Beam Size Flip-Flop Measurements

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Electron cloud tune shift measurements for long trains Tune Shift versus current: Measured the tune shift for 45 and 115 bunch positron trains with 14ns.
E+ Tune Measurements for 4-ns Spaced Bunches Tune Measurements of 4-ns spaced bunches: An update of the strides made using the digital BPM system to measure.
Exotic approach to a Super B-FACTORY P. Raimondi.
HER vacuum study June 2006 J. Kaminski weekly MDI meeting 7/13/2006.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
S. White, LBS 17 May Van Der Meer Scans: Preliminary Observations.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
E- Cloud Machine Studies-Systematic Study of Single Bunch Tunes I. Pinger timing effect on single bunch tunes II. Vertical/horizontal pinger high voltage.
Recent electron cloud studies at CESR David Rice Cornell University Laboratory for Elementary-Particle Physics.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Magnet Motion Produces Luminosity Loss. NLC Feedback Operation Kicker Gain Bunch Charge Measure deflected bunches with BPM and kick other beam to eliminate.
SuperB with Two Interaction Regions Is it possible to obtain luminosity per each IP? P.Raimondi, D.N.Shatilov, A.Variola,M.Zobov.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
BPM and BSM Tune Measurements August 2, 2007 B. Cerio, R. Holtzapple.
CESR as Light Source David Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
RHIC Operation Status Yun Luo, ( 2012 June 19, Time Meeting )
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Effect of high synchrotron tune on Beam- Beam interaction: simulation and experiment A.Temnykh for CESR operating group Cornell University, Ithaca, NY.
J. Alexander + Cornell accelerator group Cornell University
MD #453 Effect of low frequency noise
e- Cloud Machine Studies-Tune Shift Studies
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Luminosity Optimization for FCC-ee: recent results
Monday fill with 1092 bunches (6 h stable beams)
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Recent Electron Cloud Studies at CESR and Future Plans
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
e-/e+ Vertical beam size with 6 Wigglers Low and Off
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Beam-beam Experience at PEP-II
The Effect of Poisson Data Weighting on Streak Camera Diagnostics
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Tuesday 9th November 10:02 Fill beams dumped
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
DSP Main Loop (Concept)
LHC Morning Meeting - G. Arduini
CesrTA Experimental Schedule and Priorities
Summary Thursday h21: Stable beams fill #1303.
e+ Vertical Beam Size during CESR-c Collisions
e+/e- Vertical Beam Size during CESR-c Collisions
News on TMCI in the SPS: Injecting high intensity bunches
LHC Morning Meeting - G. Arduini
Beam spot size measurements
e- tunes-witness bunch 42
CESR Beam Instrumentation DAQ
e+ Vertical Beam Size during CESR-c Collisions
G. Codner, E. Tanke, M. Palmer Cornell University
Saturday Nov Stop proton operation. Switch back to ions
e- Cloud Studies-Tune Studies with 45 Bunch Trains
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Thursday – Morning Energy matching at injection with H CODs
Orbit Bumps in PEP-II to Maximize Luminosity
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Luminosity performance comparison: 5-6 Jun vs. 23 Dec 03
e+/e- Vertical Beam Size during CESR-c Collisions
Preliminary Analysis of April 24, 2006 CESR Bunch Measurements
Low Energy Electron-Ion Collision
e+ tunes-witness bunch 42
M. Forster, G. Codner, R. Holtzapple, J. Kern, and E.Tanke
Injection design of CEPC
Thursday 20th July - morning
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Saturday 26 November 2011.
Tuesday
Presentation transcript:

Beam Size Flip-Flop Measurements R. Holtzapple, M. Billing, B. Cerio In CESR-c conditions with 26 bunches in the CESR, single bunch tune, vertical beam size and luminosity were measured parasitically. The BSM was used to measure the vertical beam size of e+ and e-. Tune was measured with the BPM while pinging vertically. Luminosity was measured with the FLM. These quantities were measured in a stable colliding beam state and in an induced “flip-flopped” state where the vertical beam size changed and luminosity was reduced. 9-06-07

Preliminary Flip Flop Measurement (tunes not measured) Stable Colliding Beams Flip-Flopped State FLIP FLOP

Flip Flop BSM Measurement: end of fill Flip-Flopped State Stable Colliding Beams Pretzing-13 from 7 to 64cu Xtuning 4 from 48 to 5cu Flip-Flopped State

Change in Beam Size: end of fill

Change in Tune: end of fill, pretzing

Change in Tune: end of fill, xtuning

Change in Luminosity: end of fill pretzing xtuning

Flip Flop Measurement: top of fill Stable Colliding Beams Flip-Flopped State FLIP FLOP

Change in Tune: top of fill

Change in Luminosity: top of fill