Nexus Workgroup Read Validation Scenarios

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup (Settlement topic) Allocations Overview 4 th December 2012.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup Settlement topic 4 th October 2011.
Analysis of the Xoserve Read Validation Proposal Author: Alex Cullin 27/08/2014.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
PN UNC 4 th September 2012 Reconciliation Issues (Action: NEX06/02)
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
DM Elective Transfer Scenarios 29 January Principles  Incoming Shipper or Read Provider responsible for obtaining read at Start of GFD – i.e.
1 Modification 0152V Implementation Matters 25 October 2007.
Rolling AQ – Initial Calculation
David Addison / Steve Deery
Supply Point Register 7th December 2011
Supply Point Register 21st November 2011
Supply Point Register 10th January 2012
Modifications iGT 039 and GT 0440 re iGT Agency Services background
Project Nexus Workgroup (Settlement)
PN UNC Workgroup Invoicing 4th October 2011.
Background - Tolerance Rules
Project Nexus Workgroup AQ Correction Process Timeline
Nexus Meter Read Performance April 2018
Incentives 26 September 2018.
DM Elective Transfer Scenarios 26 February 2009
Project Nexus Workgroup
Project Nexus Workgroup
Project Nexus Workgroup
Impacts of Project Nexus Implementation Date to AQ17
Project Nexus Workgroup
Project Nexus Workgroup
PN UNC Workgroup Settlement Overview
Use this area for cover image (height 6.5cm, width 8cm)
PN UNC Workgroup (Settlement topic)
UK Link Replacement Programme additional supporting UNC modifications
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Joint Theft Reporting Review (from meeting 1st March 2019)
CSEPs SPA Rejections November 2007 update
Project Nexus Workgroup
AQ BTU Form – Process & Timeline 29th September 2009
Overview of RbD Risk Modelling 31 March 2008
Project Nexus Workgroup
AQ Review System Calculation Overview
Development Work Group 0209 Straw Man Update
Review Group 208 / Development Modification Group 194
Project Nexus Workgroup
CSEPs SPA Rejections December 2007 update
Actions Updates Action 0282/006 – Exclude from AQ process
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
Project Nexus Workgroup
PN UNC Workgroup (AQ topic)
Customer Issue Management CoMC Update
Annual Quantity (AQ) 45.
CSEPs SPA Rejections January – August 2007
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

Nexus Workgroup Read Validation Scenarios 4th December 2013

Background Read Validation rules and tolerances developed during the Settlement BRD Concern raised at 30th October workgroup that the tolerances may not be appropriate for Class 4 sites as a ‘flat profile’ is used (AQ / 365 x no. of days in period). Workgroup agreed the principle of read validation was correct but would like to examine the tolerances further The following slides provide a list of various scenarios considered by Xoserve during analysis of the AQ requirements to validate the principles & tolerances described in the BRD

Scenarios AQ = 1 Reason: the site has not been consuming gas for over 9 months Consequence: read will fail validation Outcome: AQ Correction process used to re-calculate the AQ then re-submit the read AQ is significantly higher or lower than sites predicted consumption Reason: change in plant or site previously ‘mothballed’ Consequence: read may fail validation

Scenarios cont. Site Isolated Vacant site AQ would carry over until 9 months consumption was available during the non-isolated period therefore read would not fail Vacant site AQ would reduce as reads are loaded with zero/low consumption over a period If read fails due to the AQ being low, the AQ Correction process to be used to amend AQ Round The Clock value incorrect/not populated Read would fail due to out of tolerance Re-submit read with correct ‘Round the Clock’ (TTZ) count

Scenarios cont. Change of Class – Class 4 to 2 SOQ is used to validate the reads, Shipper nominates the SOQ Change of Class – Class 2 to 4 Daily reads previously loaded for site and AQ reviewed monthly. Reads should therefore pass the validations based on AQ