Similar presentations
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Advertisements

Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
GRI NW Investment Workshop Chris Logue, European Policy Manager, 4 th June 2010 The Hague.
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Entry and Exit Investment Process Outline Transmission Planning Code Workshop 3 5 th June.
Baseline Reconsultation Timeline Timeline (1) Aug SepOctNov Dec 14/8 Workshop 1: History & Timeline 17/8 Workshop 2: Methodology Brainstorm.
Incremental Entry Capacity Release Methodology Statement Review 2005 Transmission Workstream - 15th June 2005.
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
LTSEC summer auction Transmission Workstream 6 th April 2006 Dave Adlam, National Grid NTS.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Capacity Methodology Statements Transmission Workstream 5 th July 2007.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Entry Capacity Substitution: Discussion Document Transmission Workstream 7 th August 2008 Initial Analysis of Responses.
Proposal to adjust investment lead times Transmission Workstream 4 th May 2006.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Initial Thoughts on Timeline for Entry Capacity Substitution Draft for discussion purposes only.
The Entry Capacity Substitution Regime Transmission Workstream 7 th February 2008 Thoughts for discussion.
Transitional Exit Capacity Proposals -Update Transmission Workstream, 1 Dec Nov 05.
Transmission Workstream 6 January 2011
Transitional Exit Capacity Proposals -Update
Exit Capacity Release Methodology Statement
Transmission Planning Code – Draft Document
Code Governance Review UNC Modification Proposals
Transmission Planning Code
Transmission Workgroup 4th October 2012
PARCA Timeline Transmission Workgroup 4th July 2013 Rhys Ashman.
UNC Trader User – Licence obligations
Entry Capacity - update
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
Capacity Methodology Statements
April May April May June July July June August Sept August
Annual Review - Methodology Statements
Exit Capacity Substitution and Revision
Update on Exit Capacity Substitution and Revision
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Transmission Planning Code Review
QSEC auction timetable
Entry Capacity Substitution
PARCA Timeline.
The Treatment of “Spare / Sterilised” Capacity
Gas Customer Forum DN Interruption Update - Introduction
Transmission Workstream – 6th July 2005
Generic Revenue Driver Methodology
Transmission Workstream 1st February 2007
Review: Entry Capacity Transfer and Trade Methodology Statement
Transmission Workgroup July 2012
IECR Incremental Step Size
Review Group 221: Review of Questions from Session 2
Modification 0043 – Limitation on offering for sale unsold capacity
Transmission Workstream 4th December 2008
Gas Customer Forum 28 July 2008
Presentation transcript:

Incremental Entry Capacity Release Methodology Statement Update to Transmission Workstream 1st May 2008

Licence Obligation National Grid is required to submit its proposed IECR to the Authority for approval before 1st July in each formula year. Following a review of the methodology; and Following industry consultation. Proposals are implemented upon approval or after 2 months if the Authority has not directed otherwise.

Approximate Timeline for Review of the IECR 20th June Consultation report send to Ofgem. Mid-Sept 08 QSEC auction commences 16th May Consultation commences 13th June Consultation ends Early July Notice of QSEC charges 20th August Deadline for Ofgem veto Industry comments to NG Approximate Timeline

Key Changes. No fundamental changes proposed; but Extensive updating to improve clarity and to ensure consistency with revised Licence terminology and incentives References to Entry Capacity Substitution updated Dependant upon the development of capacity substitution processes further revision to the IECR may be necessary Role of the Authority To update the Licence for new ASEP In approval of National Grid’s proposals to release incremental obligated entry capacity