Project planning and status (May 2018)

Slides:



Advertisements
Similar presentations
Surface contour scanning system
Advertisements

Laser Speckle Extensometer ME 53
Lecture 11. Microscopy. Optical or light microscopy involves passing visible light transmitted through or reflected from the sample through a single or.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
EATM12-08 Contribution NA62 Francois Butin, Lau Gatignon / EN-MEF 4 September 2012.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Undulator Orientation & Electron Beam Spacing Should the undulator frames be toward the central aisle or the tunnel walls? What is the optimum spacing.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
How to startpage 1. How to start How to specify the task How to get a good image.
 PROFESSOR: CHARLES KUNG  GROUP MEMBERS: AKRAM GERIES, JEEVEN HUGH, MICHAEL LADAS, BRAD LONG.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
Low Energy RHIC e - Cooling 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity.
The Polarized Internal Gas Target of ANKE at COSY
P-Carbon CNI polarimeter upgrades. Vacuum system. Target drives. Targets. Polarimetry Workshop, July 31, 2009 A.Zelenski for polarimetry group.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
H. Weick, 8 th MAC meeting, GSI, Super-FRS Status Target Area H. Weick / M. Winkler 8th FAIR - Machine Advisory Committee Meeting
AUSTRALIAN NATIONAL UNIVERSITY NUCLEAR PHYSICS DEPARTMENT RECENT ALIGNMENT EFFORTS ALIGNMENT EFFORTS AT THE HEAVY ION ACCELERATOR FACILITY ACCELERATOR.
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Systematic studies on pellet beam production M.Büscher, A.Gerasimov, V.Chernetsky, P.Fedorets, A.Dolgolenko,V.Balanutsa, A.Boukharov, L.Gusev, S. Mineev,
PANDA Target Pipe Meeting Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Target Pipe Meeting February 2013.
1 SLAC RC Status Report 19 July 2010 LHC Collimation Working Group Meeting Jeff Smith/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
Development of a pellet tracking system for PANDA and WASA Goal:  know interaction point with a few 100  m accuracy in 3d(xyz). Method: Track pellets.
Common Systems – Holger Kollmus Holger Kollmus FAIR - Machine Advisory Committee Meeting Common Systems and Controls.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
USTileCal Planning UTA ITC Scintillator Project R. Miller May 13, E3 C10 B11 E1 D5 A14 - A15 B14 D6 A D4 A12 A13 B12 - B
(22) Pellet tracking Panda CM GSI Status of pellet tracking 1 - Multi-camera system developments. Readout electronics…. Mechanics (at UPTS)
HADES collaboration meeting XXX, Lisbon, 7-10 October, 2015,
BM&N STS ladders assembly in VLHEP
ATF2 Status N.Terunuma, KEK
DT-LHCb coordination meeting 18 April 2016
A 3D design model of the apparatus for the Laser Wakefield Acceleration of electrons at ELI-NP S. Balascuta1 , R. Dinca1 1) “Horia Hulubei” National.
Jaak Lippmaa HIP, Helsinki University
Project supported by JCHP-FFE, EC FP7 and Swedish Research Council
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Options and Recommendations for TL and Dumps
SLS Timing Master Timo Korhonen, PSI.
Status of different Parts Budget Summary
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Gingin Advisory Committee Meeting 08 Dec 2009
IHEP group Shashlyk activity towards TDR
Vertex Detector Mechanical R&D Design Questions and Issues
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Phase Camera hardware Nothing really new, only summarising status
IFR detector mechanics
RADAR -Range and Bearing Discrimination and Accuracy.
The digital read-out for the CSC system of the TOTEM experiment at LHC
Project planning and status (February 2018)
Status of the PANDA Cluster-Jet Target Quarter 1/2018
On the accuracy of port assembly at Wendelstein 7-X
KICKER STATUS G-2 meeting March 5, 2014
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
The digital read-out for the CSC system of the TOTEM experiment at LHC
A Virtual Implementation of VELA (CLARA)
Cryomodule Assembly Plan
Pellet Target developments
Variable distance from beam.
Pellet Target developments
BGC Collaboration Meeting –
Presentation transcript:

Project planning and status (May 2018) PANDA pellet tracking Project planning and status (May 2018) Ongoing: Multi-camera r/o, control, monitoring and analysis developments. Preparation of a “generator” tracking chamber that can house four measurement levels. All hardware details for the chamber are ready for assembly in June. Time line: Tests of a measurement level module (DM) prototype were done 2016. Tests of the “generator” tracking section start in autumn 2018 ... Design of the “dump” tracking section. It depends on mechanical design of the target dump area and on experience from cluster-jet tests at COSY. To be able to prepare the complete system with two tracking sections, additional funding is needed. Then it may take only a few years if some of our expert personnel (and infrastructure) is still available. Risks: Evaluation done (Autumn 2013 (TDR), Feb 2015 (SG) ). Funding: Consumables and running: Almost zero ... HPH2020 application will be submitted 2018 …. (?) Equipment: CTS grant (20k€) 2017-18. New application was submitted. Multi-cam s-w slow progress due to lack of manpower. SG 2015 comment still valid: “Funding remains an open problem”. The pellet tracking project is not in the PANDA cost book and it is not a Swedish FAIR in-kind contribution. It can therefore not get part of the dedicated SRC support for PANDA. We see therefore no possibility for substantial financing at present. The special problem with funding should be well known since many years by the PANDA management. CTS = Carl Tryggers Stiftelse (a private foundation), SRC = Swedish Research Council, HPH = Hadron Physics Horizon, DM = Detection Module

Tests of “Pellet Tracking” with PANDA Cluster-jet at COSY The PTR system will provide jet (x,y) position, shape and detailed variations on different time scales, possibly down to 20 microsec. Some differences between cluster-jet and pellet-stream that the system has been adapted for: 1) size at accelerator pipe about 13 mm compared to 3 mm 2) time structure continuous on the scale of microseconds 3) optical properties i.e. light reflection and transmission Also to some extent how to treat the camera image information. The present UPTS tracking chamber with two measurement levels will be used together with .... ... two DMs each equipped with one LS-camera and one STR-laser at 90 degrees, both with modified optics to cover the jet completely. Compared to a monitoring system based on a standard laser and CCD camera, the PTR system provides possibility to record data at higher rate and the intense illumination gives possibility to use shorter exposure times. This in turn allows studies of time structures and time correlations on a shorter time scale. Time variations down to a few ten microseconds time scale could be studied. If 10 microsec cycles can be used, the jet speed might be measured with some per cents accuracy (for v=200m/s and dt=10 microsec), by studying suitable disturbances. ”If”, refers mainly to light yield and data-taking/handling capacity. The laser beam must be orthogonal to the camera line of sight (for technical reasons), since a wide laser beam that covers the whole jet, requires the big windows. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate, i.e. not individually as in this photo. Time plan: Spring - Summer 2018 – assemble and prepare the setup in Uppsala. All h-w details are ready. Summer service period w25 – install the PTR chamber at COSY. Autumn 2018 ... – install the DMs and carry out tests.

PTR chamber and maybe cabling* together with installation of the dump. Installation of the Pellet tracking system at the COSY beam region, in steps: PTR chamber and maybe cabling* together with installation of the dump. Two DMs with cameras and lasers just before a test with the cluster-jet. The cluster-jet test vacuum chambers at COSY. Photo of the installed scattering chamber, April 2017. The PTR chamber will sit just below the COSY beam. The PTR DM plates will stick out from the chamber 310-340 mm in different directions. Some space for mounting is also needed around the chamber. Maybe need for some radiation shielding of the LS-cameras. We have no experience of running the LS-cameras in a radiation environment. It may be needed some radiation shielding of the cameras. One should be prepared for this (just in case ...) *) Cabling: CamLink cables 10 meter long between camera and W7 PC with frame grabber (FG) cards. 2) Power distribution box(es). At least one which is possible to switch on/off from Cosy eye. 3) Laser control USB cable 10 meter long between laser intensity control box (Moxa) and W7 PC. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate (next slide). PTR chamber sent from Uppsala 24/5. Size = 30x30x30 cm Total weight = 22 kg

For the cluster-jet setup, 1 camera and 1-2 lasers will be used. Preparation and installation of the Pellet tracking system at COSY . The DMs should be pre-aligned in a desktop setup and installed just before the test. Its alignment should then be checked and fine tuned with the cluster-jet after the installation. The photo shows a DM with two cameras and three lasers in a desktop setup for alignment of the cameras and lasers. From left to right camera A, lasers B, C, A and camera B. The alignment target is normally placed at the cross in the center. For the cluster-jet setup, 1 camera and 1-2 lasers will be used. DM = Detection Module. Integrated module with cameras and lasers fixed on a common plate. .From “Test of the Pellet TRacking (PTR) system in a Cluster-jet setup” (hc170428).

”Uppsala CCD camera monitoring systems” A and B. System-A with DMs mounted on the PTR chamber. In this case also a std CCD camera can be mounted opposite to the LS-camera (photo from UPTS). System-B is w/o the LS-camera DMs. SNF-lasers and std CCD cameras are mounted in separate holders as it was on the WaC pellet pipe (left photo). A monitor image of 2.5 mm wide pellet stream in PTR chamber at UPTS (right photo). System-A is based on line-scan (LS) cameras and part of the PTR project (for PANDA). It has very good prospects for detailed monitoring but is for the moment out of question for initial tuning of the cluster-jet, and this for many reasons. System-B is based on standard CCD cameras and “tv”-monitors and it was used for pellet target tuning in WaC. It should be reasonably (very) easy to get into operation and hopefully work also for the cluster-jet target. System-B will be used for the initial cluster-jet tests this summer.