Data-on-demand use-cases

Slides:



Advertisements
Similar presentations
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Advertisements

Jeffrey Hill.  LANSCE Requirements – a Review  EPICS Paradigm Shift – a Review  Status – What is Implemented  What is an Abstract Data Type?  Benefits.
Model Server for Physics Applications Paul Chu SLAC National Accelerator Laboratory October 15, 2010.
1 Imaging Upgrade Presenter: Kim Rinn Date: June 30, 2009.
SECTION 1: INTRODUCTION TO SIMICS Scott Beamer CS152 - Spring 2009.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Agenda Adaptation of existing open-source control systems from compact accelerators to large scale facilities.
Elder Matias Canadian Light Source University of Saskatchewan CLS – Control System Overview.
EPICS Archiving Appliance Test at ESS
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI EPICS Meeting, Saclay Paul Scherrer Institut SwissFEL Timing System Babak Kalantari.
REDNET Prototype overview Rok Stefanic the best people make cosylab.
The CSS Scan System Kay-Uwe Kasemir SNS/ORNL Dec
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
ORNL is managed by UT-Battelle for the US Department of Energy EPICS Automation Kay Kasemir, SNS/ORNL June 2014.
MASAR Server & Application Guobao Shen Photon Sciences Department Brookhaven National Laboratory Collaboration Working Group Oct 02, 2013.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Integrating EPICS and LabVIEW on Windows using DCOM Freddie Akeroyd ISIS Computing Group.
EPICS Collaboration Meeting Fall PAL October 22 ~ 26, 2012 LCLS Timing System (pattern design, evGUI, and high level) Mike Zelazny for LCLS Timing.
NCSX CD-4/MIE block diagrams April 18, 2007 P. Sichta rev 0.
Multi-OTR Status A.Faus-Golfe, J.Alabau, C.Blanch, J.V.Civera, J.J.García Garrigós IFIC (CSIC-UV) D.McCormick, G.White, J. Cruz SLAC aand KEK team.
Display Page (HTML/CSS)
Wir schaffen Wissen – heute für morgen Babak Kalantari, PSI MRF workshop, Prague, Eli Beamlines Paul Scherrer Institut Synchronous DAQ using.
E. Matias Canadian Light Source CLS Beamline Controls.
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
Debbie Rogind Diane Fairley SLC-Aware BSAC Facility Requirements Review May 26, 2005 SLC Aware IOC BSAC* Facility Requirements Review *Beam Synchronous.
Tips and Tricks for Debugging ASP.NET Web Applications and Services Habib Heydarian TLNL05 Program Manager Microsoft Corporation.
ICS Software Development Environment Blaž Zupanc and Leandro Fernandez 10 March 2016.
ESS Integrated Control System Software Core Components S.Gysin
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
Failure Analysis Tools at DESY. M. Bieler, T. Lensch, M. Werner, DESY ARW 2013, Melbourne,
Stephanie Allison LCLS IOC Meeting Jul 18, 2008, Jan 21, 2011 Beam Synchronous Acquisition for IOC Engineers Definition/Requirements.
ICS interfaces Timo Korhonen ICS Apr 22, 2015.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Software Scope Susanne Regnell Group Leader Control System Software
Charge Measurements on VELA
Use of a Diamond BLM System in the LHC Ring
Main Timing System Overview
LHC Beam Commissioning Meeting V. Kain & R. Alemany
2007 IEEE Nuclear Science Symposium (NSS)
Presented by Li Gang Accelerator Control Group
Jason Bury Dylan Drake Rush Corey Watt
Laboratorio per dottorandi 2017 Particle Accelerators Control System
Beam-Synchronous Data Acquisition (BS-DAQ)
LCLS Timing Software and Plan
GFA Controls IT Alain Bertrand
Magnet Safety System for NA61/Shine
Open Tasks for PrimEx-II Run
Section 1: Introduction to Simics
LCLS Event System - Software
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Status and experience of Liberas at Soleil
IBEX Client Migration to Eclipse 4
A Virtual Implementation of VELA (CLARA)
Plan for controls with the digital platform
ICS update 7th Experiment Control Workshop
Job Application Monitoring (JAM)
PLCs integration into the ICS
LHC BLM Software audit June 2008.
NICOS – IBEX Interactions
European Spallation Source Archiving Service
Beam Synchronous Acquisition on IOC
Control Systems for the APTM and GRID
Local Protection of Insertable Devices
Clement Derrez European Spallation Source ERIC Date
 Is a machine that is able to take information (input), do some work on (process), and to make new information (output) COMPUTER.
Breakout Session: Controls
Configuration of BLETC Module System Parameters Validation
Kaj Rosengren FPGA Designer – Beam Diagnostics
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Data-on-demand use-cases Kaj Rosengren FPGA Designer – Beam Diagnostics www.europeanspallationsource.se 17 May, 2019

Use-case – user trigger Notes: Skipped the Machine protect system component

Use-case – periodical scan

Use-case – Instrument trigger

Use case – post-mortem trigger

Use-case notes User trigger could also be run as a ”one time” periodical trigger if more accuracy of dumping is needed. Triggers can be hardwired via the back-plane. So the event doesn’t have to be decoded by SW.

Prototype needs – DoD data parts The needs of the prototype is basically to be able to trigger data through EPICS and retrieve the data. The IOC client in this case could be CS studio, matlab script or python script. Note: Periodic data requires triggers (BEAM_ON, RF_ON ..), EVR in the crate.