CARTRIDGE SEAL INSTALLATION. CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

CHAPTER 45 Engine Lubrication.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
SERVICING EVAPORATIVE
Installation Procedures
Used with FILTERS Copyright © 2013 by The S.E.A. Group.
Waukesha Cherry-Burrell
Service Training PV Series 42 PVplus
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
GLOBAL LIFT CORP COMMERCIAL SERIES PORTABLE KIT Portable Kit -
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Nov. 19, 2007 Rev. B.
PUMP CONDITION EVALUATION. BEARINGS PUMP SHAFT BEARING FRAME REAR COVER IMPELLER PUMP CASE.
“Pumps” Troubleshooting Guide
New Mexico FFA Agricultural Mechanics Career Development Event Engine Power.
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
Getting Ready Gather tools, oil and filter. If you plan to change your oil regularly, consider investing in jack stands, a socket set and an oil drain.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
Oil Pressure Testing.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
1 InnoSys Quick Connect End Effecter Service and Maintenance Procedures Shreveport Assembly 14 MAY, 2008.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
M300, M300N, M300Z (2½ ”–10”) M300A (2½ ”- 4”). Modification Overview  Production began in 2000 under the Hunter name. In 2002 it was produced as the.
ENGINE MODE CODES.
Mudtight GOLD þ ý Instructions 32mm - 180mm
475, 475V, 475XL 4”-10”.
MAGM 262 Hydraulic Seals Mr. Conrado.
826YD 21/2”-10”.
774X 21/2”, 6”, 8”.
2000SS 2½”-12”.
800 (M2,M3,M4) ½”-2”.
Gaskets and Packing An introduction to Gaskets Packing
Disassembly and Assembly of A800C-W Electronic Governor Actuator for 7100 Fuel Injection Pump
½”- 2”.
450 2½”- 3”.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
774 DCDA 21/2”-12”.
909 3/4”-2”.
Chapter 13 Lubrication.
4D-100, 4D-600 2½”- 10”.
850 (LF) ½”- 2”.
C200, C200N, C200Z (2½ ” – 10”) C200A (2½ ”- 6”).
2000SS 2½”-12”.
Gaskets and Packing An introduction to Gaskets Packing
975 2½”-10”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
M200, M200N, M200Z (2½”– 10”) M200A (2½”- 4”).
C400, C400N, C400Z 21/2”-10”.
C300, C300N, C300Z (21/2”–10”) C300A (21/2”- 6”).
375DA 2½”-10”.
M400, M400N, M400Z 21/2”-10”.
757DCDA, 757N DCDA (21/2”–10”) 757A DCDA (21/2”- 6”)
450DA 4”-10”.
757, 757N, 757Z (2½ ” – 10”) 757A (2½ ”- 6”).
709 3/4”-2”.
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

CARTRIDGE SEAL INSTALLATION

CHECK PUMP SHAFT FOR BURRS CHECK GLAND BOSS FOR NICKS LUBRICATE SECONDARY SEALS SLIDE SEAL ONTO PUMP SHAFT ASSEMBLE PUMP COMPONENTS SET IMPELLER CLEARANCE BOLT UP SEAL GLAND TIGHTEN SET SCREWS AND PULL TABS

CARTRIDGE SEAL INSTALLATION BURRS ON THE PUMP SHAFT COULD CUT SHAFT/SLEEVE O-RINGS WHEN INSTALLING THE SEAL RESULTING IN LEAKAGE NICKS OR ANY OTHER IRREGULARITY ON THE GLAND BOSS COULD RESULT IN IMPROPER SEALING OF THE GLAND GASKET/O-RING

CHECKING SHAFT AND GLAND BOSS FOR BURRS, NICKS OR OTHER IRREGULARITY

CARTRIDGE SEAL INSTALLATION LUBRICATE O-RINGS/GASKETS SO THAT THEY DONT HANG UP, TEAR OR ROLL OUT WHEN SLIDING THE SEAL ONTO THE PUMP SHAFT LUBRICATING THE GLAND O-RING WILL PREVENT IT FROM FALLING OUT OF THE O-RING GROOVE BEFORE BOLTING UP THE GLAND

CARTRIDGE SEAL INSTALLATION GENTLY SLIDE THE SEAL ASSEMBLY ONTO THE PUMP SHAFT UNTIL THE SHAFT/SLEEVE O-RING IS RESISTING APPLY EVEN PRESSURE TO THE END OF THE SEAL SLEEVE UNTIL THE SHAFT/SLEEVE O-RING SLIDES ONTO THE PUMP SHAFT ASSEMBLE THE REMAINING PUMP COMPONENTS TAKING CARE NOT TO IMPACT THE SEAL ASSEMBLY

CARTRIDGE SEAL INSTALLATION

ONCE ALL PUMP COMPONENTS ARE ASSEMBLED, SET IMPELLER CLEARANCE. DO NOT SET IMPELLER CLEARANCE AFTER THE SEAL HAS BEEN BOLTED UP AND SET CHECK GLAND ORIENTATION REQUIREMENTS AND BOLT UP THE GLAND ACCORDINGLY

CARTRIDGE SEAL INSTALLATION

TIGHTEN ONE SET SCREW UNTIL IT TOUCHES THE PUMP SHAFT LIGHTLY MOVE TO THE OPPOSITE SET SCREW AND TIGHTEN IT FULLY FULLY TIGHTEN ALL SET SCREWS REMOVE SET TABS IF THE PUMP IS TO BE STORED WITH A SEAL INSTALLED, DO NOT TIGHTEN SET SCREWS OR REMOVE SET TABS

CARTRIDGE SEAL INSTALLATION

STORING ASSEMBLED PUMP IF THE PUMP IS TO BE PLACED IN STORES WITH A CARTRIDGE SEAL PRE- INSTALLED, DO NOT TIGHTEN GLAND BOLTS OR SET SCREWS LEAVE GLAND BOLTS HAND TIGHT AND DO NOT REMOVE SET TABS –If gland orientation does not match up with piping configuration in the Unit, the seal can be rotated without disturbing seal faces

END CARTRIDGE SEAL INSTALLATION