PWCS Fifth Edition DIVISION 1000 Edits

Slides:



Advertisements
Similar presentations
Measurement for Civil Engineering works
Advertisements

Module 4: Temporary Sediment Controls. Learning Objectives n Identify locations for sediment control BMPs n Identify applications for different types.
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Chapter 3 Measuring Excavation and Sitework
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Drainage.
Building Green in Bowling Green
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
1 Best Management Practices -Structural Measures – Level II: Introduction to Design Education and Certification for Persons Involved in Land Disturbing.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
Volume of a Rectangular Prism
Volume of Rectangular Prisms
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
1 Class Exercise  Soil Stabilization  Sediment Controls  Verify the contractors calculations for the quantity of material need to stabilize a Disturbed.
For Stormwater Treatment and Flow Control Dan Cloak Environmental Consulting December 14, 2010 Contra Costa Clean Water Program.
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
Inspecting Construction of Bioretention Facilities Carlton Thompson and Jeff Cowling.
Volume word problems Part 2.
Volume McNeely. What is it? The amount of space occupied by a 3-d figure. How much a 3-d figure will hold.
1 Common Issues on Site Re-certification Training For Level IB Advanced Fundamentals Certified Inspector Issued May 2009.
Structures Protect Structural Integrity Wood/less durable check dams vs. stone/more durable check dams Green Girl LDS.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
1 Field Maintenance of Structural and Vegetative Measures Level 1A: Fundamentals Seminar Education and Certification for Persons Involved in Land Disturbing.
1 Best Management Practices -Structural Measures – Level IB: Advanced Fundamentals Education and Certification for Persons Involved in Land Disturbing.
Operations & Maintenance Considerations Dave Lawson Electrical Maintenance and Operations Supervisor.
Surface Area and Volume
Bell Work: Find the total surface area of this figure. Use 3.14 for π. 6 cm 10 cm.
Volume Performance Task Rectangular Prisms
Finding VOLUME DeMarco. The OBJECTS FORMULA? L x W x H Length = 6cm.
Finding VOLUME. What is VOLUME? The amount of space that a 3-dimensional object takes up. Anything that exists, has volume…
GUTTERS and INLETS Gutter : A gutter is a triangle open channel along the curb stone of streets which carry the storm water along streets to inlets. Inlets.
The Pennsylvania Horticultural Society motivates people to improve the quality of life and create a sense of community through horticulture.
Unit 10-Day 1 Squares: Area and Perimeter
1 Best Management Practices -Structural Measures – Level IA: Fundamentals Education and Certification for Persons Involved in Land Disturbing Activities.
Does (x+4) 2 = x ?. A square tabletop has side lengths of (4x – 6) units. Write a polynomial that represents the area of the tabletop.
Power Point on Area - 5 th Grade. What is a Quadrilateral?
2016 Manual for Erosion and Sediment Control Updates
Warm-Up #1 11/30 1. Write down these 3 formulas:
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
FORM 1003A – NOTICE OF TEMPORARY EXEMPTION FROM PLUGGING.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
SECTION 8 - RACKING (BRACING) AND SHEAR FORCES STUDENT HANDOUT
Construction of On-Site Stormwater Treatment and Flow Control Facilities Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Detailed planning for fish farm construction Once the site has been selected, then initiation of planning begins. There are two main related components.
Design and Construction of Composite Lined Landfills
EXAMPLE A 400 m2 (40 x 10 m) area is to be excavated, 1 m deep, with side slopes 2:1. As the width (10 m) is less than 30 times the depth (30 x 1 m), the.
EFFECTIVE EROSION AND SEDIMENTATION CONTROLS FOR IN-CHANNEL PROJECTS
Spring and Summer Maintenance of Stormwater Management Practices
Designing Swales Norman W. Garrick CE 4410 Spring 2017 Lecture 15.
Expression Session Summarise “stream discharge” and “river load” using diagrams to assist your answer.
Profile Leveling.
Storm Water Pollution Prevention Plan Development
Chapter 3 Section 3 Types of Maps Objectives
Mass & Volume 6th grade.
Drawing Interpretation
WORKSHOP I: Green Infrastructure Overview and Maintenance
Starter Calculate the area of the following shapes 6m 120mm 110mm 4m
EPA Public Meeting Dallas, Texas May 10, 2005
Volume of a Rectangular Prism
Site Plan Requirements
Name:________________ Date:_________________ Class Period:___________
2 types of scale factor problems
Power Point on Area- 5th Grade
#8. Matthew is making a place mat for his mother as shown below.
Public Works Standard Drawings Subcommittee Meeting
Presentation transcript:

PWCS Fifth Edition DIVISION 1000 Edits As of 10/19/2018

Replacing Original Drawing 1020 SILT FENCE Replacing Original Drawing 1020

1020B

1030A Swale For swale material, see Note 6 Longitudinal slope max. For swale material, see Note 6 Update Drawing Date

1030B Replace “grades” with “longitudinal slopes” 95 swale STABILIZED RIP-RAP PLANS SEE NOTES 9 AND 10. 95 9. For temporary stabilization rip-rap; width, depth, and surface water elevation should be designed by owner or owner’s representative. 10. Refer to Drawing 1230A and B for turf reinforcement mat. 11. See integrated Stormwater Management Manual for more information on interceptor swale. Update Drawing Date

1040A See Note 5 Update Drawing Date

1040B New Drawing Taken from iSWM manual to accompany 1040A Arrows are upside down STANDARD DRAWINGS 1030A AND 1030B. Standard Specification Reference 202.7* Date Standard Drawing No. 1040B New Drawing Taken from iSWM manual to accompany 1040A

1040C Replace “grades” with “longitudinal slopes” Refer to Item 202.7 in the Standard Specifications. Replace “grades” with “longitudinal slopes” swale STABILIZED RIP-RAP SEE NOTES 8 AND 9. PLANS 7. See integrated Stormwater Management Manual for more information on interceptor swale. 8. For temporary stabilization rip-rap; width, depth, and surface water elevation should be designed by owner or owner’s representative. 9. Refer to Drawing 1230A and B for turf reinforcement mat. Update Drawing Date

1050A Replacing Original Drawing 1050A 6” x 6” OR 4” x 4” WELDED WIRE MESH STRUCTURE deep Standard Specification Reference 202.8 * Date Standard Drawing No. 1050A Replacing Original Drawing 1050A

1050B 6” x 6” or 4” x 4” WELDED WIRE MESH Update Drawing Date

Replacing Original Drawing 1060A H H H HEIGHT (H) AND SPACING (L) OF CHECK DAM AS PROVIDED IN PLANS BY OWNER OR OWNER’S REPRESENTATIVE. PROVIDE CALCULATIONS UPON REQUEST OF THE REVIEWING AGENCY. Replacing Original Drawing 1060A

1060B

Replacing Original Drawing 1070A EXIT Replacing Original Drawing 1070A

*REPLACE “ENTRANCE” WITH EXIT THROUGHOUT 1070B *REPLACE “ENTRANCE” WITH EXIT THROUGHOUT

1080 Replacing Original Drawing 1080A Standard Specification Reference HEIGHT (H) AND SPACING (L) OF CHECK DAM AS PROVIDED IN PLANS BY OWNER OR OWNER’S REPRESENTATIVE. PROVIDE CALCULATIONS UPON REQUEST OF THE REVIEWING AGENCY. Replacing Original Drawing 1080A Standard Specification Reference Date Standard Drawing No. New Drawing

1090 HEIGHT (H) AND SPACING (L) OF CHECK DAM AS PROVIDED IN PLANS BY OWNER OR OWNER’S REPRESENTATIVE. PROVIDE CALCULATIONS UPON REQUEST OF THE REVIEWING AGENCY. (H) New Drawing Taken from iSWM manual to accompany Figure 2.3/1080 replacement Standard Specification Reference Date Standard Drawing No. New Drawing

1100 Replacing Original Drawing 1090 Standard Specification Reference 202.12* Date Standard Drawing No. Replacing Original Drawing 1090 NOTES: ACTUAL DIMENSIONS OF THE SEDIMENT TRAP SHALL BE DESIGNED BASED ON FLOW CONDITIONS AND SITE TOPOGRAPHY. PROVIDE CALCULATIONS UPON REQUEST OF THE REVIEWING AGENCY. DESIGN OF VOLUME, HEIGHT, SLOPE, AND LENGTH AS PROVIDED IN PLANS PROVIDED BY OWNER OR OWNER’S REPRESENTATIVE.

1110 New Drawing Taken from iSWM manual to accompany SIDE (move to this side) Remove internal leader line NOTES: ACTUAL DIMENSIONS OF THE SEDIMENT TRAP SHALL BE DESIGNED BASED ON FLOW CONDITIONS AND SITE TOPOGRAPHY. PROVIDE CALCULATIONS UPON REQUEST OF THE REVIEWING AGENCY. DESIGN OF VOLUME, HEIGHT, SLOPE, AND LENGTH AS PROVIDED IN PLANS PROVIDED BY OWNER OR OWNER’S REPRESENTATIVE. New Drawing Taken from iSWM manual to accompany Figure 3.30/1090 replacement Standard Specification Reference 202.12* Date Standard Drawing No.

Replacing Original Drawing 1100 1120 FLOW FLOW PERFORATED RISER Replacing Original Drawing 1100 Note: Pipe size, rock size, and berm height as provided in plans by owner or owner’s representative Optional: A collar of 1.5-3 inch, well graded gravel (not shown) may be placed around the perforated riser

ORIGINAL PWCS DRAWING 1130

Possible replacement for Original Drawing 1110 iSWM EQUIVALENT - 1110 Possible replacement for Original Drawing 1110

Will replace Original Drawing 1120 1140 To Be Updated by Halff Will replace Original Drawing 1120

1150 BLOCK AND GRAVEL

Will replace Original Drawing 1150 To Be Updated by Halff Will replace Original Drawing 1150 1160

1170 ORIGINAL PWCS DRAWING BLOCK AND GRAVEL

Possible replacement for Original Drawing 1140 iSWM EQUIVALENT - 1140 Possible replacement for Original Drawing 1140

Replacing Original Drawing 1160A

Replacing Original Drawing 1160B

Taken from iSWM manual to accompany To Be Updated by Halff Will accompany Figure 2.8 1180B New Drawing Taken from iSWM manual to accompany Figure 2.7/1160 replacement

To Be Updated by Halff New Drawing Taken from iSWM manual

To Be Updated by Halff New Drawing Taken from iSWM manual

New Drawing Grouted Rock Rip-Rap Halff Associates 2018 Update 1200 New Drawing Grouted Rock Rip-Rap Halff Associates 2018 Update

New Drawing Stream Trash Catch/Screen Halff Associates 2018 Update 1210 New Drawing Stream Trash Catch/Screen Halff Associates 2018 Update

Potential Additional Drawings The following schematics were either updated by Halff Associates in 2017 or have been tasked to Halff Associates to update in 2018/2019

To Be Updated by Halff Associates in 2018/2019

Updated by Halff Associates in 2017

To Be Updated by Halff Associates in 2018/2019

Updated by Halff Associates in 2017

Updated by Halff Associates in 2017

Updated by Halff Associates in 2017

Updated by Halff Associates in 2017

Updated by Halff Associates in 2017

Updated by Halff Associates in 2017

To Be Updated by Halff Associates in 2018/2019