Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Band 2 Workshop.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Mental Mind Gym coming …. 30 Second Challenge - Early Additive.
SunGuide TM Software Development Project Release 3.1: I-95 Express Lanes Design Review Follow-up January 29, 2008.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Win Big AddingSubtractEven/Odd Rounding Patterns Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Last Chance.
2010 ITRS Winter Meeting AGENDA(Proposal) Winter WORKSHOP AGENDA AND SCHEDULE(Proposal) Rev.1 Wednesday, 1December --- Tsukuba International Congress.
WHAT DO THEY ALL MEAN?. Median Is the number that is in the middle of a set of numbers. (If two numbers make up the middle of a set of numbers then the.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Virtual Biodiversity ViBRANT Scripting Life: goals & logistics for day 2 Vince Smith Natural History Museum, London ViBRANT Virtual Biodiversity.
FREEDOM DRIVE 2013 The Future of Independent Living, Active Citizenship and Europe – 12 September 2013.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Multiplying monomials & binomials You will have 20 seconds to answer the following 15 questions. There will be a chime signaling when the questions change.
You will need some paper!
0 - 0.
1 1  1 =.
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING Think Distributive property backwards Work down, Show all steps ax + ay = a(x + y)
Teacher Name Class / Subject Date A:B: Write an answer here #1 Write your question Here C:D: Write an answer here.
Addition Facts
Welcome to Spring Garden. Today! Schedule Overview of classes Advisement Core Lab SGMS Privilege System Grading Practices Questions???? Tour.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
SVQs Business and Administration Launch Events January/February 2011.
WARM UP What is the value of 4 5 x 4? Explain. WARM UP What is the value of 4 5 x 4 3 ? Explain.
Welcome to Who Wants to be a Millionaire
YEAR 1 WEEK 15 CAREER DEVELOPMENT WORKSHOP DAY 1 delivered by Careers Service/JFR 10:00welcome and introduction 10:30considering the options - roles, careers,
AST Committee of Visitors National Radio Astronomy Observatory NRAO Vernon Pankonin Program Officer.
Break Time Remaining 10:00.
Circumstellar disks: what can we learn from ALMA? March ARC meeting, CSL.
INTERNET SHIELD COURSE F-SECURE ® ANTI-VIRUS CLIENT SECURITY 6.
Mental Math Math Team Skills Test 20-Question Sample.
Money Math Review.
5.9 + = 10 a)3.6 b)4.1 c)5.3 Question 1: Good Answer!! Well Done!! = 10 Question 1:
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
We are learning how to read the 24 hour clock
Energy & Green Urbanism Markku Lappalainen Aalto University.
Adding Up In Chunks.
Science ROCKS! Welcome to the Hamilton County District In-service: August 4, 2011.
OPEN DAYS B11 Creating synergies between EU funds: demographic change and active ageing in European Territorial Cooperation and the ESF 9 October.
Network Security Workshop Dhaka, Bangladesh 09 – 11 November 2013 Proudly Supported by:
Addition 1’s to 20.
DW WASH Cluster – Emergency training DW0 1 Disaster Waste in Emergencies Opening session.
Money Management Workshop. Overall Plan for the Day 9:30 - 9:45 – Registration 10: :30 – Aim 1 Money Bags 10: :00 – Coffee Break 11: :30.
End Simplify A. 13B. 147 C. 17D – 2(5)+7.
Test B, 100 Subtraction Facts
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
Week 1.
Let’s take a 15 minute break Please be back on time.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Conference Program 09:00 Welcome 09:30 Session 1: Optics and Photonics 10:45 Coffee Break (Poster Session) 11:15 Session 2: Gravitation, Cosmology and.
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Select a time to count down from the clock above
EXAMPLE 4 Standardized Test Practice SOLUTION
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
The Green Bank Telescope a powerful instrument for enhancing ALMA science Unblocked Aperture Low sidelobes gives high dynamic range Resistance to Interference.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array EVLA Observations of.
CDL Band 2 Design Study Kickoff Meeting Goals of this meeting – Finish in one hour – Everyone upon leaving knows their role and responsibility and how.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Studies of Star.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
Frayer (1) The GBT 4mm Rx David T. Frayer (NRAO) Instrument’s purpose: GHz spectral-line science {Called “4mm” since middle of band is 80GHz (3.75mm)
An NSF Facility Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
Presentation transcript:

Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Band 2 Workshop Introduction Band 2 Design Study Summary E. Bryerton, M. Morgan, M. Pospieszalski, S. Srikanth, K. Saini, D. Vaselaar

ALMA Band 2 Workshop Schedule 09:00-09:30 Design Study Overview (Bryerton) 09:30-09:50 GBT 4mm Receiver (Frayer) 09:50-10:10 UAz 4mm Receiver - Part 1 Technical (Lauria) 10:10-10:30 UAz 4mm Receiver - Part 2 Observations (Ziurys) 10:30-10:45 Break [WebEx & audio inactive] 10:45-11:10 Star Formation (Oberg) 11:10-11:35 Deuterium-Bearing Molecules in Dense Cores (Schnee) 11:35-12:00 The Evolution of N2H+ and N2D+ in the Protostellar Phase (Tobin) 12:00-12:30 NH2D and CH2D+ (Wootten) 12:30-13:30 Lunch (supplied by workshop) [WebEx & audio inactive] 13:30-14:00 Studies of Star Formation in the Nearby Universe (Mangum) 14:00-14:20 Redshifted Molecular Gas (Frayer) 14:20-14:45 Discussion of science drivers 14:45-15:15 Panel Discussion 15:15-15:30 Break [WebEx & audio inactive] 15:30- Workshop summary and adjourn Band 2 Workshop Charlottesville, VA 29-May-20132

ALMA Band 2 Frequency Range Band 2 Workshop Charlottesville, VA 29-May Band 3 is GHz Current Band 2 Spec is GHz

ALMA Where Would Band 2 Go? Band 2 Workshop Charlottesville, VA 29-May-20134

ALMA Band 2 Workshop Goals Focus on uniqueness of science case Some technical overviews at beginning for context Open discussion encouraged Questions now: – How much overlap with band 3 is desirable? – Is extending band 3 below 84 GHz (to ???) an option? Only if performance in current band 3 range is unaffected? Question to answer in ~2 years time – Is full installation of band 2 receivers on ALMA worth the approximate $12M price tag? Band 2 Workshop Charlottesville, VA 29-May-20135

ALMA ALMA Development Program Funding lines in NA, EU, and EA Two types: Design Studies & Development Projects Development Projects – Funding ramps up to $13.6M per year total from all partners in 2015 – ~$5M per year from NA – Required ASAC approval and JAO coordination $500K per year per partner in design studies (strictly regional) – One-year, <$200K – Current NA and EU band 2 efforts are design studies Band 2 Workshop Charlottesville, VA 29-May-20136

ALMA Current Development Projects Band 5 Construction – European led effort for full installation of band 5 on all antennas – ESO spending ~$16M from (all their project funding) – NA-NRAO supplying LO (~$3M) Fiber Connection OSF-Santiago – 25x increase in data rate ALMA Phasing Project (VLBI) – $0.52M from ALMA-NA, remaining funds from NSF MRI Band 1 (EA) – Nov. 2012: ALMA Board approved development of prototype band 1 receiver Band 2 Workshop Charlottesville, VA 29-May-20137

ALMA NA FY14 ALMA Development Call for Proposals Development Projects – $4.3M total available in FY14 and FY15 – $1.5M maximum award (over two-year period) Design Studies – $1M available in FY14 – Will be another call for FY15 ($500K available) Band 2 Workshop Charlottesville, VA 29-May-20138

ALMA European Band 2 (+3) Design Study 18-month study begun in June 2012 (STFC / IRAM / INAF) Deliverables: Science case, study of key technologies to develop a band 2 or a band 2+3 cartridge design Science Workshop held earlier this week Band 2 Workshop Charlottesville, VA 29-May-20139

ALMA NA Band 2 Design Study Overview Joint NRAO-ARO Study Oct – Sep. 2013, $100K Concentrate on demonstrating technology readiness of key components – Low-noise amplifiers – OMT – Optics – Downconverter Science Motivation – Unexplored bandwidth, especially with interferometry – Deuterated species in cold cores – Galaxies at intermediate redshift – Complex organics Band 2 Workshop Charlottesville, VA 29-May

ALMA Band 2 Gain/Noise Budget Band 2 Workshop Charlottesville, VA 29-May Component/StageGain (dB)Noise Temperature (K)T EQ (K) referenced to the input Lens/Window (297K) IR Filters (15K, 110K) Feedhorn (15K) OMT (15K) Cryogenic LNA (15K) Cryogenic Isolator (15K)3.9insignificant Cryogenic Postamp (15K) Waveguide Feedthru (297K)77insignificant Donwnconverter (297K) insignificant Warm IF Amplifier (297K)20175insignificant Total Table 2: Preliminary gain and noise budget for the ALMA band 2 receiver. Current ALMA Band 2 Noise Specification: 30 K SSB over 80% of the RF band and 47 K SSB at any RF frequency in the band, where the RF band is defined as GHz. Given baseline optics design (warm refractive optics), this is extremely difficult and perhaps impossible (requires LNA with <15K noise temperature) Slightly more realistic would be cold lens and a LNA with 20K noise temperature Really need reflective optics, but may not fit (currently under study)

ALMA Band 2 Turnstile-Junction OMT Band 2 Workshop Charlottesville, VA 29-May X-band (8-12 GHz), Ku-band (11-18 GHz), and Q-band (35-52 GHz) versions already demonstrated Band 2 version (currently in fabrication) will be ~32 grams (not including #0-80 screws)

ALMA Band 1 OMT Measurements 13Band 2 Workshop Charlottesville, VA 29-May-2013 Three Band 1 OMTs fabricated and measured

ALMA Insertion Loss In Al, Au Band 1OMTs 14Band 2 Workshop Charlottesville, VA 29-May-2013 Gold Plating Nominal zincate Alkali copper : 25 μ Pur-a-gold 125: 50μ S to 0.35 dB Theory 0.34 dB at 40 GHz for Au Predicted S 21 of 0.12 dB at 15K

ALMA Proposed Band 1 OMT and Amplifier Layout 15Band 2 Workshop Charlottesville, VA 29-May-2013 Band 2 Cartridge layout will be similar

ALMA Low Noise Amplifiers for Band 2 16 Band 2 Workshop Charlottesville, VA 29-May stage MMIC LNA (MMIC-A and MMIC-B two different designs) 6-stage hybrid LNA (WM###)

ALMA Low Noise Amplifiers for Band 2 Band 2 Workshop Charlottesville, VA 29-May Two 35nm MMIC designs have been tested, both 3-stage with ~30dB gain 2 of 3 35nm wafer runs so far have given good cold results (4 th run preliminary results encouraging) Samples from APRA3 35nm wafer recently delivered, will be tested this summer Broadband Cryo3 MIC LNA to be tested this summer Current generation of 35nm MMIC design are 3-stage, 30 dB gain. Would really like 4-stage, 40 dB gain (eliminates need for 2 nd cold LNA)

ALMA Proposed Band 2 Block Diagram Band 2 Workshop Charlottesville, VA 29-May

ALMA Band 2 Multi-Chip I/Q-Mixer LO=75 GHz LO=80 GHz Commercial MMIC mixers Machined RF quadrature hybrid and LO splitter Tested with external Band 6 IF hybrid (coaxial, not shown) Band 2 Workshop Charlottesville, VA 29-May

ALMA Band 2 MMIC I/Q-Mixer Chip PhotoSimulated Performance Band 2 Workshop Charlottesville, VA 29-May (fixed IF)

21Band 2 Workshop Charlottesville, VA 29-May-2013 The National Radio Astronomy Observatory is a facility of the National Science Foundation operated under cooperative agreement by Associated Universities, Inc. science.nrao.edu