Graduate Program in Business Information Systems Inventory Decisions with Uncertain Factors Aslı Sencer.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Inventory Control Models.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Fill in missing numbers or operations
Chapter 6 Elasticity and Demand.
Chapter 6 Cost and Choice. Copyright © 2001 Addison Wesley LongmanSlide 6- 2 Figure 6.1 A Simplified Jam-Making Technology.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2002 Pearson Education, Inc. Slide 1.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Single Period Inventory Models
Inventory Management II Lot Sizing Lecture 5 ESD.260 Fall 2003 Caplice.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt ShapesPatterns Counting Number.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Year 6 mental test 15 second questions Calculation Addition.
Identifying money correctly 1
ZMQS ZMQS
Slides 8a: Introduction
On Sequential Experimental Design for Empirical Model-Building under Interval Error Sergei Zhilin, Altai State University, Barnaul, Russia.
The 5S numbers game..
Chapter 4 Supply Contracts.
Independent Demand Inventory Systems
Slides prepared by JOHN LOUCKS St. Edward’s University.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Break Time Remaining 10:00.
The basics for simulations
Inventory Control Models
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
ISEN 315 Spring 2011 Dr. Gary Gaukler. Newsvendor Model - Assumptions Assumptions: One short selling season No re-supply within selling season Single.
Chapter 16 Option Valuation.
Copyright © Cengage Learning. All rights reserved.
Decision Modeling Decision Analysis.
Cost-Volume-Profit Relationships
1 Chapter 16 When demands are unknown, expected values are the keys for deciding how much to order and how often. Inventory Decisions with Uncertain Factors.
Effects on UK of Eustatic sea Level rise GIS is used to evaluate flood risk. Insurance companies use GIS models to assess likely impact and consequently.
Re-Order Point Problems Set 1: General
2009 Foster School of Business Cost Accounting L.DuCharme 1 Decision Making and Relevant Information Chapter 11.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
We are learning how to read the 24 hour clock
Chapter 1: Expressions, Equations, & Inequalities
Adding Up In Chunks.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Week 1.
Number bonds to 10,
We will resume in: 25 Minutes.
Converting a Fraction to %
Clock will move after 1 minute
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
3 - 1 Copyright McGraw-Hill/Irwin, 2005 Markets Demand Defined Demand Graphed Changes in Demand Supply Defined Supply Graphed Changes in Supply Equilibrium.
1 Managing Flow Variability: Safety Inventory The Newsvendor ProblemArdavan Asef-Vaziri, Oct 2011 The Magnitude of Shortages (Out of Stock)
Inventory Models  3 Models with Deterministic Demand Model 1: Regular EOQ Model Model 2: EOQ with Backorder Model 3: EPQ with Production  2 Models with.
Chapter 5 Inventory Control Subject to Uncertain Demand
Graduate Program in Business Information Systems Inventory Decisions with Certain Factors Aslı Sencer.
Operations Management
1 Managing Flow Variability: Safety Inventory Operations Management Session 23: Newsvendor Model.
ISEN 315 Spring 2011 Dr. Gary Gaukler. EOQ Discussion 1. Demand is fixed at  units per unit time. 2. Shortages are not allowed. 3. Orders are received.
Presentation transcript:

Graduate Program in Business Information Systems Inventory Decisions with Uncertain Factors Aslı Sencer

BIS 517- Aslı Sencer2 Uncertainties in real life Demand is usually uncertain. Probability distributions are used to represent uncertain factors. Ex: Demand is normally distributed OR Demand is either 20,30,40 with respective probabilities 0.2, 0.5, 0.3.

BIS 517- Aslı Sencer3 Stochastic versus Deterministic Models Mathematical models involving probability are referred to as stochastic models. Deterministic models are limited in scope since they do not involve uncertain factors. But they are used to develop insight! Stochastic models are based on expected values, i.e. the long run average of all possible outcomes!

BIS 517- Aslı Sencer4 Example: Drugstore A drugstore stocks Fortunes.They sell each for $3 and unit cost is $2.10. Unsold copies are returned for $.70 credit. There are four levels of demand possible. How many copies of Fortune should be stocked in October? Payoff Table: Demand EventProbability ACTS Q = 20Q = 21Q = 22Q = 23 D = 20.2$18.00$16.60$15.20$13.80 D = D = D =

BIS 517- Aslı Sencer5 Solution: The expected payoffs are computed for each possible order quantity: Q = 20Q = 21Q = 22Q = 23 $18.00$18.44$17.90$16.79 Optimal stocking level, Q*=21 at an optimal expected profit of $18.44 If the probabilities were long-run frequencies, then doing so would maximize long-run profit.

BIS 517- Aslı Sencer6 Example: Drugstore Payoff Table (Figure 16-1)

BIS 517- Aslı Sencer7 Single-Period Inventory Decision: The Newsvendor Problem Single period problem (periodic review) Demand is uncertain (stochastic) No fixed ordering cost Instead of h ($/$/period) we have h E ($/unit/period=ch) Instead of p ($/unit) we have p S and p R -c Q: Order Quantity (decision variable) D: Demand Quantity Costs: c = Unit procurement cost h E = Additional cost of each item held at end of inventory cycle = unit inventory holding cost-salvage value to the supplier p S = Penalty for each item short (loss of customer goodwill) p R = Selling price

BIS 517- Aslı Sencer8 Modeling the Newsvendor Problem The objective is to minimize total expected cost, which can be simplified as: where is the expected demand.

BIS 517- Aslı Sencer9 Optimal order quantity of the Newsboy Problem Q* is the smallest possible demand such that

BIS 517- Aslı Sencer10 Example: Newsboy Problem A newsvendor sells Wall Street Journals. She loses p S = $.02 in future profits each time a customer wants to buy a paper when out of stock. They sell for p R = $.23 and cost c = $.20. Unsold copies cost h E = $.01 to dispose. Demands between 45 and 55 are equally likely. How many should she stock?

BIS 517- Aslı Sencer11 Example: Solution Discrete Uniform Distribution Demand is either 45,46,47,..., 55 each with a probability of 1/11. P(D<=Q*)=0.2Q*=47 units.

12 Newsvendor Problem (Figure 16-3) BIS 517- Aslı Sencer

13 Multiperiod Inventory Policies When demand is uncertain, multiperiod inventory might look like this over time.

BIS 517- Aslı Sencer14 Multiperiod Inventory Policies The multiperiod decisions involve two variables: Order quantity Q Reorder point r The following parameters apply: A = mean annual demand rate k = ordering cost c = unit procurement cost p s = cost of short item (no matter how long) h = annual holding cost per dollar value = mean lead-time demand

BIS 517- Aslı Sencer15 Multiperiod Inventory Policies: Discrete Lead-Time Demand The following is used to compute the expected shortage per inventory cycle: The following is used to compute the total annual expected cost:

BIS 517- Aslı Sencer16 Multiperiod Inventory Policies: Discrete Lead-Time Demand Solution Algorithm. Calculate the starting order quantity: Determine the reorder point r*: Determine optimal order quantity: This procedure continues –using the last Q to obtain r and r to obtain the next Q- until no values change.

BIS 517- Aslı Sencer17 Example: Annual demand for printer cartridges costing c = $1.50 is A = 1,500. Ordering cost is k = $5 and holding cost is $.12 per dollar per year. Shortage cost is p S = $.12, no matter how long. Lead-time demand has the following distribution. Find the optimal inventory policy.

BIS 517- Aslı Sencer18 Example: Solution The starting order quantity is: r* = 7 cartridges. B(7) = (8–7)(.03) + (9–7)(.01) + (10–7)(.01)=.08 and the optimal order quantity is:

BIS 517- Aslı Sencer19 Example: Solution (contd.) Q=290 leads to r=7, so the solution is optimal. The optimal inventory policy is: r* = 7 Q* = 290 Optimal annual expected cost is:

20 Multiperiod Discrete Backordering Iteration 1 BIS 517- Aslı Sencer

21 Multiperiod Discrete Backordering Iteration 10 BIS 517- Aslı Sencer

22 Multiperiod Discrete Backordering Summary BIS 517- Aslı Sencer