Tom Shea, Andreas Jansson, Cyrille Thomas

Slides:



Advertisements
Similar presentations
December 10, 2008 TJRParticle Refrigerator1 The Particle Refrigerator Tom Roberts Muons, Inc. A promising approach to using frictional cooling for reducing.
Advertisements

D2 conceptual design and field quality optimization Ramesh Gupta, BNL Slide No. 1 Nov. 13, 2013 D2 Conceptual Design and Field Quality.
Continuous Value Enhancement Process
Hall D Photon Beam Simulation and Rates Part 1: photon beam line Part 2: tagger Richard Jones, University of Connecticut Hall D Beam Line and Tagger Review.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
Mid Term Review Meeting, 26 September 2012S. GIRON1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Dark Current Measurements and Simulations Chris Adolphsen 2/4/15.
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Cube Measurements Tent Crew. Scintillation BNL 241 Am Semi- collimated  Spectralon Diffuse UV Reflector SBD  -Trigger Scint. Light Poisson.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
EventsDuration of event (days) Dates (months after start) DeliverablesExternal participation (researcher-days, rd), total = 450 rd Kick-off meeting1m1-m2Protocol0.
M. Barnett - December 2005 Particle Data Group Introduction Michael Barnett December 6, 2005.
Andreas Jansson, "Quadrupole Pick-ups", LHC BI-Review, November 19-20, Quadrupole Pick-ups  What is a quadrupole pick-up?  PS pick-ups and experimental.
Interaction between Detector and Accelerator Final goal of IR Design is a maximum of useful data on tape In general: There is no clear Boundary between.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
PS-ESS and LEBT State of the art Lorenzo Neri Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud.
Non-invasive Profile Monitors for the ESS Linac Cyrille Thomas (ESS) Jacques Marroncle (CEA) 10 th February 2016.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
AIP and Large Projects Arne Freyberger OPS 2015 StayTreat.
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
Incident Reporting And Investigation Program
Schedule for the FAIR Antiproton Target
MuCool Test Area Dedicated facility built at the end of the Linac to address MuCool needs RF power 805MHz, 201MHz)
Systems Analysis and Design in a Changing World, 4th Edition
KEK news ( ) S.Tanaka.
2016 Year-End Performance Management
BDS Cryogenic System RDR Status and EDR Plans
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
6th BINP-GSI-FAIR workshop
ILCDR08 10 July 2008 Plan of measuring cloud density in the solenoid field and in the quadrupole field K. Kanazawa (KEK)
Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon
Proton Source and LEBT Luigi Celona & Lorenzo Neri
UK RFD Pre-Series cryomodule
Tom Shea Front End Meeting Catania
Incident Reporting And Investigation Program
5.08 ASSET MANAGEMENT AND DECISION SUPPORT IN A COST-CUTTING REGIME
Beam Tests of Ionization Chambers for the NuMI Neutrino Beam Monitoring System MINOS.
SLE Information.
A Cold SCU Phase-Shifter
Closing Presentation Date
INFN and the ILC S. Bertolucci, INFN.
Mark McKinnon EVLA Project Manager
UCB Progress with 8” MCPs and Testing
SLE Information.
LHC External Collimation Review
Daresbury ESS In-Kind Contributions
cNPM pre-CDR Concluding Remarks
Toward CDR: Plan & Perspective
SLE Information.
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Safety Readiness Review (SRR) Thomas Hansson, ESH
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Introduction to the NPM for ESS Cold Linac
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
ACCSYS Collaboration Board Triestre, 3rd october 2017
Overview of the TARGET Monolith Rough Vacuum
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Overview of Beam Test Benoit, Ronaldo and Eduardo Nov 8 , 2005 thanks to Steve and Bill for helping to consolidate all the information.
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

Tom Shea, Andreas Jansson, Cyrille Thomas NPM closeout Tom Shea, Andreas Jansson, Cyrille Thomas 2018-07-19

Summary As presented, the overall approach and the path to the December CDR is approved. Observations Great progress, even though more work is required prior to CDR Just one example: excellent development of the minimally-invasive maintenance and replacement solution High voltage requirements are similar to devices deployed at other facilities. Therefore we expect that this can be achieved if good HV design practices are followed.

Recommendations Develop more details about how to clean and make particle free Bring in expertise from the CEA cryomodule team If used, verify that MCP is delivered particle free Assure that sparking will not release damaging particles. Estimate the impact of coupling to electromagnetic fields of the beam This has been an issue in similar devices, and may even be the dominant source of background Estimate lifetime of electronics located near the LWU Do not base technology decision on current state of EPICS integration Choose best technology and then develop plan for EPICS integration Compare low current measurements to beam simulations of IPHI in this regime This may provide valuable information for prediction of ESS performance with an iris-limited beam

Actions Perform additional simulations to determine background from particles due to beam loss and photons from cavities. BP provides primary particle tallies BD provides tallies of all particles entering volume of MCP or other detector elements, including estimate of photons from cavities. CEA estimates contribution to background Assure that diagnostics area in the stub meets requirements as a camera location. Action on ESS BD ESS BD should get written confirmation that Daresbury agrees to vacuum chamber change