Elettra – Sincrotrone Trieste S.C.p.A.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Ulrich RaichAnnual Report Preparation Meeting GSI January 2006 Progress report for Task SIS100_5 Digital Signal-Analysis Electronics for Beam Position.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
Status of the 1.2 MW MB-IOT for ESS Morten Jensen CLIC Workshop 2016, January, CERN.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
ESS Spoke Linac section RF Anders Sunesson, RF group leader Rutambhara Yogi ESS Carlos Martins ESS Roger Ruber FREIA.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
IIFC Meeting February 24-25, 2015, RRCAT P. R. Hannurkar, Akhilesh Jain, M. R. Lad RF Systems Division 650 MHz RF Power 1.
O. Kester, NuSTAR annual meeting, 27/02/2013
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
ELENA installation progress F. Butin / ELENA collaboration.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
WP High Beta Cavities Delivery
Phase Feed-Forward Piotr Skowroński (CERN)
RF cell Anders Sunesson RF group leader
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Beam diagnostics from GSI
Uppsala Commitment to ESS and FREIA Planning
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Hosting Orsay Walid KAABI
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
Status of the Front End Test Stand April 2007.
352MHz Klystron Control for the 3MeV Linac test stand
TIARA WP8 Status M. Biagini, INFN-LNF, for WP8 TIARA Mid-Term Meeting
Mauro Morandin & Antoine Daël
X-band Facilities and High Gradient Tests Stands Around the World
Injector Performance Requirements Conventional Facilities Update
LLRF and Beam-based Longitudinal Feedback Readiness
CEPC RF Power Sources System
Olivier Napoly, coordinator CEA/Irfu
Advanced Research Electron Accelerator Laboratory
RF systems introduction
CDR2&3 Communication Scheme
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
Elettra Sincrotrone Trieste
ESS Bilbao RF Systems Overview Pedro J. González
Ciprian Plostinar Workshop on Testing and Commissioning
Daresbury ESS In-Kind Contributions
Krzysztof Czuba ESS LLRF Quarterly Meeting
Introduction CDR Normal Conducting Linac LLRF
European Spallation Source ERIC
Status of the ESS High Power RF Systems
Accelerator Installation Schedule
Overview of the TARGET Monolith Rough Vacuum
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Elettra – Sincrotrone Trieste S.C.p.A. REPORT FROM ELETTRA SINCROTRONE TRIESTE ESS ACCELERATOR COLLABORATION BOARD MEETING Daresbury, February 1,2017 Alessandro Fabris Elettra – Sincrotrone Trieste S.C.p.A.

OVERVIEW Elettra in-kind contributions for the accelerator: AIK2.1 Magnets for ESS linac AIK7.4 Beam Diagnostics- Wire Acquisition System for the ESS linac AIK8.5 Spoke RF Power Station AIK17.2 Power Converters for Magnets to the ESS linac tbd Installations AIK2.1, AIK7.4, AIK8.5, AIK17.2 endorsed at IKRC 10 in October 2016.

REVIEWS Reviews in 2016 April12-13 PDR Spoke cavity RF power stations May 4 CDR Q5, Q6, Q7 magnets C5, C6 magnets May 17 C5, C6 power converters May 18 PDR-1 Q5, Q6, Q7 power converters June 28 Diagnostics - SEM system Dec. 12 Diagnostics - Scintillator system Next reviews in 2017: PDR-2 Q5, Q6,Q7 power converters CDR D1, Q8, C8 magnets PDR D1, Q8, C8 magnets power converters CDR wire scanners Remaining CDRs to be done with manufacturers

SPOKE CAVITIES RF POWER STATIONS Scope: build twenty-six pulsed 400 kW@352 MHz RF power stations for the spoke cavities C. Pasotti Based on combination of two 200 kW tetrodes. Each RFPS unit consists of: Two equivalent transmitters with amplification chain composed by solid state preamplifier and tetrode amplifier. One Modulator to supply both tetrodes. Construction will be outsourced to industry under Elettra supervision.

SPOKE CAVITIES RF POWER STATIONS Baseline: tetrode TH 595 with input circuit TH 18595A. Designed for 200 kW pulsed operation at the ESS RF pulse requirements. In operation at FREIA test stand. Technical challenges RoE with the chosen tetrode in other facilities, as FREIA, should allow to mitigate risk in the design. AC line flicker and harmonic content due to the pulse operation should be taken into account in the modulator design. First RFPS unit will be extensively tested to fully evaluate compliance to requirements and implement modifications if necessary. C. Pasotti OUTLOOK Working with ESS RF group to optimise and freeze technical specifications in terms of performance, costs and schedule. Writing technical specifications for tender. Final version of document by end February 2017.

MAGNETS Scope: design and build magnets installed in different parts of the ESS linac Activities concentrated on LWU magnets (Q5, Q6, Q7 and C5, C6). Design for quadrupoles updated following switch to dc magnets D. Castronovo Q6 Q7 C5 C6 Q5

MAGNETS LWU quadrupole magnet prototype under construction at CERN Courtesy of D. Lopez, CERN OUTLOOK Prototype of quadrupole magnets to be tested at CERN by mid February. LWU magnets technical documentation update reviewed. LWU magnets technical specifications for tender available.

POWER CONVERTERS Scope: design and build power converters for the magnets of the ESS linac Bipolars Type Description Operating mode Q.ty PCC5 Power converters for the “C5” dual- plane correctors 4Q, air cooled 26 PCC6 Power converters for the “C6” dual- plane correctors 110 PCC8 Power converter for the “C8” dual- plane correctors 8 R. Visintini STATUS Correctors power converters based on compact Elettra design approved in CDR. Finalization of design for industrial production (Built-to-Print Call for Tender) in progress, according to ESS requirements. 9

POWER CONVERTERS Type Description Operating mode Q.ty Note PCQ5 Power converters for the “Q5” quadrupoles DC, water cooled 26 Magnet defined PCQ6 Power converters for the “Q6” quadrupoles 95 PCQ7 Power converters for the “Q7” quadrupoles 12 PCD1 Power converters for the “D1” dipoles 1 Magnet not yet defined PCQ8 Power converters for the “Q8” quadrupoles 6 PCC8 Power converter for the “C8” dual-plane correctors 4Q, air cooled 8 Magnet not yet defined, design will be compatible with other corrector PC R. Visintini STATUS In June 2016 ESS decided to pass from “Pulsed” to “DC” (PCQ5, PCQ6, PCQ7). Completed the re-definition of PS following the changes in the Q5, Q6, Q7 magnets. Preliminary recognition of potentially available PC on market. Technical documentation for Call for Tender (subject to PDR-2) almost ready. PDR-2 for DC quadrupoles power converters expected soon.

Scope: Wire scanner (WS) acquisition system design BEAM DIAGNOSTICS Scope: Wire scanner (WS) acquisition system design Analog Front End Prototype Design and Fabrication Conditions: 50uSec Pulse; 0.5uA GAIN =HI; Cable = 1m RG174 M Ferianis, R. De Monte, S. Cleva, S. Grulja Optical Front End Prototype Design and Fabrication

BEAM DIAGNOSTICS OUTLOOK WS acquisition system simulator M Ferianis, R. De Monte, S. Cleva, S. Grulja OUTLOOK After the preliminary design phase, detailed design is in progress Testing of the prototype, before CDR, will be carried out in two main steps: in house at E-ST and at a partner lab to have access at signals from wires.

SUMMARY TA endorsed by IKRC (“Cover Pages”). Working to complete remaining PDRs and CDRs, freeze technical specification and have technical documentation ready for when big procurement can start. Working to clear administrative/legal aspects that prevent signing of IKAs and Schedules. These actions involve as well INFN (Representing Entity for Italy in European Spallation Source ERIC) and ESS and the resolution is a prerequisite for the start of tendering phase.