July Plenary Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0019r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 November Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Advertisements

Doc.: IEEE /0034r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Closing Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0039r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Opening Report IEEE P Wireless RANs Date: Authors:
Doc.: IEEE /0032r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE P Motions at the March 2012 Plenary EC Closing Meeting IEEE P
IEEE Status Liaison to ISO/IEC JTC1/SC6 January 2017
IEEE P802.22b Sep 2014 Plan & Report
November Plenary Closing Report
March 2013 Opening Report Date: Authors: March 2013
IEEE WG Status Report – July 2005
IEEE P Motions at the July Plenary EC Meeting
November Plenary Closing Report
November Plenary Opening Report
TGp Closing Report Date: Authors: July 2005 Month Year
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
July Plenary Opening Report
November Plenary Opening Report
March Plenary Opening Report
IEEE P Motions July Plenary EC Closing Meeting
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE P Project Status Date: Authors: July 2013
November Plenary Closing Report
IEEE WG Opening Report – March 2007
July Plenary Opening Report
TGp Closing Report Date: Authors: March 2006 Month Year
July Plenary Closing Report
Opening Report – November 2005
IEEE WG Opening Report – July 2008
March Plenary Closing Report
July Plenary Opening Report
November Plenary Opening Report
2013 March Plenary Closing Report
July Plenary Closing Report
July Plenary Opening Report
IEEE P Motions at the March 2012 Plenary EC Closing Meeting
March 2012 Opening Report Date: Authors: March 2012
November Plenary Closing Report
March Plenary Closing Report
November Plenary Closing Report
March Plenary Opening Report
March Plenary Closing Report
November Plenary Opening Report
IEEE WG Opening Report – July 2007
July Plenary Opening Report
March Plenary Opening Report
March Plenary Closing Report
July Plenary Opening Report
November Plenary Opening Report
[ Policies and Procedure Summary]
July Plenary Opening Report
EC Motions – November 2005 Plenary
March Plenary Closing Report
IEEE P Wireless RANs Date:
IEEE P802.22b May 2014 Plan & Report
November Plenary Opening Report
March Plenary Opening Report
July Plenary Opening Report
[ Policies and Procedure Summary]
March Plenary Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
November Plenary Closing Report
IEEE P802.22b July 2014 Plan & Report
IEEE P Motions at the July Plenary EC Meeting
March Plenary Closing Report
July Plenary Opening Report
IEEE P802.22b Teleconferences
November Plenary Opening Report
July 2013 Opening Report Date: Authors: July 2013
Presentation transcript:

July Plenary Closing Report Month Year doc.: IEEE 802.22-yy/xxxxr0 July Plenary Closing Report IEEE P802.22 Wireless RANs Date: 2017-07-04 Authors: Notice: This document has been prepared to assist IEEE 802.22. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.22. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures http://standards.ieee.org/guides/bylaws/sb-bylaws.pdf including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair Apurva N. Mody < apurva.mody@ieee.org > as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.22 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at patcom@iee.org. > Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report Month Year doc.: IEEE 802.22-yy/xxxxr0 Outline IEEE 802.22 WG Agenda IEEE P802.22 – Progress Report IEEE P802.22.3 - Spectrum Characterization and Occupancy Sensing (SCOS) Study Group Progress Report Letters of Assurance Past and Future Meetings Likely WG Motions at the March 2017 EC Meeting Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE 802.22 Meeting Agenda for the July 2017 Plenary can be found here Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 WG Agenda Opening Plenary Motions at the EC Affirmation of the new 802.22 Working Group Vice Chair IEEE P802.22.3 - Spectrum Characterization and Occupancy Sensing (SCOS) – Working Group Letter Ballot on Draft v1.0 under way. IEEE P802.22 Revision Project – Working Group Letter Ballot 1 Closed on 17th July 2017 IEEE P802.22.1 – PAR withdrawn Tutorial – None Mid-week plenary – Wednesday, PM1 from 1.30 pm to 3.30 pm – Meeting with the IEEE SA Fellows – Talked about WhiteSpaces and how it can be used for cost-effective broadband connectivity in developing countries. Closing Plenary (Thursday, AM2) EC Meeting IEEE 802.22 Meeting Agenda for the July 2017 Plenary can be found here Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE P802.22 On-going Projects Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 On-going Projects Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing The IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing (SCOS) PAR was approved by the EC and the IEEE SA NESCOM in July / August 2014 The IEEE P802.22.3 Requirements Definition was completed during the Berlin Plenary Meeting Call for contributions has been sent out. Interest from potential new members/ companies. Functional Requirements Document Complete Proposal Selection Criteria Completed Mr. Roger Hislop (Internet Solutions, South Africa) elected to be the Chair of the IEEE 802.22.3 Task Group. New Members Joining the 802.22.3 Task Group – NTIA, Cognitive Systems, SpectrumFi, Sony Apurva N. Mody, BAE Systems March 2012

IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing Prof. Oliver Holland (King’ s College London) was elected to be the Vice Chair of the IEEE 802.22.3 Task Group. Dr. Nilesh Khambekar was appointed to be the Editor of the 802.22.3 Task Group. Lots of progress was made on this project during Nov 2016 meeting. Participants included – Roger Hislop (Internet Solutions), Michael Cotton (NTIA), Ken Baker (NTIA), Oliver Holland (King’ s College, London), William Suriaputra (Cognitive Systems), Nilesh Khambekar (SpectrumFi), Jerry Kalke (CBS), Apurva Mody (BAE Systems), Chen Sun (Sony) New Members Joining the 802.22.3 Task Group – NTIA, Cognitive Systems, SpectrumFi, Sony Apurva N. Mody, BAE Systems March 2012

Working Group Letter Ballot 1 Completed. Comment Resolutions Ongoing IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing Schedule and Timelines 2016 2017 2018   3 5 7 9 11 1 Task Group formed X Functional Requirements Call for Proposals issued Selection Criteria Technical/Informative Contributions Proposal presentations Baseline proposal selected Draft for 1st letter ballot 1st letter ballot completed X  Comment Resolution 2nd letter ballot completed Comment Resolution and recirculation Sponsor ballot RevCom/NesCom Approval Working Group Letter Ballot 1 Completed. Comment Resolutions Ongoing Apurva N. Mody, BAE Systems March 2012

Apurva N. Mody, BAE Systems IEEE P802.22.3 Spectrum Characterization and Occupancy Sensing Telecon Schedule Johannesburg Tokyo Boston Denver Thu 15:00 Thu 22:00 Thu 09:00 * Thu 07:00 * Thu 16:00 Thu 23:00 Thu 10:00 * Thu 08:00 * Teleconference every other Thursday at 9 am ET which is 2 pm UTC Apurva N. Mody, BAE Systems March 2012

IEEE P802.22 Revision Project The P802.22 Revision PAR was Approved by the IEEE in March 2014 Work on the 802.22 Revision Project has started The revision project will: Fold in the IEEE 802.22a-2014 and IEEE 802.22b-2015 Amendments to 802.22 It makes corrections to the IEEE 802.22-2011 Standard The standard specifies operation in the bands that allow spectrum sharing where the communications devices may opportunistically operate in the spectrum of the primary service, such as 1300 MHz to 1750 MHz, 2700 MHz to 3700 MHz, and the VHF/UHF TV broadcast bands between 54 MHz to 862 MHz Apurva N. Mody, BAE Systems March 2012

The Working Group Letter Ballot on Draft 1 has been initiated IEEE P802.22 Revision Project The Working Group Letter Ballot on Draft 1 has been initiated Ballot Start Date: Sunday, June 18th, 2017 Ballot End Date: Monday, July 17th, 12 midnight, Anywhere on Earth. Ballot Pool: 802.22 WG Voting Members Working Group Letter Ballot 1 Completed. Comment Resolutions Ongoing Apurva N. Mody, BAE Systems March 2012

IEEE P802.22.1 Advanced Beaconing Progress Report Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22.1 Advanced Beaconing Progress Report IEEE802.22.1-2010 Standard was published in 2010 Revision Project on IEEE 802.22-2010 initiated that incorporates Advanced Beaconing for protection of systems in HF, VHF, UHF, and S-Band (2-4 GHz). Call for contributions made Functional Requirements Document Complete 2016 March 2016 – Proposal Selection Criteria Motion to Withdraw this PAR in November 2016 due to FCC/ NTIA not picking up this concept in the 3.5 GHz CBRS Report and Order Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE P802.22 Completed Projects Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Completed Projects Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Progress Report IEEE802.22-2011 Standard was published on July 1st 2011. The revision PAR for IEEE 802.22 Standard has been approved that folds in various on-going amendments (P802.22a, P802.22b) and generalizes it to other bands for spectrum sharing. The PAR form can be found here. Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22.2 Progress Report IEEE802.22.2-2012 Standard was published on Sept. 28th 2012. We would like to thank the 802.22 members and contributors, Members of the IEEE 802 Executive Committee, Members of the IEEE SA RevCom, Members of the IEEE SA Board and the IEEE SA Staff. Apurva N. Mody, BAE Systems. WhiteSpace Alliance John Doe, Some Company

IEEE P802.22a MIBs and Managememt Plane Procedures Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22a MIBs and Managememt Plane Procedures P802.22a Sponsor Ballot Process has been successfully completed Received RevCom Approval Standard was published in June 2014 Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

Sponsor Ballot Summary for Draft v6.0, Re-circ #2 IEEE P802.22b Enhancement for Broadband Services and Monitoring Applications Sponsor Ballot Summary for Draft v6.0, Re-circ #2 Apurva Mody, BAE Systems, WhiteSpace Alliance November 2016

IEEE P802.22 Letter of Assurance Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Letter of Assurance The LoAs can be found on the website at www.ieee802.org/22 as well as on the IEEE SA website No new LoAs received. Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE P802.22 Liaisons with ISO/IEC/JTC1 and WhiteSpace Alliance Month Year doc.: IEEE 802.22-yy/xxxxr0 IEEE P802.22 Liaisons with ISO/IEC/JTC1 and WhiteSpace Alliance Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

IEEE 802.22 Status Liaison to ISO/IEC JTC1/SC6 Apurva Mody IEEE 802.22 Working Group Chair apurva.mody@ieee.org DCN 22-17-0001-00-0000

802.22 Completed Projects 802.22-2011- Flagship Standard on Cognitive Wireless Regional Area Networks – Commercial Name Wi-FAR®, Uses Television Band unused channels, so called WhiteSpaces to provide long and short distance broadband connectivity 802.22.1-2010 – Standard on Beaconing for co-existence. Uses beaconing technology from the primary users to alert the secondary users that the channel is being used 802.22.2 – Recommended practice for installation and deployment of IEEE 802.22 Networks 802.22a-2014 – Amendment to the IEEE 802.22 Standard on Management Information Base (MIB)s and Management Plane procedures 802.22b-2015 – Amendment to the IEEE 802.22 Standard for Enhancement for Broadband Enhancements for the Broadband Services and Monitoring Applications

802.22 Active Projects/Status IEEE 802.22 Revision: Merges the 802.22a-2014 and 802.22b-2015 amendments Adds new capabilities for spectrum sharing in other bands where spectrum sharing may be allowed New technologies such Full Duplex Simultaneous Transmit and Receive Projected Completion Date: November 2018 IEEE 802.22.3 Spectrum Characterization and Occupancy Sensing: Creates a new standard for distributed spectrum monitoring Applications include spectrum management, spectrum de-confliction, interference monitoring and awareness, on-demand spectrum survey and reporting, coverage analysis, shadowing and fading analysis, spectrum mapping and spectrum planning

Projects for IEEE/ ISO/IEC PSDO process 802.22-2011 – Approved to become an ISO Standard in 2015 802.22a and 802.22b – PSDO process started. The Chair of the 802.22 WG needs to follow through with Jodi to see if the the comment resolutions on 802.22a and 802.22b were sent to the ISO/IEC/JTC1 No new Projects at this time need ISO approval. 802 Last draft liaised 60-day pre-ballot 5-month FDIS ballot Comments resolved .22a Std Jul 15 Passed Apr 16 Waiting - Nov 2016 .22b

Future Sessions IEEE 802.22 Future Sessions are planned as follows Month Year doc.: IEEE 802.22-yy/xxxxr0 Future Sessions IEEE 802.22 Future Sessions are planned as follows Session Dates Location Plenary July 9-14, 2017 Estrel Hotel, Berlin November 5-10, 2017 Caribe Hotel and Convention Center, Orlando, FL March 4-9 2018 Hyatt Regency O’Hare, Rosemont, Illinois July 8-13 2018 Manchester Grand Hyatt, San Diego, CA November 11-16, 2018 Suzhou, China Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

No Tutorials Sponsored by the IEEE 802.22 Working Group this time Month Year doc.: IEEE 802.22-yy/xxxxr0 802.22 Sponsored Tutorial No Tutorials Sponsored by the IEEE 802.22 Working Group this time Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

Motions at the EC Closing Meeting Month Year doc.: IEEE 802.22-yy/xxxxr0 Motions at the EC Closing Meeting Apurva N. Mody, BAE Systems, WhiteSpace Alliance John Doe, Some Company

No Motions to the EC this Time

References 802.22 July 2017 Plenary Working Group Agenda https://mentor.ieee.org/802.22/dcn/17/22-17-0050-01-0000-ieee-802-22-july-plenary-working-group-agenda.xls 802.22 July 2017 Plenary Working Group Meeting Motions https://mentor.ieee.org/802.22/dcn/17/22-17-0053-00-0000-july-plenary-meeting-minutes.docx Slide 27 Apurva N. Mody, BAE Systems, WhiteSpace Alliance