Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

 Mod 380 is the long term solution for AQ  Consider options for an interim solution  Investigating 3 options  Analysis will tell us which are feasible.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
W3 Business Systems W3 Group, LLC SFM Kata Connection MLC conference 2014.
Age Regulations - effective from 1 st October 2006.
PERFORMANCE APPRAISAL IN THE SIERRA LEONE CIVIL SERVICE PRESENTER: DAVID WS BANYA DIRECTOR PERFORMANCE MANAGEMENT – HRMO.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
The economic regulation of gas processing services Key issues and initial thoughts Ofgem presentation 18 June 2007.
AQ Overview.  Annual Quantity (AQ) is a value held for each meter point that reflects the expectation as to the volume of gas that a meter point will.
Children’s Trust Network 19 October 2011 Developments in Safeguarding Anthony May Corporate Director for Children, Families and Cultural Services.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
Review Group 175 Encouraging participation in the elective DM Regime - Potential Models 22 November 2007.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
DNPC06 LDZ NEC Charges Denis Aitchison 25 th January 2010.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Distribution Network Interruption - Initialisation 28 September 2010.
AQ Tolerance Proposal Mod 209 – August Page 2Theme Date Department AQ Tolerances  Provide a view of appropriate tolerances for AQ validation 
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
Planning and Organising Two Plant and Equipment Excavation calculation ConstructioConstrucc 2 : 2012 Construction Practice 2 : 2012 Presenter Tony Bosnich/Glenn.
Project Nexus Workgroup Extension of Modification 0434 to permit retrospective updates pre-dating Project Nexus Go Live Date 9 th September 2014.
PN UNC Workgroup Read Validation 4 th October 2011.
Appraisal Process & Paperwork Update Changes to A4C Terms & Conditions Nationally agreed Agenda for Change terms and conditions (annex W) were.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Advertising Opportunities on Drive further awareness of your media to over 8,000 marketers and agency planners.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Replacement of Any Read – Initial views. 2 Assumptions  Can’t re-open NDM Allocation or Energy Balancing after D+5  Can’t go back to a read before prevailing.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
OS 2015: Allocation Rules Proposal by TSOs 11 th SG meeting Paris 16 th March 2010.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
DIVERSITY: VIEW FROM THE UK
Disaggregation Working with aggregate units facilitates intermediate planning. But to put this plan into action we should translate it, decompose it, disaggregate.
NON FINANCIAL REPORTING: DEVELOPMENTS IN THE UK
Options for Mod 640 Replacement
Battery Life Test Phase: PVT Date:
Presenter Tony Bosnich Oct 2015
Project Nexus Workgroup MPRN Lifecycle 11th August 2014
Load Factor Variation Sallyann Blackett.
Rolling AQ Review Group 177.
Impacts of Project Nexus Implementation Date to AQ17
Project Nexus Market Differentiation Formal Market Separation
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
Deferral of Retrospective Updates Functionality
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Project Nexus Workgroup
Overview of RbD Risk Modelling 31 March 2008
DN Interruption Phase II
AQ Threshold Analysis Steve Taylor Centrica plc.
Project Nexus Workgroup
COR1000 Telecoms Project UK Link Committee
AQ Review System Calculation Overview
Nexus Workgroup Read Validation Scenarios
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
Mod 209 – Rolling AQ.
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
Annual Quantity (AQ) 45.
Further Considerations
Enabling Large Scale Utilisation of Class 3
Customer Issue Management Dashboard CoMC
S – specific M – measurable A – agreed R – realistic T – time phased
Presentation transcript:

Review Group 177 Rolling AQ

Issues with current AQ process Current process requires significant manpower in a short space of time Number of uncalculated is an issue Changing AQ outside the amendment window is slow Using the confirmation process increases the time to amend AQ Change in confirmation number each time the AQ is amended through this route Leads to a large step change on 1st October that has to be managed Significant movement post 1st October that would be better if smoothed across the year Theme Date Department

Benefits identified AQ would be more responsive to demand changes Minimises selective targeting of reads and therefore removes gaming opportunities Spreads the workload through the year and allows timing to be Shipper led Theme Date Department

Things to discuss for rolling AQ Year round manpower for phased AQ changes? Less or more manpower Automatic validation? How would we be notified? Time to validate and agree? AQ drives SOQ and therefore capacity charges Would the 20% margin for not challenging AQ be retained What about ‘must read’ policy to ensure recalculation? What about changes within the first six months of ownership? Theme Date Department