Monitoring programs and projects

Slides:



Advertisements
Similar presentations
Introduction to Monitoring and Evaluation
Advertisements

Donald T. Simeon Caribbean Health Research Council
Results-Based Management: Logical Framework Approach
RBM in the context of Operations and Programme and Project Management Material of the Technical Assistance Unit (TAU)
Results-Based Management: Logical Framework Approach
An initiative of the ACP Group of States funded by the European Union Global Climate Change Alliance: Intra-ACP Programme Training Module Mainstreaming.
Participants should expect to understand: Concept of M&E Importance of gender in M&E Different steps in the M&E process Integrating gender into program/project.
CASE STUDIES IN PROJECT MANAGEMENT
Proposal Writing for Competitive Grant Systems
CONCEPT PAPER RESULT BASED PLANNING. RESULT-ORIENTED PLANNING Overall Objective/ Goal Specific Objective/ Purposes Expected Result/ Output Activities.
This project is funded by the EUAnd implemented by a consortium led by MWH Logical Framework and Indicators.
The role of assumptions
IPA Funds Programme Management sept Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına.
Project design & Planning The Logical Framework Approach An Over View Icelandic International Development Agency (ICEIDA) Iceland United Nations University.
KEYWORDS REFRESHMENT. Activities: in the context of the Logframe Matrix, these are the actions (tasks) that have to be taken to produce results Analysis.
Module 9 Mainstreaming in country monitoring systems Country-led environmental and climate change mainstreaming (specialist course) Training materials.
SUB-MODULE 5. MEANS OF VERIFICATION RESULTS BASED LOGICAL FRAMEWORK TRAINING Quality Assurance and Results Department (ORQR.2)
SESSION 3: FROM SETTING PRIORITIES TO PROGRAMMING FOR RESULTS.
SUB-MODULE 1. INTRODUCTION TO THE RESULTS BASED LOGICAL FRAMEWORK RESULTS BASED LOG-FRAME TRAINING Quality Assurance and Results Department (ORQR.2 )
PREPARING FOR MONITORING AND EVALUATION 27 – 31 May 2013 Bangkok Bangkok Office Asia and Pacific Regional Bureau for Education United Nations Educational,
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
27/04/2017 Strengthening of the Monitoring and Evaluation system for FTPP/FTTP in FAO /SEC December 2015 FTPP/FTFP Workshop, Bishkek, Kyrgyzstan.
Logical Framework Approach 1. Approaches to Activity Design Logical Framework Approach (LFA) – Originally developed in the 1970s, this planning process.
The Logical Framework (Log Frame). Programs & Projects Programs Broad areas of work required to implement policy decisions. Usually focused on a sector.
S3.1 session day 5 2 Programme management download resources from Approved by the Advisory Group: Programme management Programme and project.
P3 Business Analysis. 2 Section F: Project Management F1.The nature of projects F2. Building the Business Case F4. Planning,monitoring and controlling.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Module 8 Guidelines for evaluating the SDGs through an equity focused and gender responsive lens: Overview Technical Assistance on Evaluating SDGs: Leave.
Introduction and Overview
Working with Logic Models
Building an ENI CBC project
Project Management PTM721S
Monitoring & Evaluation and Impact Assessment of Project
Project monitoring and evaluation
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 3. Session 9. Periodic data collection methods.
Monitoring and Evaluation
Translating ideas into proposals for action programmes
Project Management and Monitoring & Evaluation
Session 1 – Study Objectives
Monitoring and Evaluation Systems for NARS Organisations in Papua New Guinea Day 2. Session 6. Developing indicators.
Strategic Planning for Learning Organizations
Assessing Trust Fund Performance
Introduction and Overview
منهج الإطار المنطقي وإطار الرصد والتقييم وإطار النتائج
Monitoring and Evaluation for Poverty Reduction
Logical framework Approach (LFA)
Evaluation in the GEF and Training Module on Terminal Evaluations
Session 9 Recap on LFM and IL.
PROJECT DOCUMENTATION
Monitoring and Evaluation
Monitoring programs and projects Using Results Framework
Helene Skikos DG Education and Culture
CATHCA National Conference 2018
Albania 2021 Population and Housing Census - Plans
Describe result frameworks
Translating ideas into proposals for action programmes
Results Based Management for Monitoring & Evaluation
Results Based Management for Monitoring & Evaluation
Translating ideas into proposals for action programmes
Appraising result framework
Monitoring programs and projects Using Results Framework
Translating ideas into proposals for action programmes
Appraising result framework
Appraising result framework
Integrating Gender into Rural Development M&E in Projects and Programs
Data for PRS Monitoring: Institutional and Technical Challenges
Appraising result framework
How is an M & E framework derived from the logframe?
Appraising result framework
M & E Plans and Frameworks
Presentation transcript:

Monitoring programs and projects Professional Course on Management and Development Tara Prasad Kharel

Learning Objectives Describe result frameworks Apply monitoring frameworks for programmes and projects

Content Outline Result frameworks in programme and projects Frameworks for monitoring and evaluation Issues and challenges

Policy, Plan, Program, Project

Concept of Monitoring Systematic process of collection, recording and analysis of information, and necessary actions - corrections and adjustments. Continuous or periodic review and surveillance of an activity/project/program to ensure that input deliveries, work schedules, targeted outputs and other required actions are proceeding according to plan

What is monitoring? Day-to-day follow up of activities during implementation to measure progress and identify deviations Routine follow up to ensure activities are proceeding as planned and are on schedule Routine assessment of activities and results Answers the question, “what are we doing?” Monitoring is an integral part of every project, from start to finish.

Who? Internal agency: the project staff - self assessment and timely correction of the deviation External agency (or funding agency) - as a follow-up activity

Monitoring Cycle Collection of information Processing of information Analysis of information Inferences Action Collection Processing Analysis Inferences Action Monitoring

Types of Monitoring Input monitoring Output monitoring Performance monitoring Process monitoring Sustainability monitoring

Why monitoring? To identify the project/program problems: suggest the areas of correction To avoid time over-run problems: complete works within the specified time period To avoid cost over-run problems: complete project in specified budget To Achieve Result – Recent Trend

Results Framework Logical frameworks; logical models; theories of change; results chain; outcome mapping Logical/cause and effect relationship between inputs, outputs, outcomes and impact – project, program, or development strategy

How Result Frameworks Works? Project Impact Project Outcome Project Output Project Activity Project Input Country Outcome Sector Outcome Regional/Global Goals Collective Accountability More Less

Elements of Results Framework Goal/impact/target: the highest or ultimate objective Purpose/outcome: immediate benefit from the project Output: measurable outcomes to be achieved Activities: actions required to get outputs Input: resources to undertake activities/implementation plan Monitoring arrangements: set of indicators and results to track progress; baseline, daily, weekly, monthly, annual and final targets; roles and responsibilities for collecting, reporting, and analyzing data

What should a M&E System Measure? The Results Chain Indicative Example: Access to, use of, and satisfaction with services Effects on dimensions of well-being Goods and services produced Tasks undertaken to transform inputs to outputs Financial, human and material resources Outcomes Impact Outputs Activities Inputs Reduced or No bus accidents Improved Road Condition, Completion of Training etc Road Maintenance, Driver Training, Procurement of Bus Spending on Road, Training and Bus Decreased or no casualty Source: Adapted from ADB (2006) Introduction to Results Management, p. 7 World Bank (2001) PRSP Sourcebook, p. 108.

Group Work Discuss and Identify Output, Outcome and Goal in the given project and share in plenary. P1: Nepal: Melamchi Water Supply Project and Kathmandu Valley Water Services Sector Development Program P2: Nepal: Preparing the Information and Communications Technology (ICT) Development Project P3: Sri Lanka: Proposed National Highways Sector Project P4: Nepal: Earthquake Emergency Assistance Project Time: Discussion – 10 minutes Share in plenary – 3 minutes each group.

Key Questions Regarding M and E Indicators for the Project

Goal/Impact To what extent will/has the project contribute(d) towards its longer term goals? Why or why not? What unanticipated positive or negative consequences will/did the project have? Why will/did they arise?

Purpose/Outcome What changes will/have occur(red) as a result of the outputs and to what extent are these likely to contribute towards the project purpose and desired impact? Will/Has the project achieve(d) the changes for which it can realistically be held accountable?

Outputs What direct tangible products or services will/has the project deliver(ed) as a result of activities?

Activities Will/Have planned activities be(en) completed on time and within the budget? What unplanned activities have been completed and what planned activities have not been completed?

Inputs Will/Are the resources be(ing) used efficiently?

M & E steps Setting of monitoring and evaluation objective(s) Selection of the monitoring and evaluation indicator(s) Selection of the module(s) if necessary Selection of frequency or periodicity Identification of monitor or evaluator Identification of sources of information: primary or secondary

LOGICAL FRAMEWORK MATRIX Objective Hierarchy (Narrative Summary) Verifiable Performance outcomes and Indicators (OVI & targets) Means of Monitoring Mechanism (MOV & sources of information) Important Assumptions and risks GOAL Overall development goal-long term objective Performance questions and indicators at goal level: impact How necessary information will be gathered Long term sustainability of the project PURPSE Project development objective-immediate objective Lower level impact   Assumptions in moving from purpose to goal OUTPUTS The product/service Indicators of outputs ACTIVITIES The actions Inputs Necessary inputs

M & E indicators are Variables to measure changes Markers of progress Parameters which details the extent to which a project objective has been achieved within a given time frame Used to measure efficiency and effectiveness of the ongoing or completed activities

Dimensions of Indicators Physical Financial Quality Time

Basic features of the indicators Objective Relevant Sensitive Specific Independent Precise

Means of verification The sources of data necessary to verify status of goal, purpose, output and activity level indicators Activity/input level: project records Output level: records Purpose level: records and survey Goal level: survey and secondary sources

Indicator Matrix/M & E Tool DEFINITION How is it calculated? BASELINE What is the current value? TARGET What is the target value? DATA SOURCE How will it be measured? FREQUENCY How often will it be measured? RESPONSIBLE Who will measure it? REPORTING Where will it be reported? G1   OC1 OC2 OP1 OP2 Data analysis/data quality

Data collection Tools and Techniques Case study Checklist Close/open-ended (structured/semi-structured) interview Direct observation FGD KII Survey/census Questionnaire Written document review Statistical data review

Issues and challenges Budget Allocation Human Resources Political / Administrative will Technical Assistance Data and information Coordination / cooperation between line agencies Access

Thank You