KAGRA ISC Electrical Components Layout

Slides:



Advertisements
Similar presentations
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo April 17, 2015.
Advertisements

KAGRA Vacuum System VAC (YS) 1 1. Layout (interferometer and survey map) **tilting the optical plane of interferometer for draining water. **horizontal.
Jan 29, 2007 LIGO Excomm, G R 1 DC READOUT INSTALLATION RF PICKOFF OMC ELECTRONICS Squeezer Pickoff PD MMT1 Tip/Tilt MMT2.
Electronics and Cables around IMC Common Mode Servo Board Yuta Michimura Ando Group Department of Physics, University of Tokyo August 10, 2015.
G D Tasks After S3 Commissioning Meeting, Oct 6., 2003 Peter Fritschel, Daniel Sigg.
Takanori Sekiguchi ALPS Report, Dec. 26th, 2013 Prototype Test of Type-B 1 Takanori Sekiguchi KAGRA F2F MEETING Feb
Summary of Suspension Configurations Yuta Michimura Department of Physics, University of Tokyo March 18, 2015.
KAGRA Roadmap and Progress Evaluation Assessment S.Miyoki  M.Ando 2012/7/30.
Optical Levers Layout and Cabling Yuta Michimura, Yuya Kuwahara Ando Group Department of Physics, University of Tokyo November 19, 2015.
Intensity Stabilization Servo Plan Yuta Michimura Department of Physics, University of Tokyo November 23, 2015.
New iKAGRA Configuration Yuta Michimura Department of Physics, University of Tokyo 11th KAGRA F2F (University of Tokyo) Feb 6, 2015.
KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo December 8, 2015.
G D LIGO Commissioning Update LSC Meeting, Nov. 11, 2003 Daniel Sigg.
Cabling Policy for KAGRA ISC Yuta Michimura Ando Group Department of Physics, University of Tokyo March 14, 2016.
Summary of iKAGRA Test Run Mar 25-31, 2016 Yuta Michimura Department of Physics, University of Tokyo April 12, 2016JGW-T
IKAGRA 初期アラインメント手順 Initial Alignment Procedure for iKAGRA Yuta Michimura Department of Physics, University of Tokyo July 5, 2016JGW-T
Main Interferometer Subsystem
Arm Length Stabilization Conceptual Configuration Yuta Michimura Department of Physics, University of Tokyo JGW-T November 14, 2016.
bKAGRA PSL Design Study
Main Interferometer Subsystem
Daniel Sigg, Commissioning Meeting, 11/11/16
Main Interferometer Subsystem
Demonstration of lock acquisition and optical response on
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Apr 11-25, 2016
KAGRA用防振装置の開発 VIII Configuration Sensors and Actuators
Yuta Michimura Department of Physics, University of Tokyo
Electronics and Cables around IMC Common Mode Servo Board
Commissioning Progress and Plans
KAGRA Control Room Appearance (tentative)
Commissioning Update PAC 15, Dec. 11, 2003 Daniel Sigg.
The Advanced LIGO Angular Control System (ASC) (Hanford edition)
Interferometer Design for bKAGRA Phase 1 and Beyond
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Arm Length Stabilization Conceptual Configuration
Arm Length Stabilization Conceptual Configuration
Cartoon of the optical layout around IMC, IFI and IMM
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1 and Beyond
Summary of iKAGRA Test Run Mar 25-31, 2016
Summary of iKAGRA Test Run Mar 25-31, 2016
Interferometer Design for bKAGRA Phase 1 and Beyond
Interferometer Design for bKAGRA Phase 1 and Beyond
bKAGRA PSL EOM Layout ~180W ? to IMC Laser EOM (fPMC, PM) PMC EOM
Interferometer Design for bKAGRA Phase 1 and Beyond
Commissioning Procedure for bKAGRA Phase 1 ( )
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Commissioning Procedure for bKAGRA Phase 1 ( )
Summary of the iKAGRA Run
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1
Commissioning Procedure for bKAGRA Phase 1 ( )
Progress report from 40m team for the Advanced LIGO
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Yuta Michimura Department of Physics, University of Tokyo
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Status of KAGRA Yuta Michimura on behalf of the KAGRA Collaboration
Commissioning Procedure for bKAGRA Phase 1
Interferometer Design for bKAGRA Phase 1 and Beyond
Beam Propagation for bKAGRA Phase 1 with flat ETMs
iKAGRA初期アラインメント手順 Initial Alignment Procedure for iKAGRA
Summary of iKAGRA Test Run Mar 25-31, 2016
Intensity Stabilization Servo Plan
RF and DC Cabling Policy for KAGRA ISC
Interferometer Design for bKAGRA Phase 1
Intensity Stabilization Servo Plan
Arm Length Stabilization Conceptual Configuration
Yuta Michimura Department of Physics, University of Tokyo
KAGRA ISC Electrical Components Layout
Presentation transcript:

KAGRA ISC Electrical Components Layout May 17, 2019 KAGRA ISC Electrical Components Layout Yuta Michimura Ando Group Department of Physics, University of Tokyo

Scope and Disclaimer Draw rough layout of electrical components (RF distribution, PD/QPDs, servo boards) for KAGRA ISC Cameras and picomotors are not included Components for ISS, ALS, and OMC are very uncertain “AS rack” is currently not on the rack list Underlined ones are used also for iKAGRA References: - JGW-D1402908 (IMC servo topology) - JGW-D1402984 (Cabling around PSL+IMC) - JGW-D1100425 (electronics racks layout) - JGW-D1402831 (what’s inside electronics racks) - JGW-T1402982 (list of ISC detection ports) - Wiki/OutputTables (list of output tables)

KAGRA Layout EYT TRY table EYC chamber EYA IMC TRANS MCE IYA IYC PSL rack MCE IYA IYC PCY1 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 PR2 BS SR2 SR3 POX AS? OMM AS Server room

List of EOMs, PDs, QPDs Underline: also for iKAGRA [ ]: may be omitted EOM (fPMC) EOM (fIMC, f2) EOM (f1, f3) PMCR (fPMC, DC) PMCT (DC) REFCAVR (fIMC, DC) REFCAVT (DC) IP A (DC) IP B (DC) EYT TRYVAC A (DC) TRYVAC B (DC) TRYVAC GR A (DC) TRYVAC GR B (DC) TRY IMCT (DC) [IMCT A (DC)] [IMCT B (DC)] TRY (DC) TRY GR (DC) [TRY A (DC)] [TRY B (DC)] [TRY GR A (DC)] [TRY GR B (DC)] EY2 EYC EY3 POPVAC (f1, f2, DC) POPVAC A (f1, f2, DC) POPVAC B (f1, f2, DC) EY4 IMCTVAC A (DC) IMCTVAC B (DC) EYA IMC TRANS TRX (DC) TRX GR (DC) [TRX A (DC)] [TRX B (DC)] [TRX GR A (DC)] [TRX GR B (DC)] REFLVAC (f1, f2, DC) REFLVAC A (f1, f2, DC) REFLVAC B (f1, f2, DC) IMMT2TVAC (DC) IMMT2TVAC A (DC) IMMT2TVAC B (DC) MCE IMMT2T (f1, f2, DC) [IMMT2T A (DC)] [IMMT2T B (DC)] IYA TRXVAC A (DC) TRXVAC B (DC) TRXVAC GR A (DC) TRXVAC GR B (DC) IYC PCY1 IMMT1TVAC (DC) PSL IY1 IMMT2T [POYVAC (f1, f2, DC)] TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 EOM (fALSY) SPOS (2*f1, 2*f2, DC) POS GR (fALSY, DC) PLLY (BB, DC) PR2 BS SR2 [IMMT1T (DC)] IMCR (fIMC, DC) IMCR A (fIMC, DC) IMCR B (fIMC, DC) SR3 POY (f1, f2, DC) POX POX (f1, f2, DC) [POXVAC (f1, f2, DC)] EOM (fALSX) POP (f1, f2, DC) SPOP (2*f1, 2*f2, DC) POP GR (fALSX, DC) PLLX (BB, DC) [POP A (f1, f2, DC)] [POP B (f1, f2, DC)] ASVAC (f1, DC) OMCTVAC (DC) ASVAC A (f1, DC) ASVAC B (f1, DC) OMCTVAC A (DC) OMCTVAC B (DC) AS? AS (f1, DC) OMCT (DC) AS A (f1, DC) AS B (f1, DC) [OMCT A (DC)] [OMCT B (DC)] REFL (f1, f2, DC) REFL NRSB (f3-f1, f2-f1, DC) REFL A (f1, f2, DC) REFL B (f1, f2, DC) OMM AS Server room

Where Do Signals Go EYT TRY EYC DC DC EYA IMC TRANS MCE IYA fIMC, DC f1, f2, DC IYC PCY1 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 DC DC PR2 BS SR2 f1, f2, DC f1, f2, 2*f1, 2*f2, fALSX, BB, DC fIMC, DC SR3 2*f1, 2*f2, fALSY, BB, DC f1, f2, f3-f1, f3-f2, DC POX fPMC, DC AS? OMM AS f1, f2, DC f1, DC Server room

RF Generation and Distribution EYT TRY EY2 EYC EY3 EY4 EYA IMC TRANS MCE IYA fPMC IYC PCY1 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 PR2 BS SR2 fIMC f1 → 2*f1 f2 → 2*f2 f3 → f3-f1 → f3-f2 fALSX fALSY SR3 POX AS? OMM AS Server room

List of Servo Boards EYT TRY EYC EYA IMC TRANS MCE IYA IYC PSL IMMT2T PCY1 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 PR2 BS SR2 Common Mode Servo (for IMC) ISS SR3 Common Mode Servo (for CARM) Common Mode Servo (for ALSX) Common Mode Servo (for ALSY) Phase Frequency Discriminator (for ALSX) Phase Frequency Discriminator (for ALSY) PLL Servo ? (for ALSX) PLL Servo ? (for ALSY) POX TTFSS PMC Servo OMC Servo ? AS? OMM AS Server room

List of PZTs PZTs in-air PZTs in-vac EYT TRY EYC EYA IMC TRANS MCE IYA IYC PCY1 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 PR2 BS SR2 SR3 POX Laser PMC Periscope x4 AS? OMM AS OMC Server room

List of Picomotors picomotors in-air picomotors in-vac EYT TRY steering to TRY x4 TRYVAC QPD x4 TRYVAC GR QPD x4 [TRY QPD x4] [TRY GR QPD x4] EY2 EYC [IMCT QPD x4] EY3 steering to POP x4 POPVAC QPD x4 EY4 steering to IMC x4 IP QPD x4 MCe sus x2 IMCTVAC QPD x4 EYA IMC TRANS MCE steering to IFI x4 IMMT2TVAC PD x2 IMMT2TVAC QPD x4 IYA [TRX QPD x4] [TRX GR QPD x4] [IMMT2T QPD x4] MCi sus x2 MCe sus x2 IYC PCY1 steering to TRX x4 TRYVAC QPD x4 TRYVAC GR QPD x4 IMMT2TVAC PD x2 PSL IY1 IMMT2T TRX MC IX1 PCX1 MCF PRM PR2 IFI IMM PR3 BS IXC EXC IXA EXA EXT IO IMMT1T IMC REFL REFL MMT PRM POY LSC ASC1 ASC2 AUX POP SR2 POS EX2 EX3 EX4 steering Ygreen x4 PR2 BS SR2 IMCR QPD x4 SR3 POX steering Xgreen x4 [POP QPD x4] AS? REFL QPD x4 OMM AS AS QPD x4 [OMCT QPD x4] steering to AS x4 ASVAC QPD x4 OMCTVAC QPD x4 Server room