TGp Closing Report Date: 2007-09-21 Author: September 2007 Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2007 TGp Closing Report Date: 2007-09-21 Author: Lee Armstrong (Armstrong Consulting, Inc.) John Doe, Some Company
Abstract TGp closing report for September meetings September 2007 Month Year doc.: IEEE 802.11-yy/xxxxr0 September 2007 Abstract TGp closing report for September meetings Lee Armstrong (Armstrong Consulting, Inc.) John Doe, Some Company
Meetings 4 time slots during the week September 2007 Meetings 4 time slots during the week 12 submissions for presentation (on server) Lee Armstrong (Armstrong Consulting, Inc.)
September 2007 LB110 Ballot failed 143 affirmative votes 50 negative votes 58 abstention votes === 249 votes received = 74.09% affirmative Lee Armstrong (Armstrong Consulting, Inc.)
September 2007 TGp wishes to thank those of you who took the time to review our draft and prepare comments. Your input will result in an improved draft for future. Lee Armstrong (Armstrong Consulting, Inc.)
September 2007 Current Status LB closed one business day before the Interim meetings started Insufficient time to do much more than assemble comments Exact count not available as some duplicates are still being found Number of comments are approximately 550 Moved to accept Draft 3.0 as our working draft Began LB110 comment resolution Most editorial comments being addressed by editor Managed to resolve some technical comments in spite of short preparation time Lee Armstrong (Armstrong Consulting, Inc.)
Plans Weekly teleconferences to address outstanding comments September 2007 Plans Weekly teleconferences to address outstanding comments Lee Armstrong (Armstrong Consulting, Inc.)