Reviewing Technical Committee Configuration

Slides:



Advertisements
Similar presentations
World Class Standards Recommended Improvements to The ETSI Standards Engineering Process Hans van der Veer Chair OCG-IOP & Steve Randall STF308 OCG#32,
Advertisements

INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
GSS 2012 Round Table for Global Standards Collaboration Kyu-Jin WEE TTA Vice President 19 November 2012 TTA.
1 Progress of CCSA’s Activities in 2008 China Communications Standards Association.
DOCUMENT #:GSC15-PLEN-11 FOR:Presentation SOURCE:TTA AGENDA ITEM:Plenary 4.8 TTA activities since GSC14 Keun Hyeob LEE, TTA President.
GSC: Standardization Advancing Global Communications Progress of Communication Standardization Activities in CCSA, 2005 Gaofeng Zhu , The Chairman of the.
Global Standards Collaboration (GSC) GSC-15
GSC-19 Meeting, July 2015, Geneva CCSA Report Zemin Yang, Secretary-General, CCSA Document No:GSC-19_012 Source:CCSA Contact:Zemin Yang Agenda Item:2.3.
April 2003The Telecommunication Technology Committee 1 April 2003 The Telecommunication Technology Committee TTC Activities.
TTC’s Activities on NGN TTC/NGN Advisory Group GSC9, Seoul SOURCE:TTC TITLE:TTC’s Activities on NGN AGENDA ITEM:5 CONTACT:Kazunori MATSUO,
GSC9_004 SOURCE:TTC TITLE:TTC Activities AGENDA ITEM:4.0 PSO Presentation 18/10/2015 May 2004 The Telecommunication Technology Committee TTC Activities.
DOCUMENT #:GSC15-PLEN-06 FOR:Presentation SOURCE:CCSA AGENDA ITEM:4.3 Recent Progress of CCSA ’s Standardization Activities.
GSC May Ottawa, Canada1 3GPP2 – From Sydney to Ottawa Gerry Flynn Verizon Wireless 3GPP2 Steering Committee Vice-Chair.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
International Telecommunication Union ITU Workshop on Standards and Intellectual Property Rights (IPR) Issues Yukio Hiramatsu Chairman, TTC IPR Committee.
ITU Workshop on “Voice and Video over LTE” Geneva, Switzerland, 1 December 2015 ACTIVITIES OF THE ITU-T SG11 TOWARDS IMS AND VoLTE/ViLTE INTEROPERABILITY.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Jeju, 13 – 16 May 2013Standards for Shared ICT Activities of Wireless LAN Systems R&D Group in ARIB Kohei SATOH Managing Director, ARIB Document No: GSC17-GRSC10-02.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
Introduction to 3GPP2 cdma2000 Technology Workshop Ms. Jane Brownley Chair, 3GPP2 Steering Committee
Omniran IEEE 802 Scope of OmniRAN Date: Authors: NameAffiliationPhone Max RiegelNSN
28-30 March, th CJK Standards Meeting, Tokyo 1 March 2005 The Telecommunication Technology Committee (TTC) Standardization Activities.
World Class Standards 44TD21 The ETSI Standards Engineering Process STF308 DTR/MTS Steve Randall STF308 © ETSI All rights reserved MTS#44 March.
TTA Standardization Activities
Network Management Overview
GSC-16 Closing Plenary Summary Report
Recent Progress of CCSA’s Standardization Activities
Status report on CJK NGN Working Group
Global Standards Collaboration (GSC) GSC-15
IEEE 802 OmniRAN EC SG July 2013 Conclusion
Bruno Chatras, ETSI TC TISPAN Vice-Chairman
ETSI EMTEL (Special Committee on Emergency Communications)
SCC Funding Resources Campus Based Accounts
TTC Activities on IPR in Standards
Status report on CJK NGN Working Group
Updates Key areas of CCSA action: Next Generation Network: SDN, NFV
Home Networking activities in TTC
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
IPTV Standardization and Services in Japan
GSC-17 Closing Plenary Summary Report
Corresponding system to ITU in Korea
TTA activities on IMT-Advanced
TTA Standardization Activities since GSC10
TTA activities and Future Direction
GSC-17 Closing Plenary Summary Report
Global Standards of IPTV and its infrastructural framework
Mr. Cleveland Thomas Vice Chairman Working Party 2/3 Study Group 3 ITU-T.
IP and NGN Projects in ITU-T Jean-Yves Cochennec France Telecom SG13 Vice Chair Workshop on Satellites in IP and Multimedia - Geneva, 9-11 December 2002.
Recent IPTV standardization and business model in Japan
Standardization activities on NGN in CCSA
GSC: Standardization Advancing Global Communications
Liu Duo CJK4_014 NGN activities in CCSA Liu Duo
ETSI Activities Related to IP and Multimedia
IEEE 802 Scope of OmniRAN Abstract
Standardization Activities in TTC
Global Collaboration on Future Network Standardization
GSC-16 Closing Plenary Summary Report
TTA′s Transposing Plan Mar
Recent Progress of CCSA’s Standardization Activities
Standardization Activities in TTC
Architecture and Protocols
Recent Standardization Activities on NID
July 2004 The Telecommunication Technology Committee
GTSC-4 Chair: Anil Kripalani Secretary: Henry Cuschieri
ASME A17 Committee Structure
Activities of ARIB on IMT Standards
ETSI–3GPP NGN ACTIVITIES
ITU-T SG16’s involvement in Car Communications
3gpp-liaison-report-may-2005
Presentation transcript:

Reviewing Technical Committee Configuration June, 2002 The Telecommunication Technology Committee TTA-ARIB/TTC-CCSA Meeting June 2002

Necessity for Reviewing (1) -- Circumstances Surrounding the TTC -- - The ITU-T-oriented committee configuration of the TCC does not match the recent external situations. - The TTC has started to work mainly on the IP technology and in more diverse fields. - The TTC should reinforce its organization for cooperating with outside organizations (such as the GSC). TTA-ARIB/TTC-CCSA Meeting June 2002

Necessity for Reviewing (2) -- Inside the TTC -- - Increasing number of instances in which, in addition to a two-level structure of Technical Committees and Working Groups, an SWG is set up to carry out standardization (resulting in three-level hierarchy). TTA-ARIB/TTC-CCSA Meeting June 2002

TTA-ARIB/TTC-CCSA Meeting June 2002 Approach to Reviewing - Extensively review the way Technical Committees and other groups are organized. - Organize Technical Committees and other groups in such a way that they can swiftly catch up with changing times. -- Top-down functions -- Simple hierarchical structures - Allow for committee activities linked with those of the GSC, NGN, and others. TTA-ARIB/TTC-CCSA Meeting June 2002

Present Committee Configuration Strategic Research and Planning Committee Present Committee Configuration Technical Committee 1 (Network-Network Interface) Technical Committee 2 (User-Network Interface) Technical Assembly (TA) Technical Committee 3 (PBX, LAN) Coordination Committee Technical Committee 4 (High Layer Protocol) Technical Committee 5 (Multimedia Service Systems and Coding Scheme) Technical Committee 6 (Mobile Communications) TTA-ARIB/TTC-CCSA Meeting June 2002

Rough Plan Overview (Overall Image for Future)   Technical Assembly (TA) Working Groups Allocate a manager (tentative name) to administrate each Working Group TB - Administrate the activities of Working Group. - Plot out mid- and long-term strategies for standardization. - Select new standardization theme. - Abolish or merge Working Groups. - Take up the functions of the Coordination Committee. TTA-ARIB/TTC-CCSA Meeting June 2002

Rough Plan for New Committee Configuration - Abolish Technical Committees and centrally place Working Groups for standardization activities. - Categorize Working Groups, allocate a manager for each category for administrating the activities of the Working Groups in the category. Network division, information and communications division, and mobile division TTA-ARIB/TTC-CCSA Meeting June 2002

TTA-ARIB/TTC-CCSA Meeting June 2002 New Working Groups - Reconstruct groups for new activity fields. - Abolish or merge the existing Working Groups according to the situations of their activities. - Organize the groups such that they allow for linkage with the NGN. TTA-ARIB/TTC-CCSA Meeting June 2002

Technical Board (tentative name) (1) - Set up the Technical Board as a core organization for handling the TTC’s strategies for standardization. - Configure the Technical Board with the chairman and vice-chairman of the Technical Assembly, manager (tentative name), and secretariat. - Allocate the manager (tentative name) as a promoter for standardization in a specific field (category) and put Working Groups in charge of the manager. TTA-ARIB/TTC-CCSA Meeting June 2002

Technical Board(tentative name) (2) - Abolish the Coordination Committee, and have the TB take up its functions (such as deliberating draft standards to be brought up to the Technical Assembly). TTA-ARIB/TTC-CCSA Meeting June 2002

Schedule for Future Reform First half of fiscal 2002 Second half of fiscal 2002 Fiscal 2003 <1> Abolishing or merging Working Groups Technical Assembly <2> Reviewing the rules and procedures Technical Assembly Finalizing reform plan Establish the TB, and abolish the Technical Committees and Coordination Committee. TTA-ARIB/TTC-CCSA Meeting June 2002