Strategic Plan and Economic Upgrade Process

Slides:



Advertisements
Similar presentations
Cleco Transmission Planning Summit 2013
Advertisements

Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Cleco Transmission Planning Summit 2011 Coughlin Transmission Operations Center April 15, :00 – 11:00am.
Congestion Management in a Market Environment 2 nd CIGRE / IEEE PES International Symposium San Antonio, Texas October 5, 2005 Kenneth W. Laughlin.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Entergy Transmission Planning Summit New Orleans, LA July 31, 2007
ICT 2011 Reliability Assessment and Construction Plan Evaluation Entergy Transmission Summit August 11, 2010 Sheraton New Orleans, Louisiana.
1 Entergy Louisiana, LLC (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Voltage Stability and Reactive Power Planning Entergy Transmission Planning Summit New Orleans, LA July 8, 2004 Entergy Transmission Planning Summit.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ICT Strategic Transmission Plan (ISTEP) Review and Status Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana Douglas.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Generator Interconnection Status Update Tom Lanigan Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
ISTEP Phase II Final Report Summary LTTIWG Meeting – January 27, 2009 Douglas Bowman, PE Lead Engineer, ICT Planning
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
1 Interconnection Update Jay Zimmerman Manager, Transmission Policy Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
SPP.org 1. ICT Construction Plan Evaluation and Reliability Assessment Part 1 Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans,
SPP.org 1. Southeastern Inter-Regional Planning Update (SIRPP) Entergy Transmission Summit August 11, 2009 Astor Crown Plaza New Orleans, Louisiana.
1 Stability Issues in Entergy System Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
© ABB Group August 23,2010 | Slide 1 MBPC Study – 1 st Load Pocket Preliminary Results for Discussion only Entergy Regional State Committee (ERSC) Southwest.
2006 SPP RTO Expansion Plan Carl A. Monroe July 30, 2006.
SPP.org 1. ESRPP 2009 Regional Studies Initial Results ESRPP Stakeholder Meeting August 12, 2009 Astor Crown Plaza New Orleans, Louisiana.
Long-Term Solution for Negative Generation Entergy Transmission AFC Stakeholder Meeting August 22, 2006.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
SPP.org 1. ICT Working Groups Current Activities Jody Holland Dowell Hudson Antoine Lucas Tim Phillips.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
ESI Alternate Economic Study Process E-RSC Meeting October 21, 2010.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
ISTEP Update Transmission Planning Summit August 11, 2009 Crown Plaza Hotel New Orleans, LA.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Generation Interconnection Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Transmission Planning in ERCOT- Overview
2016 RTP Update November, 2016 RPG Meeting.
ERCOT 2009 Five-Year Transmission Plan Update
Status Update for Reliability/Market Power Mitigation Assessment
Status Update for Reliability/Market Power Mitigation Assessment
Generation Interconnection Summary
ISO New England System R&D Needs
I-5 Corridor Reinforcement Project
Pseudo-tie business procedure
Transmission Planning in a Modern Market Environment
Westar Formula Rate and your bill
WECC Annual Meeting 9/11/2018 Cameron Warren
NERC LTRA Workshop August 16, 2007
WECC Annual Meeting 9/11/2018 Cameron Warren
Acadiana Load Pocket Project
Excelsior Energy’s Mesaba Energy Project
Pseudo-tie business procedure
Presentation transcript:

Strategic Plan and Economic Upgrade Process 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana

Strategic Plan 10-Year Study 2015 Summer Peak Develop alternate dispatch scenario to more closely reflect real-time dispatch Review historical generation patterns to determine what generation does not typically run Possibly run a minimum load case

Strategic Plan: Goals Address frequently TLR’d flowgates Remove or reduce the need for RMR generation Address frequently constraining flowgates in the AFC process Address long-standing reliability problems Webre-Wells Sheridan South Base case contingency overloads Terminal equipment limited flowgates Existing inter-area transfer limits EES-SPP (ANO-Ft. Smith) EES-SOCO EES-TVA

Strategic Plan: Goals Tie in with SPP 765kV plans Work with other RTO projects Ozark study Accommodate new generation interconnections Improve existing import limits (Amite South, DSG, WOTAB)

Strategic Plan: Specific Focus Areas Acadiana McAdams Webre-Wells DSG Amite South Arkansas 161 kV Stability Limits Mt. Olive – Hartburg Webre – Wells Franklin – McKnight

Strategic Plan: Specific Focus Areas Danville – N. Magazine Mablevale/Little Rock Import Western Region El Dorado Bogalusa ISES, Whitebluff (possible double transformer contingency)

Strategic Plan: This Year High-level Analysis Thermal & Voltage Analyses N-1-1 in Load Pockets Starting Point for Discussion

Strategic Plan: Future Stability Short Circuit More detailed analysis Production Cost

Economic Upgrades ICT will identify potential economic upgrades based on: frequent TLR’s, frequently constrained flowgates, WPP results, RMR’s, etc. Preliminary Analysis will be posted. ICT will provide an estimate of potential benefits: increased MW flow, reduction in congestion, cost savings, etc. Customers may request a study of a specific upgrade, including a Facility Study. Separate Queue NITSA/Pre-888, PTP Request, IOA/LGIA required to proceed with construction

Economic Upgrades Customers may fund upgrades at their discretion. Any new dispatch made possible by an upgrade will be reflected in models. ICT will report to regulators on Economic Upgrade activities.

Super-Regional Summits Continue to hold Entergy ICT Summit Possibility of Entergy / CLECO / SPP / LAFA / ETEC / Other Transmission Owners Summit Possibility of Entergy / SERC Region Summit

Jody Holland Manager, ICT Planning 501-614-3315 jholland@spp.org