STUB configuration Mats Pålsson

Slides:



Advertisements
Similar presentations
Grounding Electrodes.
Advertisements

Chapter 8: Duct Design and Sealing To be used with the Guide to Building Energy Efficient Homes in Kentucky.
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
GROUNDWATER CONTROL.
MP Prototype 2 1IWF-EXP/ÖAW GRAZ  Smaller Size  Outcome of the test results with MP-P1 was the need for a reduced cross section  Rectangular Shaped.
CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
Status of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray ARIES Meeting PPPL, NJ Sept.
Installation. Indoor Unit Installation Typical Installation.
Ice Pile Air Conditioning Joseph Cooper: Project Lead Kylie Rhoades, Clara Echavarria, Jonathon Locke, Alex Gee.
Warm magnets and the remote handling system in the J-PARCν beam line E. Hirose, K. H. Tanaka, Beam Channel Group.
L 17 - Thermodynamics [2] Today’s topics –Practical thermal effects –Devices for temperature measurement –Mechanisms of heat transfer Science dealing.
Engineering Department ENEN Choice of the material for TCTP ferrite supports Collimation Working Group F. Carra, G. Cattenoz, A. Bertarelli,
Operational and Technical Requirements Rob Connatser Chief Instrument Project Engineer November 2014.
Lali Tchelidze Safety work package leader
INTRODUCTION Definition:
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
NFPA 31 Standard for the installation of Oil- Burning Equipment
ZTF Cryostat Finite Element Analysis Andrew Lambert ZTF Technical Meeting 1.
Reinforced Concrete Design
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 HBD Air Cooling System TK Hemmick for the HBD group 8/25/06.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
PSB dump replacement 17 th November 2011 LIU-PSB meeting Alba Sarrió.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
ATF hardware status - Orbit Stabilization T.Naito(KEK) ATF2 Project meeting Laboratoire de l'Accélérateur Linéaire (LAL) 1.Orbit oscillation.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
ESS Grounding System Concept Fundamentals and Requirements
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
Target Systems and Monolith Design Update Rikard Linander Group Leader Monolith and Handling April 2, 2014.
SPS High Energy LSS5 Thermal contact & cooling aspects
LCLS-II High Power RF L1-L3 Spaces Review Andy Haase Feb
Physical Transmission Media Chapter 8. Objectives In this chapter, you will learn to: Identify the characteristics of wireline transmission Describe the.
New nTOF target: Design Issues
Part 16 Technician’s Guide & Workbook for Duct Diagnostics and Repair
Teleconf ACS – FREIA 28th March 2017
"Drawer Mechanics - MiniDrawer"
ESS Phase Reference Signal Distribution
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
CBETA Technical Review
Service channels between Tracker and PP1
Large glazing in curtain walls - study on impact
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Cooling pipes and Space for Services
cooling for BGV modules
Structural Fire Engineering, October 2015, Dubrovnik, Croatia
Radiation protection of Linac4 M. Silari Radiation Protection Group
CEDAR Detector Ventilation System Review
TBM thermal modelling status
COOLING & VENTILATION INFRASTRUCTURE
The 11T cryo-assembly: summary of design and integration aspects
Cryostat 5 K Thermal Shield -- Conclusions (Proposed)
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Hot Water Systems Cylinders and Systems.
Smokes extraction principle
Operations, Risks & Hazards
Smitty’s Two Minute Drill Grounding and Bonding
Tracer Applications.
Authors: W. Chung et al, ITER Korea Highlights
Electrical and fluid couplings
IKON 15 Talal Osman & Iain Sutton
Bunker Wall Design Wall ESS
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

STUB configuration Mats Pålsson www.europeanspallationsource.se 19-05-10

Agenda Intro Structure/space Thermal situation Fire Radiation Cables Cooling Next steps Installation

STUBS Structure / Space Dimensions of the concrete structure of the stubs are fixed and also it is decided that cabling and wave guides shall be routed together in the same space/stub.

Thermal situation Maximum temperature of the signal cables for the different cases.

Imposed requirements No poly beads/pellets/boards/bricks! Fire The Tunnel and the Gallery are two different fire compartments and it needs to be a 60 minutes barrier. Location is not specified. The fire barrier shall be nominally capable of confining fumes. We can avoid Fire detection and suppression in the stub if: 60 min fire barrier in each end of the stub non-combustible radiation shielding material (e.g. sand or concrete) Cables are compartmentalized in e.g. closed metal cable trays/ducts No combustible material in the stub that is not compartmentalized Temperature shall not exceed 85℃ No compartment containing combustible material with section dimensions larger than 0,25x0,5m No poly beads/pellets/boards/bricks!

Fire sealing Fire protection/shielding outside of radiation shield both towards the tunnel and the gallery.

Imposed requirements Radiation Radiation shielding between the accelerator tunnel and RF gallery is estimated to be equivalent to at least 2,6m of sand (minimum 1,8 g/cc). The shielding may be divided in sections. There shall be no active exchange of air between the gallery and the lower part of the stub/tunnel. Avoid water system running in the gallery down to the lower part of the stub/tunnel and back again.

Radiation shielding Space for additional Radiation shielding (if needed) Radiation shielding with sandbags and/or concrete blocks equivalent to 2,6m of sand (1,8g/cc)

Which stub? Different configurations STUB 310-360 empty? (1500x1200)

Which stub? Cable routing Pictures from Lea’s Accelerator Tunnel Cable Feeding Plan Technical Report Figure 7, coaxial RF cables

Cables in Stub amount

Cooling of waveguides (Stubs) Cooling with water from Tunnel side Cooling by conduction by running pipes on: Waveguides power cable trays (lower part of stub section) Cable trays or a “temperature shield” between wave guides and signal cables (upper part of the stub section) Interface: Connect on “existing” cooling water in the tunnel Manifolds to collect cooling pipes (approx. 8-10 pipes/stub) Manage flow control Manage air pockets

Cooling of waveguides (Stubs) Cooling system Collection pipes/manifold Copper tubes

Cooling of waveguides (Stubs) The copper tube needs to be applied to the wave guides and cable compartments with a certain “full contact” area/meter to ensure required heat transportation. Aluminium profile Copper tube Wave guide

Cooling of waveguides (Stubs) Control cables In closed metallic compartment Alternative Temperature shield Wave guide Power cables Copper tubes

Cooling of waveguides (Stubs) Full length copper tubes inside the stubs without joints to minimize the risk of leakage

Final Proposal (cooling water from the tunnel) Connect pipes to cooling system in the tunnel and route the piping down to collection pipes outside of the stubs that needs active cooling. To this collection pipe there will be copper tubes connected. The copper tube needs to be applied to the wave guides with a certain “full contact” area/meter to ensure required heat transportation. Cabling inside the stubs shall be in metallic (galvanized steel) cable trays (compartments). Copper tubes shall be applied at the trays for control- and signal cables to ensure that the maximum temperature not will be exceed. Copper tubes also shall be applied at the trays for power cables to remove the heat load from the cables. All piping inside the stubs shall be without joints to minimize the risk of leakage i.e. full length copper tubes. If lower temperature is required the contact area between tubing and wave guide shall be increased and also low temperature cooling system is to be considered. Radiation shielding with sandbags and/or concrete blocks equivalent to 2,6m of sand (1,8g/cc) to meet required shielding. These shall be configured in the lower and the upper part of the stub. Fire protection/shielding outside of radiation shield both towards the tunnel and the gallery.

Ongoing in Utgård Mock up to learn characteristics of cables and cable trays: Bending radius Cable pulling Bundling Space required Configuration Vertical routing Etc.

Next Steps Cable pull results Layout of configuration of cables Cable tray/conduit design Detailed WG-Cooling tube contacts Water header design Temp maps of final solution Overall summary

Installation Topics: Cable trays WG supports WG Bundling cables Pull cables Lay cables Clamp water tubes Shield backfilll Fire seal