ZDD status BESIII Collaboration Meeting, September 2012

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ for BTF o BTF Overview o Hardware Overview o DAQ Software Description o What’s next o Summary Jean-Sebastien.
Feb 2006Jean-Sébastien Graulich PID Front End Electronics, Outlook after DAQ Workshop 02 Jean-Sebastien Graulich, Univ. Genève o Introduction o Tracker.
DAQ WS02 Feb 2006Jean-Sébastien GraulichSlide 1 Does IPM System Matches MICE needs ? Personal Understanding and Remarks o General Considerations o Front.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
LarTPC Electronics Meeting Current Work at MSU Fermilab Dan Edmunds 23-February-2010.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
LKr readout: present and future R. Fantechi 30/8/2012.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
MICE CM18 June 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Since CM17 o Detector DAQ software o Front End Electronics o Schedule Milestones.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Prototype Test of SPring-8 FADC Module Da-Shung Su Wen-Chen Chang 02/07/2002.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
LKR Working group Introduction R. Fantechi October 27 th, 2009.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE JRA1 Parallel - DAQ Status, Emlyn Corrin, 8 Oct 2007 EUDET Annual Meeting, Palaiseau, Paris DAQ Status.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
Online Reconstruction 1M.Ellis - CM th October 2008.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
CLAS12 Trigger System part1: Level1 EC Revision 1, Feb 7, 2007.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
X SuperB Workshop - SLAC Oct 06 to Oct 09, 2009 A.Cotta Ramusino, INFN Ferrara 1 SuperB IFR: outline of the IFR prototype electronics A.C.R
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Online – Data Storage and Processing
Pid session TDC-based electronics for the CRT
CLAS12 DAQ & Trigger Status
LKr status R. Fantechi.
Modifications to the DRS4’s code
LAV front-end and readout status
Baby-Mind SiPM Front End Electronics
Jean-Sebastien Graulich, Geneva
AHCAL Beam Interface (BIF)
PADME L0 Trigger Processor
Ongoing R&D in Orsay/Saclay on ps time measurement: a USB-powered 2-channel 3.2GS/s 12-bit digitizer D.Breton (LAL Orsay), E.Delagnes (CEA/IRFU) Séminaire.
ProtoDUNE SP DAQ assumptions, interfaces & constraints
VELO readout On detector electronics Off detector electronics to DAQ
Status of the Crystal Ball
CLAS12 Timing Calibration
BESIII EMC electronics
Tracker Software Status
Commissioning of the ALICE-PHOS trigger
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
Testbeam status report
The LHCb Front-end Electronics System Status and Future Development
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Presentation transcript:

ZDD status BESIII Collaboration Meeting, September 2012 A. Calcaterra, for the ZDD group (LNF/PG, TO)

BESIII Physics and Software Workshop Talk outline ZDD performance in the 2011-2012 run Hardware problems …and ways to solve them Software problems Outlook on the future run 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop 2011-2012 data taking ~OK ZDD took data most of the time, in automated way, at the same time with BESIII About 3000 runs on disk, for total of 1.8 TB DAQ run separately from BESIII, on a PC DAQ caught BESIII start-of-run and end-of-run, and closed/open files with the BESIII run number in the filename Thanks to Li Fei and the DAQ group for explanations about the DIM service! 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop Not-so-good news All L1 triggers sent to the ZDD crate …but disagreement between BESIII and ZDD on the number of triggers in many runs Most of this should be due to faults in the NIM crate (see next slide) Also, 512-event pipe in the FADC fill-up if Slow reading caused by the USB connection Sometimes high backgrounds/trigger rate 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop VME crate with a CAEN controller connected to the PC, MCC for generating L1 trigger, TDC and 2 FADC’s (NIM trigger input) ZDD DAQ PC USB connection L1 reformatted NIM standard PM signals to digitizers NIM crate Trigger conversion and multiplexing ZDD channel amplifiers/shapers BESIII L1 standard (LVPECL) from MCC card 2012/09/16 BESIII Physics and Software Workshop

Solving the trigger problem The electronic LNF service designed and built a VME passive board that converts levels from the BESIII standard and serves the L1 trigger to the FADC digitizers in a NIM standard No more need for NIM converter and splitter 2012/09/16 BESIII Physics and Software Workshop

The NIM crate itself is a problem Quite old, very “tired” Repaired many times already Could die anytime! We want to eliminate it altogether The LNF electronics service is redesigning the ZDD amplifiers/shapers in a new format, to fit the (newer) VME crate 2012/09/16 BESIII Physics and Software Workshop

Firmware problem 1 (small) One year ago, CAEN made a change for BESIII Introduced a “readout window” in addition to a “memory window”. This was tested OK. Soon after run start, we found out that CAEN data compression (ZLE) was needed . This did not work, creating “spurious” data. Memory window: 8 ms Readout window L1 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop False peaks, baseline below threshold 2012/09/16 BESIII Physics and Software Workshop

Firmware problem 2 (big) The “compressed” mode is delicate Under some (combination of) conditions some individual bytes are not read out High rates? Problematic run startup? The event can not be reconstructed and is lost! CAEN finally produced a new firmware in which this problem is eliminated 2012/09/16 BESIII Physics and Software Workshop

Is data compression needed? In our PC-based DAQ yes Without it we could not follow the L1 trigger rate, because of the USB connection In a future VME-only, BESIII standardized way, also yes Because of data size 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop At the end of past run Both Flash ADCs from CAEN were handed to the DAQ group in BESIII There is ongoing work on integrated DAQ between BESIII and ZDD 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop For next run Trigger problem should be fixed If we are fast (and lucky) the NIM crate will not be there anymore DAQ will be integrated in the general BESIII data stream To be done: ZDD offline event reconstruction 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop Conclusion The ZDD group thanks everybody in BESIII for the help given on installation of ZDD detector and electronics, and on DAQ software …will ask for more help later ;-) Hopefully, will start next run to use the ZDD in BESIII analyses 2012/09/16 BESIII Physics and Software Workshop

BESIII Physics and Software Workshop Why separate DAQ’s in 2011-2012? Most important reason: lack of time ZDD was installed during August 2010 A few tests in cosmics rays were needed, and were done in September/October It simply could not be done in time Also important: we felt at the time that not enough was known on the V1721 Flash Digitizer to ask for an effort by DAQ group 2012/09/16 BESIII Physics and Software Workshop