Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting

Slides:



Advertisements
Similar presentations
Soil Exploration Part II
Advertisements

ISMR BLASTER RETRAINING Workshop
SITE INVESTIGATION.
Alireza Mahdizadeh - Jamaledin Borzouie
A Unique Stainless Holder Steel from D-M-E. U.S. Patent # 6,045,633
Educational Resource Library
Law of Conservation of Energy
VARIOUS WAYS OF TIMING NORMAL TIMING - BLOCK.
Blast Site Edge Protection
Common Blast Design Pitfalls Trouble Shooting The 19th Annual Surface Mined Land Reclamation Technology Transfer Seminar Jasper, Indiana December 5 th.
Excavation, week 2 M. S. Martin Sept Classification of Soils This and next four slides from Build Right - toolbox Site classification Soils are.
Chapter 13 Blasting Rock Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
ENGINEERING MATERIAL PROPERTIES (CE1303)
Better together... we deliver SASOL CHEMICALS BASE CHEMICALS (EXPLOSIVES) MOSH - "Day of Learning" 2014.
Soil & Site Investigation
Classic Open Pit Mining
Blasthole Sampling at Newmont Boddington Gold
Blasting safely with proper techniques
FACTORS AFFECTING SLOPE FAILURE Introduction Sr. No Name of the parameters and properties Details 1Geological DiscontinuitiesFault, Joint, bedding plane,
Design Optimization of Longwall Chain Pillars
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Design of an Aerospace Component
Web-based Class Project on Rock Mechanics Report prepared as part of course CEE 544: Rock Mechanics Winter 2015 Semester Instructor: Professor Dimitrios.
Soils Investigation Soil Investigation
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
Soil and Rock Sampling. Environmental Site Characterization Number of samples taken depends on the size of the site Hollow stem auger normally used for.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
SLOPE STABILITY IN OPENCAST MINES
COLUMNS. COLUMNS Introduction According to ACI Code 2.1, a structural element with a ratio of height-to least lateral dimension exceeding three used.
Stiffness Ratio Stiffness Ratio = B H / B where B H is Bench Height B is the Burden Target Stiffness Ratios 3 to 4 is normal range > 4 does not improve.
Amrit Prakash Jonko 08MN23.  A method of mining whereby high value ore is mined in such a manner as to make the low-grade ore left in the mine incapable.
Shot Design Example ©Dr. B. C. Paul 2000 Note – The example portrayed in these slides is an illustration prepared by the author using knowledge that the.
Vibrations from blasting
Slop Stabilization Pertemuan
FOOTINGS. FOOTINGS Introduction Footings are structural elements that transmit column or wall loads to the underlying soil below the structure. Footings.
First Step is Selection of Burden B = 0.67 * D e * (E/S gr ) 0.33 –D e is hole diameter in inches –S gr is the specific gravity of rock where water =
Using Konya’s Method to Identify Blast Design Problems An overview of the Havablast 4 Spreadsheet.
Geophysical and Geochemical Exploration Techniques  The specification sates that you should be able to:  Describe the geophysical exploration techniques.
ANALYSIS ON SLIDING MECHANISM OF TSAOLING ROCKSLIDE IN CHI-CHI EARTHQUAKE EVENT Tien Chien Chen National Pingtung University of Science & Technology Meei.
Designing Basic Blasting Shots Part I ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
Control of FINES DUST and. Introduction Dust is a general term : fine particles that are suspended in the atmosphere. Dust is formed when fine particles.
Designing Basic Blasting Shots Part II ©Dr. B. C. Paul 2000 Note – The topics covered in these slides represent the author’s summary of information familiar.
BLASTING FOR REDUCED ROCK DAMAGE AND CONTROLLING STABILITY
Computer Aided Mine Design Part III Cut-Off/Equipment Interactions ©Dr. B. C. Paul 2000 ©Dr. B. C. Paul Summer 2003.
1 Naruki Wakabayashi Shimizu Corporation Tokyo Japan Study on the Jointed Rock Mass for the Excavation of Hyper-KAMIOKANDE Cavern at Kamioka Mine NNN07.
Basic Blasting Patterns ©Dr. B. C. Paul 2000 Note – The concepts contained in these slides represent the author’s view of information commonly held among.
FLYROCK Flyrock is the propelling rock from the blast area. Leading cause of fatalities and equipment damage.
-Kazem Oraee (Prof) - Arash Goodarzi (Eng) - Nikzad Oraee-Mirzamani (Phd) -Parham Khajehpour (Eng) 34th International Conference on Ground Control in Mining.
Predicting Fragmentation ©Dr. B. C. Paul 2000 Note – This series of slides portrays the author’s summary of knowledge commonly held by people well studied.
Casting & Welding Engineering (IE 203) Second Year, Industrial Engineering Dept., Faculty of Engineering, Fayoum University Dr. Ahmed Salah Abou Taleb.
Southern Coal Fields Outburst Seminar
Ground Vibrations and Air Blasts: Causes, Effects and Abatement.
True Open Pits ©Summer 2003 Dr. B. C. Paul. Telling a True Open Pit Strip mines advance across the deposit backfilling pits with new overburden as they.
DASARI SURESH ASST. MANAGER (MINING)  What is fragmentation ?  Fragmentation is the process of breaking the solid in-situ rock mass into several smaller.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
SHORT DELAY BLASTING IN UNDERGROUND MINING
SOIL MECHANICS AND FOUNDATION ENGINEERING-II (CE 311)
Controlled Blasting In Cutting.
WEL COME. DRILLING AND BLASTING Index  Introduction of Drilling and its Necessity  Terminology use for drilling  Selection of drilling method  Selection.
CALL/WHATSAPP
BENEFITS RELATED TO APPLICATIONS OF MASS BLAST IN OPEN CUT MINING
GEOLOGICAL STRUCTURES
Drill cuts used in underground mines
Graduation Project Bracing system for deep excavation.
lectures Notes on: Soil Mechanics
Presentation transcript:

Final Wall Stability in Metal Open Pit Mines Using Presplit Blasting Kazem Oraee Ali Mozafari Arash Goodarzi Nikzad Oraee-Mirzamani

Importance of presplit drilling and blasting in open pit mines slope stability study is one of the most considerable parameter for safety and economical factors of open pit mines. failure of mines’ walls can potentially cause loss of lives, roads blocking, damaging to mining machinery, temporarily or permanently halt production and in the worst case scenario closing the mine. Production and Mining Benefits Ability to maintain safe conditions in mine Increased stability of the rock wall Improved stripping ratios Reduction in ore dilution Less broken rock to load and transport Reducing the vibration level in the rock mass Minimizing production schedule disturbances for mine stability comparison with mechanical rock reinforcement

Wall failure in an open pit mine

Failure in Pit Slop in Grasberg Gold Mine in Indonesia in 2003 The Grasberg mine is the largest gold mine in the world

Failure in Pit Slop Angouran Lead Mine in Iran 2006

Wall Failure in Pit Slop Angouran Lead & Zinc Mine in Iran 2006 25 million tons rock slide

Pit wall stability is dependent on: • geotechnical and hydrogeological issues • level of design safety (based on risk assessments) • ability to secure the ground (scaling, ground support, slope dewatering) detrimental effects of blasting

General Principals of Control Blasting drilling smaller diameter blasting holes along the final excavation boundary drilling straight holes charging with lower explosive than main holes firing holes in sequential timescale

Controlled Blasting Methods Line blasting Smooth blasting Cushion blasting Presplit blasting

Presplit Hole Design As a general guide for the presplit holes, spacing can be 8 to 12 times of the hole diameter or about one third to less than one half of the normal spacing used in production blast holes. It also can be determined by using the following equation: S ≤ 2 rb × 2.54 × (Pb + T) / T Where S = Spacing between two presplit holes (cm) rb = Borehole radius ( cm) Pb = Borehole pressure ( Mpa) T = Tensile strength of rock( Mpa)

In this equation borehole detonation pressure can be calculated by: Pb = 1.69 × 10-3 Ye (VOD)2 (re / rb)2.6 Where Pb = Borehole pressure in psi Ye = Specific gravity of explosives VOD = Detonation velocity of explosive charge ft/s re = Radius of explosive charge in inches rb = Radius of borehole in inches

Bore hole detonation pressure (Pa) for the full charge hole can be calculated by: Pd = × Ye × (VOD)2 × 106 Where Pd = Detonation pressure (MPa) Ye = Density of explosive (kg/m3) VOD = Velocity of detonation (m/s)

Buffer Holes Design (Buffer row is used to minimize blasting damage from production row to final wall) Normally the spacing and burden of about 2/3rd of production holes are used in buffer row but if presplit and buffer rows are of same diameter then, the burden in front of the presplit row to buffer row should be 1.5 times the presplit spacing holes and in case of different diameters, then diameter of buffer holes can be set to 12 to 15 times of presplit holes diameter. As a general rule, when the diameters of production and buffer holes are the same, then the burden and spacing of the buffer row should be 70 to 80% of the production blast holes.

Hole Charge Distribution Powder factors will normally range from 1.6 to 4.8 kg/m3 The ratio of the charge diameter to hole is about 0.3 – 0.4 The specific charge recommended for presplit holes is 0.35 to 0.5 kg/m2 and generally charge factor in buffer hole is about 75% of a production hole The charge density has to be reduced to 5 to 15 percent of the charge in production holes

Presplit Charging Methods Common charging methods in presplit holes to minimize near field blast damage Air deck charging Suspended charging Low density charging Continues column charging

Cartridge Diameter(mm) Guidelines are offered by Gustafsson, 1981, DuPont Hand Book, 1977, etc. which recommends the charge loads and blast hole pattern for presplitting as shown at the below table: Hole Diameter (mm) Charge Mass / Meter of Blast hole(kg) Cartridge Diameter(mm) Presplit Space (m) 89 0.65 23 1.0 102 29 1.4 115 152 1.8 45

Shooting the Presplit Line In order to make a free face to reflect shock wave resulted from blasting in production holes, the presplit row must be fired at least 50ms before the main production blast. As a rule, if the presplit holes are to be detonated with production blast holes, generally 200 to 350ms (not more) of delaying interval between presplit holes and the nearest production row or buffer row is recommended. To achieve optimum presplit results, zero detonation delay (simultaneous blasting) to be used between presplit holes, although if the numbers of holes in presplit row are more than usual pattern, blasting may be done in separate groups with minimum delay in sequence.

Presplit Drilling & Blasting Key Points • hole spacing and charging dependent on hole size, rock strength, explosive strength and decoupling ratio • highly jointed rock requires closer hole spacing than massive rock • when firing presplit row with production row, a minimum of 200 - 350 milliseconds time delay between presplit holes and nearest production holes is recommended • use zero delays between holes to achieve optimum presplit results • a bottom charge is often used to assure that the toe is pulled • straight hole drilling is a necessity

Chador Malu Iron Mine Site Profile Chador Malu iron ore mine with 400 million tons of ore reserve is the biggest iron concentrate producer in Middle East, located in 180km north-east of Yazd province in central Iran. Reconnaissance for the Chador Malu deposit was first done in 1921 and more detailed work was carried out in the beginning of 1960s. Petrography studies on the mine rocks shows that major rocks in Chador Malu mine area are Metasomatite, Albitite, Diorite, Magnetite and Hematite. The iron ore concentrate contains about 68% iron and 0.045% phosphorus.

Chador Malu drilling fleet Production & Buffer Hole Drilling: DMH, DML and DM45(Rotary system) presplit Hole Drilling: Titon 600 (DTH system) Main drill patterns: Hard Rock: Burden = 6 m & Spacing = 7 m Fractured Rock : Burden = 7m & Spacing = 8 m * ANFO explosive with Dynamite primers are used for blasting.

Chador Malu iron ore mine Drilling pattern for production holes at Chador Malu iron ore mine Hole Diameter (mm) Sub drilling (m) Burden Spacing Charge Density (gr/m3) Stemming Explosive Bottom Charge Hole Depth Bench Height Hole Angle (degree) 251 2.25 6 7 1.0 7.25 ANFO 1 17.25 15 90 Drilling pattern for buffer holes at Chador Malu iron ore mine Hole Diameter (mm) Decoupling ratio Buffer Burden(m) Buffer Spacing(m) Charge Density(gr/m3) Stemming (m) Explosive Hole depth Hole Angle(degree) 165 3 4 1.0 2 ANFO 6 90 Drilling pattern for presplit holes at Chador Malu iron ore mine Hole Diameter (mm) Charge decoupling ratio Cartridge Diameter Presplit Spacing (m) Charge Density (gr/m3) Burden Time Delay (ms) Stemming & Subdrilling Explosive Hole Depth Hole Angle (degree) 114 0.35 40 1.45 1.03 6 200 Azar Powder 15.5 75

Presplit Drilling Operation presplit Holes Production Holes Buffer Holes

A schematic illustration showing drilling and blasting design in Chador Malu mine

A schematic illustration showing of drilling profile in Chador Malu mine

presplit Drill Rigs

Drilling angles 30° 30° -Sideways: 30°/ 30°

Drilling rig position for presplit drilling at Chador Malu mine

Visual presplit evaluation examine the presplit face and adjust spacing or charging with regard to: - smoothness of presplit surface - percent of half-casts visible - occurrence of crest failures occurrence of plane and wedge failures in final wall

The sources of drilling deviations

Drilling deviations in difficult condition Designed hole direction

A schematic illustration showing sources of hole drilling deviations on mine bench Collaring misalignment Collaring offset Planed hole In-hole deviation Incorrect depth Deviation due to collar error

Conventional Drilling Methods in Surface Mines Top Hammer Down the Hole COPROD Rotary 1 2 3 4

Drilling deviations depend on drilling rigs

Double Benches Drilling Using double benches presplit blasting to reduce wall failure and achieve less total drilled meters per tone

Successful Presplit Blasting in an Open Pit Mine

Aitik Copper Mine The Aitik copper mine is situated in Sweden. It is one of Europe's largest open pit copper mines. Associated with the copper, large quantities of gold, silver and since 2008 molybdenum have been mined at Aitik.

Aitik Copper Mine in Sweden Mine Specification Production Started with 2 Mt/y in 1968 and now 36 Mt/y Proven Reserves : 520 Mt Grade: 0.31 % Copper ,0.2 gr/t Gold & 2.0 gr/t Silver Mine Life: 2025 Final pit depth: 400 m Production Holes: 311 mm W/O: 1:1 Pit Slope Design: 46 degree Bench height: 15 m

Presplit drilling pattern Buffer Holes 6 1/2 in Pre-split Holes 5 1/2 in Production Holes 12 ¼ in 5.0 m 10.5 m 15m 15m 16m

Typical presplit Drilling Design , Aitik Copper Mine in Sweden wall 5 ½” Pre-split holes 15 m depth 22 degree incline 4.5 m 4.5 m 5.0 m 6 ½” Buffer holes 15 m depth 6.0 m 10.5 m 12 ¼” Production holes 16 m depth 8.0 m 12 ¼” Production holes 17 m depth

Presplit blasting evaluation Type of Damage Origin Correction Back break around the presplit holes caused no half-casts visible in fracture line Shortage of burden or spacing in presplit line or excessive charging in buffer or presplit holes Modifying burden, spacing and hole charge density Back break visible just around the presplit hole area Detonation pressure in presplit holes was more than rock compression strength Modifying hole charge density and charging method Back break visible just between the presplit hole area Shortage of buffer row spacing Increasing the spacing in buffer row and decreasing charging density in buffer holes Roughness and the irregularity of final wall behind the presplit surface Excessive spacing or shortage of burden in presplit row Decreasing spacing and hole charge density in presplit row Shortage of rock breaking in final wall Excessive burden between presplit and buffer rows Decreasing burden between presplit and buffer rows Excessive joints and cracks at final wall crest High weathering and poor condition of final wall rock Using guide holes between presplit holes or drilling presplit holes with retract bit for fracture control

Half-casts visible remained after blasting of presplit holes

Wall damages due to inappropriate spacing in presplit row

Key Notes Several techniques are used for improvement wall stability in open pit mines which among them, presplit blasting is the most pragmatic and effective approach for tackling this issue in metal open pit mines The influence of geology can never be completely eliminated but certain measures can be taken to ensure acceptable blasting results such as selecting appropriate drill rig to control minimum drilling deviation on presplit row DTH and COPROD drilling systems give less deviation than the other drilling methods thus they could be right choices for presplit drilling Orientation of geological structures has the great influence on the presplit fracture, thus, survey on structural mapping and joint sets is very important to obtain the good final wall in open pit mines Visual evaluation of presplit blasting results and modifying parameters according to mentioned table is crucial to achieve successful results.