Systems Integration Christopher Bessette Alexander Reich

Slides:



Advertisements
Similar presentations
POLICY Space Export Controls Update Since Delivering the 1248 Report to Congress - April 2012 −Congress added language into the FY13 National Defense Authorization.
Advertisements

Geospace Electrodynamic Connections (GEC) Mission The GEC mission has been in the formulation phase as part of NASA’s Solar Terrestrial Probe program for.
PLATO Phase A/B1 Status TOU Meeting Catania 28 Feb 2011 PLAnetary Transits and Oscillation of stars.
1 ESAIL proof of concept mission Juha-Pekka Luntama Pekka Janhunen Petri Toivanen.
System Identification of a Nanosatellite Structure Craig L. Stevens, Jana L. Schwartz, and Christopher D. Hall Aerospace and Ocean Engineering Virginia.
AAE450 Spring 2009 Project X pedition Final slides outline for Orbital Transfer Vehicle Propulsion Week 11 Presentation Thursday, March 26, 2009 Brad Appel.
By Matthew Patterson. L ow E arth O rbit N anosatellite I ntegrated D istributed A lert S ystem.
Icarus Student Satellite Project Hannah Goldberg Dr. Brian Gilchrist BT Cesul Student Space System Fabrication Lab (S 3 FL) University of Michigan, College.
UHM CanSat Team Members: Chris Ho: Team master, software Tyson Fukuyama: Hardware.
Icarus Student Satellite Project
Satellites There are over 8,000 artificial objects orbiting the Earth. 2,500 are operative or inoperative satellites. The rest is junk….eg. hatch covers,
S/C System Design Overview Robert G. Melton Department of Aerospace Engineering.
The Pursuit for Efficient S/C Design The Stanford Small Sat Challenge: –Learn system engineering processes –Design, build, test, and fly a CubeSat project.
5 Space Technology “Paving the Way for Future Micro-Satellite Missions” 1 NASA’s Space Technology 5 Mission NSF workshop on Small Satellite Missions for.
1 Project Name Solar Sail Project Proposal February 7, 2007 Megan Williams (Team Lead) Eric Blake Jon Braam Raymond Haremza Michael Hiti Kory Jenkins Daniel.
Satellite Communication
Launching, Orbital Effects & Satellite Subsystems
→ Potential ESA- Roscosmos Cooperation in Education Activities.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
1 Formation Flying Shunsuke Hirayama Tsutomu Hasegawa Aziatun Burhan Masao Shimada Tomo Sugano Rachel Winters Matt Whitten Kyle Tholen Matt Mueller Shelby.
Southwest Research Institute NSF Conference on Small Satellites Plasma Instrument Miniaturization and Integration: Approaches and Limitations C.J. Pollock,
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
1 Formation Flying Project Proposal 2/5/07 Rachel Winters (Team Lead) Aziatun Burhan Tsutomu Hasegawa Shunsuke Hirayama Matt Mueller Masao Shimada Shelby.
Indian Ocean METOC Imager (IOMI) Operational Concept Demonstrates Military Operational Utility and Enables Improved Global Weather Prediction Data to Naval.
Different Coverage Patterns for a Single Satellite and Constellation of Satellites in Real Time with the STK Pedro A. Capó-Lugo Graduate Student Dr. Peter.
USUSat III - TOROID TOmographic Remote Observer of Ionospheric Disturbances Preliminary Design Review Preparation.
Thermal Control.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
Corotweek n°9 - ESTEC December 6th, 2005 COROT PROJECT STATUS 1 COROT PROJECT STATUS Thien LAM TRONG.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Space Engineering 2 © Dr. X Wu, Space Engineering 2 Lecture 1.
FIRST/Planck 12 December 2000PT The FIRST Mission Implementation Status and Schedule T. Passvogel The Promise of FIRST.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
ST5 PDR June 19-20, Section 4.0 Future Status James A. Slavin Project Scientist 5 Space Technology “Tomorrow’s Technology Today” GSFC.
Satellite Communication. 17.2Satellite Networks Orbits Three Categories of Satellites GEO Satellites MEO Satellites LEO Satellites.
1 Weekly Summary Weekly Summary Formation Flight AEM4332 Spring Semester March 7,2007 Masao SHIMADA.
LionSat Thermal Subsystem Team Members: Nathan Hermanson Adam McDonald Joel Thakker.
Aquarius Mission Simulation A realistic simulation is essential for mission readiness preparations This requires the ability to produce realistic data,
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
1 EOS Aqua Mission Status at AMSR Science Team Meeting September 16, 2015 Huntsville, Alabama Bill Guit Aqua/Aura Mission Director - Code 584 phone
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
Wes Ousley June 28, 2001 SuperNova/ Acceleration Probe (SNAP) Thermal.
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
Jeopardy $100 $200 $300 $400 $500 Vocabulary $100 $200 $300 $400 $500 Name that Region $100 $200 $300 $400 $500 Where is my home? $100 $200 $300 $400 $500.
Preliminary Platform Design for KuaFu-A
Overview 3 2 Introduction Design Analysis Fabrication Testing
Maxim Pathfinder Prework 16 August 1999
Mission overview: two spacecraft that target key radiation belt regions with variable spacing
Technical Resource Allocations
Integrated Thermal Analysis of the Iodine Satellite (iSAT) from Preliminary to Critical Design Review October 20th 2016 Stephanie Mauro NASA Marshall Space.
Mini-RF Requirements Overview
ACS UC Berkeley Space Sciences Laboratory
James Webb Space Telescope
University of Colorado at Boulder January 21, 2004 Boulder, Colorado
Current SOC-Ground System Integration Schedule (Jan )
TEMPO’s Commercially Hosted Payload Concept
CONTOUR NGIMS PRE-SHIP REVIEW
System Identification of a Nanosatellite Structure
CubeSat vs. Science Instrument Complexity
EagleSat 2 – Mission and Development Overview
Jeopardy Q $100 Q $100 Q $100 Q $100 Q $100 Q $200 Q $200 Q $200
CanSat “A CanSat contains all the major subsystems of a real satellite, such as power and communications.  The only difference is that it will not go.
Proba-3 is ESA’s – and the world’s – first precision formation flying mission.
<Your Team # > Your Team Name Here
CHEOPS - CHaracterizing ExOPlanet Satellite
Presentation transcript:

Systems Integration Christopher Bessette Alexander Reich Nicolette Yovanof AERSP 401A 12/11/03

LionSat Nanosatellite Program 12 Universities Competing Launched on STS Launched into LEO Lifetime Expectancy: 6-12 months

LionSat Mission Timeline

Objectives Primary Objectives Secondary Objectives P1: To map the ram and wake plasma structure surrounding a small satellite. P2: To collect data on ionospheric plasma in a variety of geophysically interesting locations in low Earth orbit. P3: To test, on orbit, a miniature RF ion thruster. Secondary Objectives S1: To test IP communications for uplink and downlink to a spacecraft in low Earth orbit.

Mission Requirements Mission Requirements M1. The plasma environment mapping throughout the entire perturbed region (i.e., ram and wake) must be resolved to 30±5 degrees about the satellite spin axis. M2. The electron density and temperature of both the unperturbed and perturbed regions around the nanosatellite must be collected and returned to the ground for a minimum of three separate geophysically meaningful campaigns. M3. The miniature RF ion thruster must demonstrate a minimum of one hour of continuous operation. M4. The miniature RF ion thruster must demonstrate a measurable change in the satellite rotation rate.

Systems Integration is… Interaction between subsystems Interfaces and Integration of subsystems Educational Outreach Overseeing Requirements

Systems Integration Breakdown Member Subsystem Christopher Bessette GNC, Propulsion Alexander Reich Power, Scientific Instruments Anju Thomas C&DH, Communications, Ground Control Nicolette Yovanof Thermal, Structures/LV Interface

Work Completed Requirements Flow Charts Communication Between Subsystems Weekly Progress Reports Safety and Configuration Management Meeting Expedition Educational Outreach SDR Preparation

Subsystem Updates GNC, Structures, Thermal – Up Next! C&DH Communications Power Propulsion Scientific Instruments

Subsystem Design Review January 14-16th, 2004 in Dulles, Virginia Requirements: 2-4 Slides from each Subsystem Preliminary Subsystem Drawings Subsystem Test Plans List of Materials Hardware Basic Plans for Testing

Subsystem Design Review – Systems Integration Compiling All Information From Subsystems Master Flow Charts Project Requirements Subsystem Interaction Hardware Interfaces Help Prepare Posters for Poster Session Miscellaneous Final Preparations

Spring Semester Work SDR Final Plans Review of Comments from SDR Continuous Update of Interfaces and Charts Educational Outreach Preparation for Safety Reviews and Critical Design Review LionSat Transition

Questions? Conclusion LionSat Objectives & Mission Requirements Systems Integration Work Subsystem Design Review Future Work Questions?