ICAS Alarm Upgrade ICAS Alarm Upgrade Project

Slides:



Advertisements
Similar presentations
Basic Concepts of a Computer Network
Advertisements

Tangent Sterilizer PC Interface System Description System Architecture System Pricing.
HARPER CHALICE GROUP LIMITED Leading manufacturers and suppliers of Electronic and Electrified “Perimeter Intrusion Detection systems” PulseSecure™ PROTECTOR.
 UK Power Networks. All rights reserved Distribution Network Visibility Low Carbon Networks Fund Tier 1 project UK Power Networks & PPA Energy Omer.
Confidential and Proprietary May 7, 2015 Real-Time Data Where You Can Use It.
What can QCI do for you? Shawn Stevenson Don Weirens.
MET ONE 7000 Series Remote Airborne Particle Counters Customer Name Date Presenter Presenter Title.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
April 2004 page 1 Confidential and propietary CentraLine Portfolio c l o s e t o y o u.
GUARD PATROL Sales Presentation. GUARD PATROL Collect data of security personnel patrols’ completion Real time tracking Various reporting options: patrols,
Use of Thin Clients in an Industrial Environment Foxboro Southeast User’s Group Birmingham, Al February 10-11, 2009 Walter Conner Senior Plant Engineer.
GeneXpert Installation and Xpert MTB/RIF Set-up
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Capacity Manager.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
11955 Exit Five Parkway Building 3 Fishers, IN Cross Platform IP Video Security Software and Systems Exacq Technologies.
Duties of a system administrator. A system administrator's responsibilities typically include:
SCADA and Telemetry Presented By:.
NetVuze Precision Network Meter standalone, easy to use, networked with data logging.
Berliner Elektronenspeicherringgesellschaft für Synchrotronstrahlung mbH (BESSY) Accelerator and Experiment Control and Monitor Systems Ralph Lange BESSY,
1 PAC530 | Output Controller. 2 The Output Controller (PAC530) provides the local connection on an RS-485 network between an Access and Alarm Server (PAC500)
High Sensitivity Smoke Detection
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
Unit 8b Troubleshooting; Maintenance and Upgrades; Interaction with Vendors, Developers, and Users Component 8 Installation and Maintenance of Health IT.
Unit 5 CONTROL CENTERS AND POWER SYSTEM SECURITY.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
E.Soundararajan R.Baskaran & M.Sai Baba Indira Gandhi Centre for Atomic Research, Kalpakkam.
Dry Storage & Battery Charging Monitoring & Control System.
James R. Cash SCADA System. Main Functions Acquire remote data Permit centralized control of pipeline Keep historical record of operation Provide automated.
The D50 Is a state of the art environmental monitor using only the best quality components available. It offers multiple sensors in a single unit with.
Software Innovations UK Ltd. systemhound PC inventory software.
A Capstone Project for NT2799, ITT Technical Institute
Software Innovations UK Ltd. systemhound PC inventory software.
Product Overview Presentation Issue 1.0 9/4/07 External distribution MKT-SD-P-001E.
PYRESCOM - Mas des Tilleuls Canohès -FRANCE Tél. : +33 (0)4. 68
STATUS OF TELECOMMUNICATIONS SYSTEM AND O&M PRACTICES IN ELECTRIC POWER INDUSTRY OF SERBIA (EPS) Danilo Lalović, Senior Engineer for Telecommunications.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Photo size is: Versatronic
WIRELESS FIRE DETECTION
CompTIA Network+ N Authorized Cert Guide
SCADA SCADA TRAINING AJAY K BASU
VARLOGIC NRC12 Varmetric Controller
Automation Technologies SCADA SENSORS HMI
ETS Inside Product Launch
COSEC ARC IP based Access Control Panel.
Maintain, Manage And Monitor Outdoor Systems Remotely
Network Video Switching Control System Presentation
NWU IT-ES/NWU IT-ELD Monitoring systems
Enterprise Wireless Solutions
CV PVSS project architecture
DT80 range Modbus capability
How SCADA Systems Work?.
CP220x The Industry’s Smallest Ethernet Controller
What can be procured through SEWP V?
Peter Erning, PSP-T11, Power Gen 2010
Wavestore Integrates… OptaSense Acoustic Fibre & PIDS
Networks Software.
SCADA Communication and Architecture Principles
Selling IIoT Solutions to Systems Integrators
Process Monitoring and Control Systems
Rapid Automation Design
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Radoslaw Jedynak, PhD Poland, Technical University of Radom
ALL-ELECTRIC TEMPERATURE CONTROL FOR CHILLED, FROZEN AND
EIDE System Requirements and Specification Documents
Cyber Security of SCADA Systems Remote Terminal Units (RTU)
169 South Main Street, New City, NY 10956
CLASSROOM PROJECTION SYSTEM
Measurement 2 Measurement 3 Condition Monitoring Integration with Embedded Software and On Key Hardware’s embedded software/analysis tool and specialist.
Networking and Telecommunications
Presentation transcript:

ICAS Alarm Upgrade ICAS Alarm Upgrade Project Against fierce competition, Cetix has been awarded a turnkey contract to a value in excess of £245,000 to supply an Independent Critical Alarm System (ICAS) to one of our large clients. The ICAS system is a standalone network of sensors, monitoring points and alarms. The system monitors defined operating parameters within high containment laboratories located in the main building. The ICAS system monitors and provides alerts when conditions are outside normal operating parameters in high containment laboratories. The system initially monitors laboratory room air pressures (differential pressure, laboratory to corridor), freezer temperatures and O2 depletion. The system raises alarms when the specified conditions are above or below normal operating conditions. The project includes the following : - Project Management Initial site survey to confirm requirements Supply, install, commission and connect to the ICAS additional O2 Depletion Monitors in several laboratories Connect to Formaldehyde Monitors in various locations Design, supply, install and commission wall mounted Remote Terminal Units (RTUs) to interface via WAGO remote I/O to the above monitors and connect to the site fibre optic ICAS network Visual and audible annunciation of alarms Upgrade the existing Wonderware InTouch SCADA hardware to a hot standby configuration to provide improved availability Upgrade the existing Wonderware InTouch SCADA software licenses to the latest version and Operating System for futureproofing Configuration of InTouch SCADA screen mimics and polling data from WAGO I/O New SCADA client HMI located at the Security Gatehouse with UPS Installation and commissioning including all data, communications and power cabling with necessary cable containment Administrator, operator and maintenance training Full in house, FAT and Site Testing Full documentation provision Air tight sealing of all penetrations made during installation Calibration of O2 Monitors during commissioning Provision of site establishment including storage for materials, office space and fencing Cetix is responsible for designing and configuring the complete system, including configuring the InTouch ICAS SCADA system. The system is fully tested at our works using I/O simulation before being demonstrated to PHE at a final FAT prior to its shipment to site. The tests are agreed in a comprehensive Test Specification. The system has been designed to allow easy and low cost expansion in the future allowing additional assets to be integrated into the system.