1 Avista Labs – Who We Are Backup Power Solution Provider Electrical Hardening 24 / 48 / 125 VDC Systems Resulting in: Increased Network Reliability Reduction.

Slides:



Advertisements
Similar presentations
FIGURE 7.1 Elements of the final control operation.
Advertisements

Symantec 2010 Windows 7 Migration EMEA Results. Methodology Applied Research performed survey 1,360 enterprises worldwide SMBs and enterprises Cross-industry.
Symantec 2010 Windows 7 Migration Global Results.
Background images courtesy of abc.com 1,000, , , ,000 64,000 32,000 16,000 8,000 4,000 2,000 1,
PV String Monitoring Solution
Automation and Drives s SIRIUS 1 s SIRIUS Soft Starts.
Fill in missing numbers or operations
1 National Urban Search & Rescue Response System Communications Specialist Course Communications Specialist Course Skill 2 Unit 3: AC Power, Distribution,
Objectives u Provide Knowledge and Understanding of Physical and Chemical Properties u Provide Knowledge and Understanding of Health Effects u First Aid.
15. Its December and you want to heat up your pool. It is currently 50 o F (10 o C) and you want it raised to 80 o F (27 o C) Using an electric heater,
Cost Behavior, Operating Leverage, and Profitability Analysis
IGVC Power Team (BZZZZT!) Presentation October 17 th Electrical Engineering Senior Projects 1 Nate – Jake – Tim.
FIGURE 2.1 The purpose of linearization is to provide an output that varies linearly with some variable even if the sensor output does not. Curtis.
CALENDAR.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
Learning to show the remainder
Druck- und Temperaturmesstechnik Testing Procedure MH-2 Mobile Hydraulic Testing Procedure 1 Pressure Transmitter MH-2.
SITOP power Automation and Drives SITOP modular The First Modular Power Supply SITOP - a step ahead.
Sequential Process Control
Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
340 Voyager rooftop range Dual Fuel DKD/H Voyager II Voyager III kW Heat Pump Cooling Only Gas Fired
SAE J1772™ Gery J. Kissel Engineering Specialist General Motors
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Introduction Senior Design Team SD0609 ECE Card Key Security System Nick Moszer Raylin Nevland Ryan Lindsay.
MX250 Power on and off, Console Mode. January 2004 Page 2 Power Supply MX250 has ac and dc inputs –ac 100 to 240 V, 5A, 50 to 60 Hz –dc –48 V, 6A –worldwide.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
Wireless Controllers. Building block for remote control & alarming Functions Local control Measurement SMS alarming Remote control via SMS Data transmission.
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Chapter 1 Introduction to the Programmable Logic Controllers.
COST OF COOLING Robert Eppich– Eppich Technologies; AFS Energy Coordinator Rob Lepage– bitCraft Embedded Energy Solutions.
Online Emergency Lighting Inverter Three Phase 3 KW KW.
Stand-By Emergency Lighting Inverter Three Phase 3 KW – 125 KW.
PP Test Review Sections 6-1 to 6-6
1 1 BASICS OF ENERGY MANAGEMENT Section A - Energy Basics.
Solutions for Flaring Reduction Dual-Fuel & Gas Engines
John Ogilvie High School - CfE Physics
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Presented to: By: Date: Federal Aviation Administration Fuel Cell Flammability Fuel Cartridge Assessment Intl Aircraft Systems Fire Wkg Grp Harry Webster.
USER MAINTENANCE.
PRETON PRESENTATION PRINT COST SAVING (PCS) TECHNOLOGY PRETON - PRINT AND SAVE February 2006.
HumidiClean. New After 400 Hours After 800 Hours Ionic Bed.
Comments on the gas system Issues of scale What gas mix? Summary Karol Lang The University of Texas at Austin NuMI Off-axis Experiment Detector Workshop.
Gas Quality E.ON Gastransport SIMONE Congress 2008, Dubrovnik Jörg Bödeker, Dr. Dietrich Weise.
[Compact. Durable. Ingenious.]. Extra bright, highly visible LEDs Fits comfortably in the hand Separate Info display Extremely robust construction High.
Sensor Operating Theory
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
SITOP power facets A&D SE PS SITOP power Automation and Drives SITOP power flexi The power pack handles it all - from 3 to 52V SITOP power.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Unit 11 Stoichiometry CP Chemistry.
Before Between After.
Energy Supply Concepts for the Region Guessing, Austria Dr. Reinhard Rauch Vienna, University of Technolgy.
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Static Equilibrium; Elasticity and Fracture
Converting a Fraction to %
Advanced Hydrogen Technologies Corporation
Select a time to count down from the clock above
MCS LWC MAGNUM ORIGINAL CONCEPTS  Designed to Control Loop Systems  Build to be generic and handle many configurations of Loop Controllers  Type of.
Hydrogen Basics Hydrogen First Discovered Henry Cavendish –Named for being a “water former” –1 Proton, 1 Electron –H2 - Diatomic Molecule, 2 Protons,
Hydrogen Installation System For Transit Buses CONFIDENTIAL PRESENTATION August 2011.
Heliocentris Commercial Confidential 1 Integration of Industrial Fuel Cells in Technical Applications Using the NEXA ® Training System Dr. Claus Fischer.
Design, Evaluation and Application of a Fuel Cell Vehicle
Online Emergency Lighting Inverter
Your Solution for: Energy Smart Management Real Time Power Monitoring Fuel Theft Prevention Technical presentation.
Online Emergency Lighting Inverter
Stand-By Emergency Lighting Inverter
Online Emergency Lighting Inverter
Presentation transcript:

1 Avista Labs – Who We Are Backup Power Solution Provider Electrical Hardening 24 / 48 / 125 VDC Systems Resulting in: Increased Network Reliability Reduction in Overall Lifecycle Cost Utilizing PEM Fuel Cell Technology

2 PEM Fuel Cell: How It Works

3 Modular, Cartridge-Based Design Superior Reliability Designed with the end-user in mind –Simple to operate –Easy to maintain Air-cooled system Hot-swappable cartridges –Failed membranes are bypassed –Load is not interrupted Self-humidifying –Less balance of plant is required –Performance is optimized at the cartridge level System performance/reliability not limited by the weakest membrane In the event of a membrane failure: –Immediate action is not required –A cartridge can be changed out in less than one minute

4 Hydrogen Basics Hydrogen First Discovered Henry Cavendish –Named for being a water former –1 Proton, 1 Electron –H2 - Diatomic Molecule, 2 Protons, 2 Electrons Colorless, Odorless, and has no Taste Burns with a pale Blue Flame Lightest Element in the Universe –H 2 = 1Mol = Grams –Disperses Rapidly - 1/16 the Density of Air –Flammable from 4% to 75% Concentration (40,000 to 750,000ppm) –Non-Toxic –Environmentally Benign

5 Hydrogen Safety Applicable Codes & Standards –NFPA 50A - Standard for Gaseous Hydrogen Systems at Consumer Sites. Covers the Storage of Hydrogen –ASME/ANSI B Process Piping Covers the Marking of Hydrogen –CGA G-5 - Hydrogen Covers the Basics of Hydrogen –CGA G Standard for Hydrogen Piping Systems at Consumer Locations. Covers the Design of Hydrogen Piping Systems –CGA G Hydrogen Vent Systems Covers the Venting of Hydrogen

6 Each kilowatt hour produced, requires 32 cubic feet of hydrogen 8.0 kWh140 lbs261 cu-ft9 x kWh125 lbs197 cu-ft9 x kWh65 lbs80 cu-ft6 x kWh29 lbs33 cu-ft6 x 24 Hydrogen is sold in high pressure steel or aluminum bottles which come in many different sizes. The actual storage capacity is dependent on bottle volume and fill pressure. Example Bottles Sizes: Hydrogen Storage 261 CUF 197 CUF 80 CUF 33 CUF 60

7 Independence 1000 Specifications Output: 1000 watts, 48/24/125 VDC Operating Cond: 0 o C to 50 o C –(-40 o C to 50 o C with enclosure) Start Up: –50% Power < 5 25C –100% Power < 18 25C Fuel Supply: Industrial grade H2 Supply Pressure: psi, Size: 17.25w x 20.5h x 25.12d Weight: 147 lbs. Operating Modes: –Battery Charger –Direct Power Supply

8 Typical Site Back-Up Power System – Fuel Cell Backup Run Time Determined by Size / Capacity of Hydrogen Storage

9 Inputs/Outputs OPERATION Manual Start –On/Off –E-Stop Remote Start –Low Voltage DC Start 52, 50, 48 or 46 VDC Setpoint Options –Dry Contact Closure –Loss of AC Power –Logic Level Start INDICATION: Operational –Contact Closure Minor Alarms: –Fan Failure –Cartridge Replacement Major Alarms: –Failure to Operate Safety Fan Failure

10 Operational Characteristics Start-UP –Dependent Upon Several Factors Relative Humidity Temperature Perocity of Membranes –Initial Phase 45 Seconds Declassifying Electronics Bay Sensor Warm-Up –Hydrogen Initiation 50% Power within 5 Minutes 100% Power within 18 minutes

11 Product Certifications ANSI Z Standard for Fuel Cell Power Plants > 50kW –Safety –Performance CSA FC1 - Updated ANSI Z Stationary Fuel Cell Systems CE - Tested –EMC: EN50165, clause EN EN –Safety: EN Part 1 edition 4.1

12 Maintenance: Independence 1000 Periodic Cycling –Recommended 1/month for 20 minutes Membrane Hydration Operational Verification Filter Inspection –Biannually, or Every 100 Hours of Operation Main Air Intake Filter Electronics Bay Filter