Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson
Christine E. Lynn Rehabilitation Hospital for the Miami Project to Cure Paralysis at UHealth/Jackson $177 million total budget Specialty trade contractors assisting design Enabling first phase under construction Demolition of Institute/Annex in 1st Quarter 2018 Foundations beginning 2nd Quarter 2018
New Rehab Hospital Turner Construction Design Consultant HDR Architecture SBE-A/E Goal 18.00% Construction Manager Turner Construction Company SBE-C Protégé Foster Construction of South FL GMP $121,305,314 SBE-C Goal 34.05% SBE-G/S Goal 0.25% SBE-C Protégé Goal 6.31% David Clark
New Rehab Hospital Turner Construction PROJECT UPDATE Temporary Corridor construction ongoing Demolition of Institute and Annex is ongoing Oil Switch replacement (electrical scope) is in process Design Development documents are complete Complete permit documents scheduled for late 1st Quarter, 2018 GMP documents for structure and dry-in components to be issued on January 22, 2018 David Clark
New Rehab Hospital Turner Construction CONSTRUCTION PACKAGES – SCHEDULED BID TIMEFRAME, JANUARY, 22 – FEBRUARY 13 (SCHEDULED BID DUE DATE) Package Description Augercast Piles Roofing & Accessories (SBE-C Set-Aside) Exterior Framing, Sheathing, and Stucco Masonry (SBE-C Set-Aside) Sitework and Civil (partial) Waterproofing & Sealants Dewatering Cast-in-Place Concrete Spray-Applied Fireproofing
Jackson Health – Christine E. Lynn Rehabilitation Center Milestone Schedule Activity Date Enabling and Institute and Annex Demolition complete April, 2018 Start test piles May, 2018 Top out steel December, 2018 Building Enclosed June, 2019 Substantial Completion Quarter 1, 2020 Demolition of Existing Rehab Quarter 2, 2020 DC
HOW TO DO BUSINESS WITH TURNER CONSTRUCTION COMPANY? KEY QUESTION: HOW TO DO BUSINESS WITH TURNER CONSTRUCTION COMPANY? Four Steps in Doing Business with Turner Complete pre-qualification application Respond to Invitations to Bid Submit proposal timely Follow up
Turner On-Line Prequalification The first step in our prequalification process is to have you access our website at http://www.turnerconstruction.com/subcontractors to complete the Subcontractor/Vendor Prequalification Application. Please sign in to your computer as PRIVATE USER instead of public or shared. Otherwise the information will not be saved on the forms. Click on Create User and enter requested information. Once you hit submit you will be asked to enter your email address and contact information. Once submitted you will then receive a username and password (allow up to 15 min.) that will allow you to log back in and complete the prequalification. When completing the prequalification application online please make sure to check “Orlando / Miami, Florida” as the geographical region you would like the prequalification application to be submitted. In the interest of expediting the process, we respectfully request you enclose the following in addition to your completed prequalification statement: Safety Experience Modification Rate (EMR) for the last three (3) years on letterhead from Insurance company (If your EMR is over 1.0 you must request a letter from your insurance company explaining what contributed to the high EMR and what safety measures you are now taking) OSHA 300/300A Logs for the last three (3) years A copy of your audited Financial Statement (not more than 12 months old), Reviewed Financials or Compiled on Accrual Basis Financials Current & Completed projects list - last 3 years Insurance Carrier Information – Sample Certificate of Insurance Letter from your Bonding Company Information indicating single project and aggregate capacity Completed and signed W-9 Form Certificates (MBE, WBE, DBE, etc.) If Applicable
UPCOMING CONTRACTING/BIDDING OPPORTUNITIES SOUTH FLORIDA DMS Rohde Fire Alarm Replacement Project Description: Install new complete fire alarm system in entire complex which includes two (2) buildings and two (2) garage at the Rohde Building located in downtown Miami. Work will entail installation of new fire alarm system , demolition of old fire alarm system, misc. drywall and ceiling patching and painting. . Bid Packages: Electrical, Fire Alarm, Drywall and Paint. Approximate Bid Phase: Early 2nd Quarter 2018 CONTACT: Pete Lopez FOR MORE INFORMATION ON THE ABOVE PROJECTS (786) 621-9033 or plopez@tcco.com FLL Terminal 2 Modernization Project Description: This project is a Modernization Program for Terminal 2 (T2) at Fort Lauderdale-Hollywood International Airport (FLL). Scope of the FLL T2 Modernization includes over 200,000 SF of major renovations and expansions at the Arrival Level, Departure Level, Mezzanine Level and Roof Level to meet modern security and design standards. The terminal will expand by ~20K SF, from ~30K SF to ~50K SF, increasing space in concessions, security and restrooms with minimal impacts to the aircraft apron which surrounds the building. Bid Packages: Core, Shell, Interior & Exterior Finishes, MEP’s, and Sitework Approximate Bid Phase: Mid-January 2018 through February 2018 CONTACT: Joe Harlow for interest in T2MP (786) 621-9098 or jharlow@tcco.com
TURNER CONTACTS: LARRY BLACKBURN VP – Florida Healthcare Director lblackburn@tcco.com 305-619-7898 ROBERT LEYVA Senior Project Manager rleyva@tcco.com 305-970-7734 CHAD NEWELL Project Superintendent cnewell@tcco.com 305-216-6345 ANDREW ROCCA Preconstruction Senior Estimator arocca@tcco.com 786-621-9129 RHONDA WIMBERLY Community & Citizenship Director rwimberly@tcco.com 786-621-9004 GREG WALKER Procurement Agent gwalker@tcco.com 786-621-9006
FOSTER CONTACTS: ADRIAN FOSTER President – Foster Construction afoster@fosterconstructionsf.net 305-219-3564 Henry Harden Asst. Superintendent hharden@fosterconstructionsf.net 561-414-4489 Dexter Foster II Asst. Estimator dfosterii@fosterconstructionsf.net 305-788-6590 Julien David Asst. Project Manager jdavid@fosterconstructionsf.net 954-529-7907
QUESTIONS