The tyres used for the test shall:

Slides:



Advertisements
Similar presentations
DTP14 and GTR Drafting Progress Report 66th GRPE 6th June 2013 Informal document No. GRPE th GRPE, 3-7 June 2012 agenda item 3(a) Transmitted.
Advertisements

OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
PIPE CULVERT By CH. VENKATARAMAIAH.
Status of the draft GTR 65th GRPE, January 2013
Accelerated loading test in Danish Asphalt Rut Tester Erik Nielsen Danish Road Institute.
Csm51MAR2002 TYRE SAFETY Partners in Road Safety John Graham & Martin Keen ROAD SAFETY MONITORING TEAM.
UNECE Regulation No 106 Proposed amendments
Designing a Research Project. Define the Problem A creative process – –“Why are coral reefs dying?” is too large a problem to be solved in HS. – –“What.
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
Proposal for Draft Amendment to Regulation No. 117
Measures for reducing vehicle noise
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
WLTP 6th DTP Meeting Geneva DTP Subgroup LabProcICE slide 1 Parameter Setting for Validation 2 DTP Subgroup Lab Process Internal Combustion Engines.
WLTP-DTP-13 Tokyo, 21./ DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)WLTP-DTP-13.
WLTP 9th DTP Meeting Bern, DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
WLTP ANNEX 4 AND 7, DELTA CD*A BMW, Christoph Lueginger, Thomas Schütz ALTERNATIVE DETERMINATION METHODS WLTP-10-21e.
States on U.S. Postage Stamps (#1) by Don Fisher.
Revised proposal of tyre selection for WLTP Japan would like to submit our revised position, considering the discussion in DTP9. ICE lab proc 22-May-2012.
WLTP ANNEX 4, ROAD LOAD CALCULATION Proposal for calculating the road load of individual vehicles C. Lueginger, BMW; A. Feucht, Audi WLTP-DTP-LabProcICE-202.
WLTP 5th DTP Meeting Zuerich DTP Subgroup LabProcICE slide 1 Progress Report DTP Subgroup Lab Process Internal Combustion Engines (LabProcICE)
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
André Rijnders1 Dutch proposal on tyre conditioning DTP-LabProcICE November 2012 WLTP-DTP-LabProcICE-169.
Proposal Netherlands Tyre Noise Limits Original GRB Transmitted by the expert from the Netherlands Informal document GRB Add.1 (62nd GRB, 1-3.
ETADT—ADT Wide Groove Design Extra-Rubber on Shoulder
Closed Shoulder Design Special Heat Releasing Holes and Groove Applied
ETMPT1 :Multi-Purpose Tires All Steel Design
ETNT 6 layers of steel belts Specially strengthened bead chafer
ETOT(12.00)--All position, Off road
WLTP – supplemental test for correction to regional conditions
Status of the draft GTR 65th GRPE, January 2013.
Draft Dyno requirements for GTR (proposal broadly as per CFR § )
Tire condition for Coast Down
Input on wind tunnel criteria discussions
WLTP-DTP-LabProcICE-081
WLTP-DTP-LabProcICE-132
Lab Process Internal Combustion Engines
WLTP-DTP-LabProcICE-229
Draft WLTP Phase 2 – carryover from 1b – Annex 4 Starting note on split runs in coast down testing WLTP-14-18e Within phase 1b, practically all tolerances.
Idea of family CO2/FC family criteria
Handling of wind tunnel + chassis dyno method for RLD
Consideration of ‘Family’ in gtr
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
Lab Process Internal Combustion Engines
01 General requirements Road load matrix family vehicle definition 02 Annex 4 Wind tunnel for road load matrix family 03 Annex 6 CO2 interpolation range.
مديريت موثر جلسات Running a Meeting that Works
variations in tyre pressure and road surface
Vehicle warm up and stabilisation – RLD and dyno
Amendment to regulation UN 117 Introduction of worn tyre performances
WLTP-DTP-LabProcICE-209
UTAC/ICE_Lab C. Vallaude, Brussels, 14-15/11/12
Additional Pollutants Subgroup 7th DTP Meeting-13 September
Definition of Setpoint for monitoring Soak and Testroom temperature
Table of running resistances – PSA proposal
Table of running resistances – PSA proposal
Working Paper No. WLTP-05-11e
Test Mass N1 – « Payload ratio » – PSA proposal
Proposal for aerodynamic options
A.1 to 3: Statement of technical rational and justification
Mode Construction during Validation2
Thing / Person:____________________ Dates:_________________
Specifications for 4WD Chassis Dynamometer in WLTP
Comments Ref:WLTP (17/09/13)
WLTP-DTC Air Pollution Control and NIR Division
Proposal for aerodynamic options
Additional prescriptions to regulation UN 117
Area and Volume How to … Calculate the area of a square or rectangle
ETDL5S Designed for surface application ONLY.
WLTP-DTP-LabProcICE-183rev1
Comments on tyre choosing of UN Regulation No
快速移动式路面加载车MLS测试国家标准和全球应用
Presentation transcript:

The tyres used for the test shall: WLTP-DTP-LabProcICE-197 New NL proposal 21-2-2013 4.2.2.2. Tyre condition The tyres used for the test shall: not be older than 2 years after production date, not be specially conditioned or treated (e.g. heat treated), have a constant tread depth between 100 and 80 per cent of the original tread depth over the full tread width of the tyre. Grinding the tyre to a set point of 90 per cent of the original tread depth is allowed if the original shape of the tread is kept. tyres shall be run-in on road for at least 100km before road load determination