Christ the King Catholic Church Addition

Slides:



Advertisements
Similar presentations
Presentation Developed Prior to Input From 12/17/03 Adobe Collaborative Meeting Adobe Upper Reach 5 Conceptual Plan Issues December 9, 2003 Workshop.
Advertisements

Presents. Clubhouse lower level Renovation December 2013.
C HANTILLY N ATIONAL G OLF A ND C OUNTRY C LUB Annual Meeting February 19, 2009 G OLF A ND C OUNTRY C LUB C HANTILLY N ATIONAL Restoration and Renovation.
Park School Modernization Summer New paint, new glass, new landscape, new flagpole, and new paving Before After Entry.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Welcome to Our House. The Add On Project The tear down The slab Framing the Walls.
Campus signage – Internal
Boren School Preparing an existing wall to receive structural improvements.
Wilson School Construction 2014 Tearing out the old courtyard to put in the new sewer line.
Stairs to Main Level Lower Level – P. 1 Garage Unfinished.
Architecture Hall Assessed By: Jillian Petrin, Julia Terlinchamp, Gabriel Wan, Brian King, & Amelia Albert.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
1 Presentation 38: STAIR SAMPLE CALCULATION. 2 Sample Stair Calculation 8′-0″ 11 ¼″ Given: –Upper Const. = 11 ¼″ –Floor to ceiling = 8′-0″ –Headroom =
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Church Renovation/ Expansion Proposals Willowdale.
Sandy Grove Presbyterian Church Fort Bragg Cultural Resources Management Program (CRMP)
STATUS of 6m ANTENNA BASE Matt Fleming 8/24/04 Note 6m = BIMA.
Furnishing example FURNISHING SOLUTION FOR CAVTAT HOUSE.
Quarryville and High School Project Cost Estimates September 2013.
Archdiocese of Boston Brockton Regional Proposal Presentation to Parents, Teachers & Staff January 28, 2007.
CAREER PLANNING Is a life long process a person goes through to learn about himself, develop self concept & learn about career choices.
Ceiling Framing Unit 32.
FORUM Presented by ART GUADANO, AIA, LEED AP BD+C DURHAMTOWNHALL.
AP Calculus BC September 2, 2015 Day 3 - §1.4 Continuity and One-Sided Limits.
Schematic design presentation School of Business South Hall Renovation.
By: Sheldon Miller.  Find a computer in the library and login.
A PLAN TO BUILD AN ELEVATOR October 15, Long-Range Plan –Office-size Elevator –New Fireproof Stairs –Handicap-Accessible Restrooms –Large Multi-purpose.
HIGH SCHOOL PROJECT PLANNING MEETING October 14, 2013 Crabtree, Rohrbaugh & Associates, Architects Agenda Schematic Design Concept D Option – 1 Site Floor.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
CONTRACT * ___________ Office/Corporate – 14,999 sf and under ___________ Office/Corporate – 15,000 to 34,999 SF ___________ Office/Corporate – 35,000.
The Victorian Gazebo Assembly Instruction By Laser Dollhouse Designs.
` riddle design 25 January 2009 Emmanuel Episcopal Church Formation Addition and Renovations.
Plans to achieve our goals were approved unanimously by the Temple Board on June 11, 2008, and by the congregational meeting on June 22nd without a dissenting.
I rejoiced when they said to me, “Let us go to the house of the Lord.” There the tribes go up, the tribes of the Lord, As it was decreed for Israel, to.
RESIDENTIAL: ________________________________________________________________________________ Category: Please select the category that best describes.
O’Gorman High School O’Gorman Intermediate Catholic School Sacred Heart School St. Paul School 383 Birch Street North 101 Spruce Street North.
Attic Lift Team Up Phillip Nichols – Mark Zoller – Chris Jacobs – Ed Fleiss – Josh Marcy June 11, 2008.
Assignment and Assessment n CAL Evaluation and Presentation(20%) n Essay or Project work (80%)
Sauriol Bohde Wagner architects and associates, inc Garfield Road Macomb, Michigan ph fx.
Old car vs. New Car The Choice The Sticker Price $ 5.2M The Cost of the Old Car “We are approaching the practical limit of functionality for that building”
Cambridge Lower Secondary
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
PRINCE Of WALES First Floor Portable 4 Portable 2 To Mini School
Using Base Ten Blocks to Make Numbers to 100
Bach Chorale for the end of the liturgical year
Project: Facility Name Location: City, State Entry #: Enter Here
Penn Medicine Chester County Hospital
Interior Design Designing Functional Interiors & Floor Plans
Project: Facility Name
New York City Master Plan Update
SERRA CATHOLIC SCHOOL – SOUTH BUS ROUTE
Continuity and One-Sided Limits
Project: Facility Name Location: City, State Entry #: Enter Here
,
Roslin Primary School.
The Garage Assembly Instruction By Laser Dollhouse Designs
STAIR SAMPLE CALCULATION
KOMPLEX Investors Report – Q
Humanities and Social Sciences Upper Level Northeast: Accessible Entrance
THE FAÇADE READY FOR PAINTING AND CLADDING COMPLETION.
A step function has the same y-value for several x-values and then steps up or down to another y-value.  The graph looks like stair steps.
Presenting your side The Visual
Year 2 RESULTS 2015 WELL DONE TO ALL PUPILS AND STAFF INVOLVED
Post Construction Cleaning services are in huge demand these days. Most of the people living in major cities are finding it hard to hire a Post construction Cleaning service .Moreover, if you are selecting a Post Construction Cleaner from reputed cleaning
The New Leavelle McCampbell Middle School
BISI BADMINTON RESULTS WELL DONE TO ALL PUPILS AND STAFF INVOLVED

Governors club interior renovation
Immaculate Heart of Mary
Presentation transcript:

Christ the King Catholic Church Addition Christ the King Catholic Church Addition 09 September 02008 Christ the King Catholic Church Addition 1599 Tunner Drive, Courtenay, BC Board Presentation – 09 September 02008

Conceptual Design Meeting No. 08 Christ the King Catholic Church Addition 09 September 02008 Conceptual Design Meeting No. 08 Review previous conceptual work; Review latest conceptual design work; Concept Design Discussion; Next Steps;

New Conceptual Designs “J & K” Christ the King Catholic Church Addition 09 September 02008 New Conceptual Designs “J & K” Challenge; Use vaulted ceiling option Create a better entrance Two Entry Options Slot entry Side entry

New Conceptual Designs “J & K” Christ the King Catholic Church Addition 09 September 02008 New Conceptual Designs “J & K” After brief design meeting; Preferred Option K Side entry

Christ the King Catholic Church Addition 09 September 02008 LOWER FLOOR LEVEL

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008 UPPER FLOOR LEVEL ENTRANCE WIDENING RENOVATIONS TO BE DONE AFTER ADDITION COMPLETED - NEW ELEVATOR INSTALLED IN LOCATION OF EXISTING STAIR WELL AFTER ADDITION COMPLETED

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008

Christ the King Catholic Church Addition 09 September 02008 Concept Evaluation:

Christ the King Catholic Church Addition 09 September 02008 Concept Cost:

Next Steps: Determine Preferred Concept; Prepare presentation package; Christ the King Catholic Church Addition 09 September 02008 Next Steps: Determine Preferred Concept; Prepare presentation package;