Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

Alice ITS L5,6 Integration 1 End wheels and local services design – services layout on the end wheels: patch panels, routing, cooling and qualification.
General Information Dimensions · Structure Width: ~ 197in. (16.4’), 99in. (8.2’)/car · Slope Angle: 5 degree · Structure Height (Front): 100in. + base.
1 Transportation Model. 2 Basic Problem The basic idea in a transportation problem is that there are sites or sources of product that need to be shipped.
RockOn! Canister Integration RockOn! 2009.
Click on this image to open the full PDF document.
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
CMS ZDC Crane Emergency Payload Removal Procedures This document proposes the viability of using a portable hydraulic actuator Hand crane (Davit crane)
Far Detector Assembly Block Pivot Table Design Review WBS Dave Pushka April 2 nd 2008.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
GLAST LAT ProjectLAT Mgr’s Meeting November 17, LAT Planning Meeting Mechanical/Thermal Systems November 2004 Marc Campell.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review 2005 IR-2 Installation Discussion H.J. Krebs October 22, 2003.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing RPC Assembly Changguo Lu, Kirk McDonald, Bill Sands Princeton University (July 28, 2007)
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
May 5, 2004H.J. Krebs LST Installation Readiness Review Brass Absorber Production H.J. Krebs May 5, 2004.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
C. Bromberg 1 Michigan State University Feb. 8, 2004 RPC Monolithic Detector l Most absorber shipped direct to the site äShipping minimized äHeavy (~20.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
Advanced Results Processing Workshop 8. Training Manual Advanced Results Processing August 26, 2005 Inventory # WS8-2 Workshop 8 - Goals In this.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
Preliminary Detailed Design Review P15080 Flow Culture System November 13, 2014.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
The 2 reinforcement plates are made from a piece of 2” dia stainless tube. Read on for how this is done. 14.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
HCAL Mechanical Design Victor Guarino HEP-ANL. Work to date.. Have been thinking about how to construct individual modules and assemble them into a barrel.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
LARP Collaboration Meeting Racetrack Coil Fabrication
Fork and Pallet Design Hans Jostlein March 13, 2007.
MUON Project Overview Action Items from September meeting New Action Items Update to the List of Worries Update of plans for the next 6 months.
ATLAS ITk Upgrade: SLIM Update
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
BM&N STS ladders assembly in VLHEP
Planning for Proto-DUNE PD Installation and Cabling at CERN
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
QXF Coil Fabrication & Tooling Reaction / Impregnation
LBNF CAD models, Drawings and Component list
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
LARP Phase II Secondary Collimator RC1
nSW Alignment Installation
CPA Moment on the left is ~100*150kg/2.
ARISSat-1 Solar Panel Covers
WLS FIBER-SCINTILLATOR GLUING UPDATE
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Module Installation
Limited Streamer Tubes
RPC and LST at High Luminosity
LARP Phase II Secondary Collimator RC-1
XY Scanner Mount.
Limited Streamer Tube Project Summary
LCLS Vacuum System Plans (July 07)
Bunker Wall Design Wall ESS
JLAB CHL 2K COLD BOX REPLACEMENT
Presentation transcript:

Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating parts for the module assembly fixtures. Shipping and testing boxes are presently in an iterative design mode to determine the best and most cost effective way to proceed. Planning for testing and quality control is in progress. Installation procedures are being coordinated by SLAC and Princeton engineers. (information in this document is based on 9x8 double layer tubes)

Shown below is a footprint of the Princeton high bay area where tubes will be received and tested,after assembly the modules will be tested and stored here. Ohio State will have a similar facility.

This shows the Princeton Elementary Particles area where modules will be assembled and put into their testing and shipping boxes. Ohio State will build like assembly fixtures and have a similar set up.

The module assembly fixture is designed to assemble 10 different size modules for a total of 354 modules needed. Both Princeton and Ohio State will have 4 assembly fixtures for production. The fixtures are designed to pivot vertical for removal of the modules in their most rigid orientation. Presently design is done for 9x8 double layer tubes but the fixtures can be adapted to accommodate large single cell modules.

Below is a 3-D rendering of the assembly fixtures.

Below is a 5 module box which will receive 5 cartridge containing first tubes from Italy and then modules for testing and shipment.

Five module box with cartridge boxes inserted. With 5 cartridges inserted the box will weigh approximately 300 pounds.

Proposed design for source scan apparatus. Tubes and then modules will be scanned at Princeton and Ohio State. The source is motor driven on a 4m rail and is moved and pinned by hand to the center of each tube.

View of source holder and shutter

The graphic below represents a study done by Vito Casarriti on the vertical stiffness of modules. The results show that a minimum of 5 tubes is needed for the appropriate handling rigidity. Six tubes per module will be the standard for better utility routing.

Proposed Stiffening Rib A stainless steel rib to be inserted between the tubes that comprise a module will add rigidity to the module in the horizontal position. The module will still need to be handled in the vertical position but the ribs will add needed strength for installation and operation. Holes down the center of the rib do little to degrade the strength of the rib and it allows flow of epoxy from one tube to the next giving a better bond than only stainless to PVC.

Modules will be installed without corner plates or center plates in place but for replacement of a module the center plate must be removed on the horizontal sextants and one of the center plates must be removed on the side sextants corner plates remain installed.

This table is of the barrel layer openings provided by SLAC for RPC design. The sizes in millimeters represent the opening minus 5mm on each side.

This table is the actual production sizes of the barrel RPCs

Installation fixtures that will be used for brass installation and module installation are being drawn up at SLAC. Brass deflection problems are being considered at SLAC and Princeton. Ohio State and Princeton are working on quality control procedures for the tubes and modules at their respective sights. SLAC will also be implementing a quality control plan for the modules when they arrive at on sight.