(strips) OPERA(CNGS)- Tracker(strips/WLS) NoE(CNGS)-Fe/scintillator strips K2K- scintillator strip hodoscope LC-Muon Detector System (strips) LC-Hadron Digital Calorimeter (cells) 5/14/2019 Victor Rykalin