Market Information Provision Initiative (MIPI) Phase 2

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Mod 0260 Post-Emergency Claims: Implementation Update Transmission Workstream - December 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod Publication of UK Wholesale Gas Market Liquidity Data Richard Fairholme E.ON UK Transmission Workstream, August 7 th 2008.
MIPI / RG140 Update Chris Shanley. Agenda  Review Group Background  MIPI Project - Background  RG140 Principles to be delivered via MIPI  Functionality.
NTS Update Gas Customer Forum 25 th September 2006.
Modification 500 slides for Workgroup
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Overview Gemini 2008 Release (Summer). Gemini Release 2008 (Summer) In response to a request from National Grid Transmission a number of changes have.
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
September 2008 QSEC auction - Allocations Transmission Workstream
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
DRSEC Update Transmission Workstream 06 November 2008.
Change Overview Board Change Horizon Quarterly Review 5 October 2015.
EU Phase 3 Customer communications
User Pays User Committee 12th November 2013
Transmission Workstream 6 January 2011
SGN Modification Proposal Amendments to UNC TPD OCS Process Long Term Allocation of Capacity for the Transitional Period.
6/3/2018 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Exit Capacity Release Methodology Statement
MIPI Changes October 2012.
EU Implementation Programme
Allocation of Capacity in Portugal Under the New Regulation
2009 TSO Transparency Gas Regional Initiative North-West
MIPI Energy – Daily Reports
CMP Transparency Requirements
Allocation of Capacity in Portugal Under the New Regulation
UNC Modification Proposal 0373
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
Capacity Methodology Statements
Publication of Historical Gas Operational Data by National Grid NTS
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
Richard Fairholme Transmission Workstream, 2nd October 2008
Exit Capacity Substitution and Revision
2/23/2019 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
Publication of Zonal Flex Data
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
Development of Firm Monitor & GBA
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
COR1072 Enduring Transfer and Trade Arrangements
Modification Proposal 0101 – “Amendment to demand forecasting timings in relation to the Gas Balancing Alert”
Transmission Planning Code Review
Long Term Non Firm Capacity Update
Meeting Friday 13th September 2013 Hayley Burden
UNC Transmission Workstream 7th December 2006
Publication of UK Wholesale Gas Market Liquidity Data TR 1099/1100
Richard Fairholme Transmission Workstream 4th September 2008
Mark Freeman 29th January 2007
Proposer: Debbie Brace Panel Date: 20th March 2014
Richard Fairholme E.ON UK
Transmission Workstream - EU 3rd Package Update
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
GRP Progress & Plans The GRP project was established to deliver an updated design utilising fully supported hardware and software for Gemini. GRP is replacing.
Stefan Leedham Transmission Workstream 2nd November 2006
Modification 598 update 13 January 2016.
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Gas Information Review Proposal UNC 0140
Data Enhancement Project - Update
Presentation transcript:

Market Information Provision Initiative (MIPI) Phase 2 Update March 2nd 2009

MIPI Phase 2 – Drivers Primary Driver Operational Stability. Data and functionality migration from the current systems started under the MIPI07 project, and will lead to the decommissioning of the legacy system. Secondary Drivers The project enables National Grid to meet its ongoing licence and UNC obligations: Robust platform for future changes related to the publication of market information and future regulatory requirements in the UK and Europe Enables National Grid to meet Information provision targets/incentives Support for legacy system is due to be withdrawn. MIPI Phase 2 sanctioned on the 26-02-3009 Current system IE3 system Legacy system is IE3

MIPI Phase 2 – Market driven and regulatory information provision initiatives Title Comments UNC Mod 195A National Grid needs to meet obligations under UNC MOD 195A. Some additional data needs to be published. NTS forecast system demand as a percentage of the peak 1 in 20 demand Flexibility data for each Day by Exit Zone NTS Line Pack data Shipper Information System (SIS) Data Publish SIS data items via MIPI instead of SIS UNC Modification Proposal 0219 Publication of UK Wholesale Gas Market Liquidity Data Quarterly DADSEC Auction Report Compile and publish a new report entitled “Day Ahead Daily System Entry Capacity – (DADSEC)”.

MIPI Phase 2 – Key Milestones Project Start – 10/03/08 Project Requirements Complete – 26/02/09 Design Complete – 20/05/09 Phased Implementation -1st Phase iGMS changes 3rd quarter 2009 2nd Phase MIPI changes 4th quarter 2009 Project closure – 31/12/09 Systems affected iGMS – Operational system IE3 - Information Exchange 3 Gemini SC2004 MIS SIS