Extraction Michael Bevins May 17, 2007

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT PROJECT MANAGER ENGINEERING MANAGER PROCUREMENT MANAGER CONSTRUCTION MANAGER.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Existing Arcs and 4m Dipole Preliminary Design and Safety Review Beam Transport Interface Mike Bevins February 22, GeV Upgrade - Beam Transport.
Tritium Target 9 December Overview Design and major subsystems Thermal/structural analysis Cell filling Vent and stack T2 detection and monitoring.
G2p/GEp Beamline Tim Michalski Project Lead. Overview Facilitate the design, procurement, and build of the beamline – up to the target chamber g2p/GEp.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
LIGO-G D partial ADVANCED LIGO1 Optical Layout Cavity Lengths Input Mode Cleaner (IMC) »IMC FSR = ~9 MHz »Length = ~16.6 m = ~HAM1 to HAM3 separation.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
LINACs Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
GlueX Solenoid Update George Biallas May 12, 2010 GlueX Collaboration Meeting.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
Joseph Tuozzolo EIC Stony Brook University January 10, 2010 MeRHIC Engineering Challenges and Solutions for MeRHIC.
Quad Girders Michael Bevins May 3, GeV Upgrade - Beam Transport Quads & Girders, Arc 10 and Hall D Layout Preliminary Design and Safety Review.
Bubble Chamber Installation Kick-Off Meeting May 28, 2014, Grames Let’s discuss two jobs between the cryounit and injector gate. Bubble chamber (5D) New.
Thomas Jefferson National Accelerator Facility Page 1 23 rd Annual HUGS Program June 2-20, 2008 CEBAF Overview HUGS08 June 3 CEBAF Overview HUGS08 June.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Proton Plan Director's Review 8/15/06 – Booster Corrector UpgradeDrennan1 Proton Plan Booster Corrector Upgrade Directors Review August 2006 Presenter:
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Injector/Re-injection Chicane Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 BROOKHAVEN SCIENCE ASSOCIATES ASD Procurements Gregory Fries Liaison/Manufacturing Engineer NSLS-II ASAC October 22-23, 2009.
2008 Beam Transport Design Status and Safety Review Beam Transport - Layouts, Stands, Girders, Vacuum, etc… Mike Bevins, Ross Bailes & David Green For.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review Vacuum Systems H.-C. Hseuh January 4, 2007 Vacuum Systems.
Status of MAMI C Hans-Jürgen Arends CB-Meeting, Basel October 4-6, 2006.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Extraction Michael Bevins May 17, GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
56 Mhz Vacuum Mike Mapes Mhz Insulating Vacuum TURBO PUMP WITH GATE VALVE AND GAUGE SET MOUNTED ON TANK SIMILAR TO RHIC CRYOSTAT & VALVE.
Spreaders & Recombiners Beam Transport Michael Bevins May 30, GeV Upgrade - Beam Transport Spreader/Recombiner Dipoles and Layout, & Installation.
D&D Review 6 August PEP-II Minimal Maintenance State Upkeep Stan Ecklund (J. Seeman, S. DeBarger, D. Kharakh, M. Zurawel)
Hall A Installation Review John J. LeRose 2/25/2009.
February 17-18, 2010 R&D ERL Gary McIntyre R&D ERL ERL Status & Schedule Gary McIntyre February 17-18, 2010 ERL Status & Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Vacuum, H-C. Hseuh January 4, 2007 RHIC II Project Internal Cost Review H.-C. Hseuh Vacuum Systems January 4, 2007 Project Overview.
The SNS Power Upgrade Project Building on the Success of the SNS Accelerator Deployment Kevin Jones Research Accelerator Division Director.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
Introduction Six-Month Follow-Up on Action Items of Feb 2016 CEBAF Field Emitter Workshop Rongli Geng September 12, 2016.
High energy beam transport.
PETRA III, Status and Upgrade
LERF as Cryomodule Testing Facility Set-Up and Installation Logistics
2K Cold Box PDR Introduction
IT-4189 Supply and installation of a cryogenic distribution system
Jefferson Lab Reliability Task Force and Initiatives
Michael Sullivan and John Seeman SLAC National Accelerator Laboratory
UK RFD Pre-Series cryomodule
Potential Use of PEP-II Magnets by Project X
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
Experimental equipment Edgar L. Black February 17, 2019
Performance Recovery at CEBAF
MEIC Cost Estimate Overview
J. Seeman Assistant Director for PPA/LCLS
Electron Beam Systems ETC and Methodology
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Linac LLP Outline LINAC Long Lead Procurements
Licensing update ESHAC #7, October 2017
LCLS e- Beams Systems Manager
SNS-PPU upgrades the existing accelerator structure
Overview of the TARGET Monolith Rough Vacuum
Presentation transcript:

Extraction Michael Bevins May 17, 2007 12GeV Upgrade - Beam Transport Injection, Linac, Extraction, & Correctors Preliminary Design and Safety Review Extraction Michael Bevins May 17, 2007

Outline Introduction & Scope Requirements & Specifications New/Modified Extraction Elements/Girder Count Beam Transport Layouts Safety Considerations Cost Estimates Risk Assessment Summary

Introduction & Scope The extraction region must be upgraded to support transport of higher energy beam to halls A, B, & C and 5th pass beam to the new arc 10 to support 12GeV operations Songsheet level machine layouts will be presented along with cost estimates Extraction Region

Requirements & Specifications Alignment specs Quads & dipoles positioned to +/-0.5mm in x & y, +/- 1.0mm in z Vacuum specs Beam line partial pressure of hydrogen <10-6 torr Total average pressure of all other constituents less than 5x10-7 torr Fabrication, welding, cleaning & handling, and leak checking specs still apply 22631-S-001 Fabrication of Ultra-High Vacuum Equipment 22632-S-001 Cleaning and Handling of U.H.V. Components 22633-S-001 Welding Specification For U.H.V. Components 22634-S-001 Helium Leak Test For U.H.V. Components Note an update and modernization of our vacuum specs is underway

New/Modified Extraction Elements/Girder Count Preliminary - pending CASA review and more detailed vacuum study Elements in red are part of I&C WBS

Beam Transport Layout - Extraction

Extraction Layouts – RF Separators Current Configuration 12GeV Configuration New double quad girder New quad girder Relocated New Two new pedestal stands Existing supports

Extraction Layouts – RF Separators

Extraction Layouts – Septa Magnet Stacks Current Configuration 12GeV Configuration New quad girder Two new support stands Relocated Two YBs One relocated and one new support stand New Three YRs Two new pedestal stands YA Septa Stacks YB/YR Septa Stack

Extraction Layouts – Septa Magnet Stacks Existing YA Septa Stack Existing YB Septa Stack

Extraction Layouts – Dipole Magnet Stacks Current Configuration 12GeV Configuration New Two new support stands Three BPs New BP Dipole Stack

Extraction Layouts – Dipole Magnet Stacks Current Configuration 12GeV Configuration New

Extraction Layouts – Dipole Magnet Stacks 12GeV Configuration Two existing BQs New support stand Three new BPs New New BP New pedestal for 5th pass BP downbeam support Two new pedestal supports for 5th pass BP BQ/BP Dipole Stack BP Dipole Stack

Extraction Layouts – Dipole Magnet Stacks BP Stack BQ Stack Existing BP Dipole Stack Existing BQ Dipole Stack

Safety Considerations Personnel Training Jlab & sub-contractor Radiation Designated areas for containment and radiation survey of material that will be removed from the tunnel Material handling Provide provisions for lifting Electrical Hazards Package and support electronics, power leads and terminal blocks to control electrical hazards

Cost Estimates –Extraction WBS Rollup * * Septa and dipole vacuum chambers WBS Elements I have covered today

Cost Estimates - Highlighted WBS Stands - Procurements

Risk Assessment Technical - Low Girders & Supports – very similar designs exist and are already proven Vacuum - existing designs already proven, detailed vacuum analysis TBD Alignment - same as existing machine Procurement Schedule - Low No long-lead items identified Cost – Low Good cost estimates for machined parts Vendor & Jlab shop budgetary estimates

Summary Preliminary extraction beam transport layouts and cost and installation estimates are complete based on present scope We are in a good position to support our DOE External Project Reviews this summer We will continue to work closely with our friends throughout the lab (safety, CASA, installation, vacuum, alignment, RadCon, I&C, magnet measurement, operations, procurement & facilities) as we move forward Detailed design will be completed to support assembly and installation schedules We look forward to comments & recommendations from the committee