UNC Modification 0634 (Urgent) – Post Implementation Assessment

Slides:



Advertisements
Similar presentations
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
Advertisements

Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
ScottishPower, Energy Retail Gas Long Term Vacant (LTV) Proposal January 2010 Elaine Carr ScottishPower.
AQ Amendment: Relevant UNC obligations and additional Validations Applied 27 May 2010.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
11 User Pays User Committee 11th January Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime UK Link Implementation Summary & Overview of Solution Options 9 th.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
DM Elective Transfer Scenarios 29 January Principles  Incoming Shipper or Read Provider responsible for obtaining read at Start of GFD – i.e.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
IGT and Shipper Workgroup meeting 28 th February 2011.
SoS Report PAC – 13th December 2016.
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
Distribution Workgroup 24/11/16
xrn4361 UK Link Future Release 2
Performance Assurance Framework Risk Register Consultation Summary
Rebecca Knight Mod 644 UIG Analysis.
Background - Tolerance Rules
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
DM Elective Transfer Scenarios 26 February 2009
UNC Modification – Non Effective Days
CSEPs Reconciliation Proposals
Consideration of issues raised by UNC Modification Proposal 0244
Impacts of Project Nexus Implementation Date to AQ17
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Release 2 Scope Business Benefit Review
UIG Task Force Progress Report
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
UIG Task Force Progress Report
Consideration of issues raised by UNC Modification Proposal 0244
UK Link Replacement Programme additional supporting UNC modifications
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Mod 473A Proposal raised as an Alternate following engagement with the Joint Office 437A seeks to introduce an alternative solution, addressing the same.
Deferral of Retrospective Updates Functionality
UIG Task Force Progress Report
Nexus Workgroup Mod 0473 Presentation
Project Nexus Workgroup
Modification 421 – Updates and Benefits Case
Implementation Approach Distribution Workgroup – June 2014
UIG Task Force Progress Report
Modification Proposal 136
Mod 209 – Rolling AQ.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
UIG Task Force Progress Report
Customer Issue Management CoMC Update
UIG Task Force Progress Report
UIG Task Force Progress Report
UIG Task Force Progress Report
Further Considerations
Enabling Large Scale Utilisation of Class 3
Enabling Large Scale Utilisation of Class 3
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

UNC Modification 0634 (Urgent) – Post Implementation Assessment Distribution WG - 25th January 2018

UNC Modification 0634 Mod 0634 (Urgent) - Revised estimation process for DM sites with D-7 zero consumption Proposed due to large number of DM Supply Meter Points that were not recording Actual consumptions post Nexus Implementation. DM estimates were being used to close out allocations, adding to volatility Urgent modification raised to: Override existing estimation routines in the event that an actual reading is not obtained on DM Supply Meter Points Where estimate derived was ZERO based upon the D-7 Reading

UNC Modification 0634 – CDSP Activities Urgent modification raised to amend: Pre-0634 estimate routine used (in priority order) Consumption derived from D-7 AQ/365 Consumption 0634 required assessment by the CDSP where the Estimated Consumption was derived using D-7 reading AND this derived ZERO Assess whether an Actual consumption was available, and if so utilise this consumption Assess whether a better estimation routine would be to derive consumption based on AQ/365 Retain zero consumption

UNC Modification 0634 – Shipper Activities Shipper to assess CDSP proposed consumption Shipper could instruct CDSP to: Amend consumption and use: AQ / 365 ZERO value Alternative Consumption Do nothing – i.e. CDSP proposed consumption would be retained

UNC Modification 0634 – Implementation Revised consumption required by GFD+5 in order to amend allocations 0634 required CDSP insertion of revised consumption prior to notification to Shipper Xoserve contact DMSP to ascertain whether: DMSP had obtained an Actual Consumption Whether the DMSP were planning to intervene with Alternative Consumption Amended process to seek approval from Shipper User prior to inserting the revised consumption – to reduce the risk of missing the D+5 deadline due to ‘double entry’

UNC Modification 0634 – Implementation This is represented by the following process diagrams: Explicit 0634 process: Implemented 0634 process:

UNC Modification 0634 – Statistics Pot 1 – DM Supply Meter Points that at 0634 implementation had not recorded an actual reading since Project Nexus Implementation Date Pot 2 – DM Supply Meter Points which had recorded actual readings but have stopped recording actuals / new DM Supply Meter Points Statistics presented show c 1 month following implementation, and c 2 months following implementation

UNC Modification 0634 – Pot 1 Statistics Pot 1 – DM Supply Meter Points that at 0634 implementation had not recorded an actual reading since Project Nexus Implementation Date

UNC Modification 0634 – Pot 1 Interesting Points to note: 91 potential interventions – 78 of which were retained as 0 following CDSP assessment, 64 of which in Month 1 1 actual consumption obtained from DMSP and inserted by CDSP in Month 1 – 960 GWh amended in allocation 0 actual consumptions inserted in Month 2 6 consumptions amended by DMSP in Month 1 & 2 – 1, 580 GWh

UNC Modification 0634 – Pot 2 Statistics Pot 2 – DM Supply Meter Points which had recorded actual readings but have stopped recording actuals / new DM Supply Meter Points

UNC Modification 0634 – Pot 2 Interesting Points to note: 138 potential interventions – 87 of which were retained as 0, 72 of which in Month 1 12 actual consumption obtained from DMSP and inserted by CDSP in Month 1 and 2 – 1,612 GWh amended in allocation 11 consumptions amended by DMSP in Month 1 & 2 – 950 GWh

CDSP engagement beyond transitional issue? For Transitional Issue (Pot 1) Supply Meter Points Benefits seen within Month 1 following implementation, no further amendments undertaken by CDSP For Pot 2 Supply Meter Points Some intervention undertaken by CDSP – 12 instances where DMSP provided Consumption inserted by CDSP, 7 instances where instruction to insert AQ/365 provided – majority in Month 1 (10, 5 respectively) Intervention by DMSP in 17 instances to amend estimated zero consumption across Pot 1 and 2