PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
Never place yourself in line of fire
Ensure all safety covers and guards are secured and in place
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Follow Management of Change for an activity which is not in permit
Always Drive to road conditions
Over Head Lines (OHL) and kicker boards #02
PDO Second Alert What happened? Your learning from this incident..
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
PDO Second Alert What happened? Your learning from this incident..
Never put your Hands in line of fire
Always stay out of the line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Adequate tethered tools
Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Unsecured pup joint falling
PDO Second Alert Date: Incident title: HiPo MVI
Crane operating with boom lowered and under Supervision
Slow down before the bend
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
Always ensure your journey is authorised
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Always keep your equipment maintained
PDO Second Alert What happened? Your learning from this incident..
Check Level Setup prior Lifting & Lowering Operation
Always use fit for purpose lifting accessories
Always adhere to Red/No Go zones
Do not drive underneath overhead lines without permission.
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Vehicles to Keep Safe Distance at all times
Always position the crane boom correctly before slinging the casing
Keep away from the line of fire
Beware of raised edges of walk ways.
Presentation transcript:

PLAN AND DOCUMENT CHANGES TO THE OPERATION PDO Second Alert Date: 24/25.03.2017 Incident title: Near Miss / Unsafe Act What happened? During a recent Rig Move, several Kicker board lines were lifted by Crane, telehandler (man riding basket) and person climbing on monkey board to lift Kicker board line clear of the Rig Mast. Empowerment to Stop the Work was invoked. Your learning from this incident.. Follow through empowerment to stop Follow written procedures Comply with the Route Survey Consult Electrical department when lines are too low Notify Electrical department when lines are too low Route Survey Obstructions, Pipelines, OHL, KB, Sharp junctions, Gradients etc PLAN AND DOCUMENT CHANGES TO THE OPERATION

Management self audit Date: 24/25.03.2017 Incident title: Near Miss / Unsafe Act As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure the DSV or Tool Pusher are present during Route Surveys? Do you ensure all OHL’s are measured and recorded on the Route Survey? Do you ensure the height of the rig is confirmed during the Pre Rig Move Meetings? Do you ensure all personnel are aware of the Empowerment to Stop the Work? Do you utilise the Management of Change (MOC) process for changes to the operation? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.