‘New stations’ generic Layout Preliminary, NDRC or MSRC?

Slides:



Advertisements
Similar presentations
Small cryotrap – control rack Nov Piano temporale Mid Jan: RR Begin Feb:order of the cryostat May:cryostat on site, rack ready.
Advertisements

ILIAS WG1 meeting - Birmingham1 Cryogenic Trap Vs Brewster window & noise coupling through windows J. Marque.
UHV gate valve Readiness Review 20Sept2012. Notes/remarks/proposals 1) with standard configuration, seems hard to keep cold the actuator? ( VAT) 2) position.
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Pipes Single Wall Pipes Double Wall Pipes
2035 Series. Common Components The design of the 2035 Series valve includes many proven components for assured reliability. These items include: –Same.
Vac meeting 08 Oct 08 Agenda 1. needed operations for towers displacements (Frederic R.) final comments on the 2m bottom not accessible anymore 2. Larger.
MICE Hydrogen System Implementation Tom Bradshaw Elwyn Baynham Iouri Ivaniouchenkov Jim Rochford.
Proportional Technology Precise Control of Pressure and Flow.
VAC - Ctrl System 04Nov2011. Some points to be discussed Give support for the cryogenic control system prepared by Nikhef team for Cryotrap (and Genova.
SINGLE-PHASE HOPPER LOADERS ENG. FEEDING SINGLE-PHASE FEEDER 2.
Hydronic Mechanical Controls
VAC – CTRL SYS 8 Feb VAC : MSRC equipment Central area links, to be discussed Ion Tmp aux.
30/05-03/06/2007 LCWS2007 and ILC2007, DESY Hamburg Germany Vacuum System Specifications What needs to be specified in Vacuum Specification for ICL Damping.
BOILER PLANT OPERATION Presented By Mr. Sivanand Ray
NFPA 31 Standard for the installation of Oil- Burning Equipment
1 VAC – Vacuum system modifications Cascina, 03Nov08 A.Pasqualetti for the VAC contributors.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina, January 21,
Stephen Schuh Vacuum Controls Hardware 27 February 2006 LCLS Vacuum Controls Hardware Meeting 27 February 2006.
AdV VAC design meeting Cascina, 19 July Agenda first discussion about vacuum design of central area - and pickoff chamber design in particular -
AdV Vacuum system changes, 04Mar2010, NDRC option Preliminary Cryotrap_NI Link or tube? Cryotrap_NE Link Cryopump SR? Cryopump PR? Zeolites/27K/77K (or.
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
AdV VAC CTRL SYS Paris, 22 Mar Proposed Agenda - Morning (9h30 to 12h) part I general status of ctrl system activity
MICE Hydrogen Control System MICE Collaboration Meeting CM33 27 th July 2012 PJ Warburton – STFC Daresbury Lab.
Vacuum system.
Vacuum / cryo links Mechanical design issues Jo van den Brand, Martin Doets Nikhef Cascina March 4,
F. Mazzolini Vacuum Systems for Synchrotron Light Sources Barcelona, September 12– Front-end vacuum system F.Mazzolini.
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Vacuum Technology, 12 th and 13 th September 2005 L. Schulz Introduction Pumps.
AdV-VAC meeting 21Apr’09 Agenda 1) results from the reviews (A.Pasqualetti) 2) present wbs, present project planning, baseline design (A.Pasqualetti) 3)
Center for the Advancement of Natural Discoveries using Light Emission Vacuum system for the AREAL linear accelerator Vacuum Systems A.Gevorgyan.
AdV- VAC CTRL SYS/Cryo Interface 06Feb2013. Cryotrap cryogenics (simplified sketch) = the ‘electronic’ equipment needed to read LN2 level, temperature,
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
AdV Vacuum system changes, 23Feb2011 Central area vacuum equipment SVC 2 (mini) towers 1 new HV tower (Inj) DT,IB from HV->UHV towers (with additional.
Booster and Collider SC magnets. Design & prototyping of UHV and cryostat systems for Booster and Collider A.Smirnov JINR, Dubna, Russia NICA Machine Advisory.
CUE – Make Any Pump an E-Pump
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout preliminary Cryotrap_NICryotrap_NE Cryotrap_WI Cryotrap_WE Cryotrap_DT ? Cryotrap_IB ?
Installation of the T600 at Fermilab CSN2, September 22,
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
Exit REMOTE POWER SYSTEM ”Turning your copper into gold”
1 IPN Orsay / Division Accélérateurs The Spoke cryomodule Vacuum aspects P. DUTHIL on behalf of the IPNO team ESS Lund February 19 th 2013.
Paolo Michelato, July 19-22, 2006 Global Design Effort 1 Vacuum system segmentation Cold vacuum system segmentation reflects the cryogenic structure of.
18 MW TURBINE CONTROL PANEL
Vacuum Considerations on ESS-DTL Carlo Roncolato 06/09/2012 Istituto Nazionale Fisica Nucleare Laboratori Nazionali di Legnaro.
01/09/ KTAG 5/8 sectors equipped DCS system in pogress DAQ commissioning in progress Test pressure scan this week (t.b.c) 01/09/20142.
APPLICATIONS Designed and manufactured to meet the needs for constant pressure required by modern plumbing systems, such as : Domestic applications and.
Installation of the T600 at Fermilab
HYDRAULIC & PNEUMATIC CIRCUITS
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
IT-4189 Supply and installation of a cryogenic distribution system
Sub-system integration for the VBOX
Proximity Cryogenics P&IDs meeting
Professor Robert L. Heider, PE
Tracker cooling loop “check out” draft for discussion
Recent developments in the Vacuum Control Software
1 Connect pumping equipment (group) with leak detector to insulation vacuum 1 or 2 pumping groups? connected to SB or CM or both? Which pumping group?
Martin Dommach TDR ART Review, Hamburg, September 14, 2012
Test box for ProtoDUNE SP – Integration Test
Effective Methods to Test the Fuel Pressure Regulator in your Car.
Advanced Virgo – Nikhef tasks
1MB/sec streaming data out 32 data lines in 4 RS-232 ports Cryopanel
Plasma Cleaning Safety Presentation
AdV - Internal Review of VAC subsystem
Periodical meeting about the 'control system ‘
Cryogenics – The Basics
Vacuum Control System for Monolith Vacuum
Presentation transcript:

‘New stations’ generic Layout Preliminary, NDRC or MSRC? AdV Vacuum system changes, Feb2010 ‘New stations’ generic Layout Preliminary, NDRC or MSRC? Cryotrap_WE 300mW Cryotrap_WI Ions Ions Ions Cryotrap_NI Cryotrap_NE 300mN Turbo_PR Ions Cryotrap_IB ? Turbo_SR Cryotrap_DT ? Ions Remote_scroll

‘NDRC option b’ Layout Preliminary AdV Vacuum system changes, Feb2010 Cryotrap_WE 300mW Cryotrap_WI Ions DN? Ions DN? Ions DN? Cryotrap_NI Cryotrap_NE 300mN Cryopump PR? Ions As a difference with respect to the present layout, the Link Valves shall close automatically to protect the vacuum level reached inside tubes/towers (active safety loops) _PR suspension can be dismounted? If not... _ bench towers height /gas load shall increase, difficult to use ‘helicoflex’ - traps Cryopump SR? Ions DN? Remote_scroll

Station Turbo_PR or Turbo_SR, preliminary Tower links Automatic valve with position indicator Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters PE 2 gauges, to be purchased, normally same to the ones we have, but not necessarily PI Automatic valve with position indicator To the remote scrolls

Ions, preliminary Could be grouped near IB, DT, MC and also distributed (An option is to remove one TSP pump (P32) and put one Ion pump on that port). In alternative two additional Ion groups could be installed on two links, for instance near BS. Tower links Manual valve with position indicator 2 Ion pumps, 1 controller , for instance Varian starcell 500 + DUAL per pompe ioniche: RS232 RS422 RS485 ETERNET PE 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily PI manual valve with position indicator

Centralized scrolls, preliminary TowerIB TowerPR TowerBS TowerWI TowerSR TowerNI TowerDT ? In parallel to V91, tbc Automatic valves with position indicator PI 3 PI gauges, to be purchased, normally same to the ones we have, but not necessarily PI PI Scrolls, to be purchased, could have rs232

Cryotraps_DT/IB or Cryopumps_SR/PR, preliminary To be defined

Cryotraps 1of2, preliminary RGA PI PE Cryotraps 1of2, preliminary New or from 0m/3000m? Not from NI/NE... Manual valve with position indicator existing large valve, to be linked to the control Automatic valve with position indicator Large valve / tower link Automatic valve with position indicator Manual valve 200CF with position indicator Turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters 2 TSP pumps PE PE 2 gauges 2 gauges to be purchased, normally same to the ones we have, but not necessarily PI Manual valve with position indicator Manual valve with position indicator manual valve with position indicator vent Automatic valve with position indicator 2 systems like this one per each trap Local scroll and also remote scroll? PI

Cryotraps 2of2, preliminary Cryotraps 2of2, preliminary. Cryogenic controls, pid for level control and external tank Pressure 1 Some temp readouts to be acquired. The controller will have relays to close also valves in case of high temp alarms Temperature Automatic valve to be linked to the temp control existing large valve, to be linked to the temp control Pressure signals (2) , normally 4-20mA, to be recorded Pressure 2 PID level regulator to be read by remote, normally with a few low level output or rs232 or other. Could retransmit the level and valve status Level 1 External Tank LN2 Electronics driver to be read by remote, normally with a few low level output or rs232 or other PID Electronics driver to be read (tbc) by remote, normally with a few low level output or rs232 or other Level 2 Comments: add readouts of LN2 tanks pressures Automatic proportional valve, with position indicator, tbc

Double oring on bottom flanges. From the point of view of control system, it is one additional gauge per tower (pirani) PI CF16, to be metal sealed in case of helicofles Double orings on end tower viewports too

300m N and W, preliminary PE PI 3km tube, 300m from input Manual valve with position indicator, existing PE 2 TSP pumps, 2 controllers. 2 gauges, (PI+PE) to be purchased, normally same to the ones we have, but not necessarily PI manual valve with position indicator

Turbo-booster at the existing tube stations 0m, 600m, ... (preliminary) 3km tube station 0, 600, ... Existing turbo pumping group V21, V22 , P21, P22, G21, G22 Smaller turbo, to be purchased, normally with controller on board, rs232 necessary to visualize parameters PI To the scroll

Other changes (preliminary): Link valves remote operation more reliable Monitor compressed air level at tube stations Monitor ups status at tube stations, tbc poimettere su file xls Integrate RGAs? Normally not convenient, but currently use remotizers/rs485 and data storage is not well organized