HumidiClean. New After 400 Hours After 800 Hours Ionic Bed.

Slides:



Advertisements
Similar presentations
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Advertisements

$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500.
Commissions, sales tax & profit
Lets Play Jeopardy!! TheCategoriesAre Vocabulary.
TORO ID PRE COOLER (Patent Pending) for Air Cooled Condensers Improving Cooling Efficiency and Energy Conservation in Air Cooled HVAC Systems.
Calculation of Gravitational P. E
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
FLUID BED GRANULATION SWITCH CABINET MANUFACTURER : GLATT AG
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Operations Management Maintenance and Reliability Chapter 17
IGVC Power Team (BZZZZT!) Presentation October 17 th Electrical Engineering Senior Projects 1 Nate – Jake – Tim.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
ABENGOA SOLAR Solar Power for a Sustainable World Past, Present, and Future of Solar Thermal Generation Bruce Kelly Abengoa Solar, Incorporated Berkeley,
Equilibrium What is the Equilibrium and why is it important to both producers and consumers?
September Wood to Warmth – Heat Networks Michael Beech TV Energy.
Wood to Warmth – Case Studies Alison Wilshaw, TV Energy 16 February,
A never-ending source of energy. Relatively high energy content A never ending energy source Almost everyone wants to dispose of it Environmental issue.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
How Much Money Do I Need To Make?. Monthly Budget.
Can you explain the ideas
PPC4000 COMBUSTION EFFICIENCY SYSTEM
Presentation Heading Air Source Heat Pumps Jordan Jeewood
Scotch Marine Boiler Design
EN 407. OH 1..
340 Voyager rooftop range Dual Fuel DKD/H Voyager II Voyager III kW Heat Pump Cooling Only Gas Fired
Energy-Efficient Process Cooling
Aquaox ECS series The new standard in ECA technology
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
Khaled Mostafa, ABB Electrical Industries, Nov. 2012
Chapter 3 Supply and Demand. Chapter Objectives Define and explain demand in a product or service market Define and explain supply Determine the equilibrium.
18 SUPPLY AND DEMAND.
Combining Supply and Demand (Ch. 6-1)
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Exhaust Heat Recovery Systems
BOILER TRAINING Mr. Customer – Site specific
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Who We Are Alaska Native Tribal Health Consortium Division of Environmental Health & Engineering June 2011.
Design &Types of Steam Turbines
UCSD Medical Center - Hillcrest Campus Case Study Gerry White Facilities Design & Construction University of California, San Diego.
Energy Efficient Steam Systems
1 © GDC Group Heat Solutions. Source; House Hold budget survey (2004/2005) Irish Heating Market.
Testing Combination Systems CSA P.9 The Not-So Surprising Results CMX- CIPHEX Show Toronto March 22, 2012 Rosalyn Cochrane Senior Standards Engineer Natural.
Solutions for Flaring Reduction Dual-Fuel & Gas Engines
KAUSAR AHMAD KULLIYYAH OF PHARMACY PHM3133 Dosage Design /11 1 Steam as a heating medium
It takes farmer 20 hours to = 1 lb. meat
Lighting concepts – Ballasts and Lighting Controls
To Save Energy Every Time HUMAS – PLN Distribusi Bali.
Residential Light Fixtures ENERGY STAR ® Specifications Additions to Specs Pierrette LeBlanc, Office of Energy Efficiency June 4, 2008.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
HF Series Compressed Air Filters Flows from 20 to 21,250 scfm (34 to m 3 /h) Maximum working conditions of 300 psig & 150°F (21 bar, 66°C)
Figure 1. PX Prices and Total ISO Load (May 15 - August 31, 2000) MW $/MWh.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
JOHN DAY SCREEN AND PASSAGE PROGRAM: CURRENT ISSUES Presented by Michael Jensen John Day Shop Manager.
Equal or Not. Equal or Not
Slippery Slope
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Fundamentals of Cost Analysis for Decision Making
Partial Products. Category 1 1 x 3-digit problems.
LONG-RUN, SHORT-RUN AND DIMINISHING RETURNS Chapter 20 Presentation 2.
Market Data ASHRAE May, Keith Stippich. Global Energy Consumption Global Energy Consumption (+10.9% overall increase)
Institute of Power Systems and Power Economics RWTH Aachen University Univ.-Prof. Dr.-Ing. H.-J. Haubrich Forschungsgemeinschaft für Elektrische Anlagen.
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
The Importance of Distribution. Manifold Position And Vapor Trail.
Process Steam Coil Air Heating. 2 Process Steam Coil Air Heating A Total System Solution Breakthrough Single Supplier Single Service Single Resource TOTAL.
Hilario J. Negrón (787) ext 3223 (787) Measuring Operational Efficiency.
Lecture Objectives: Learn about thermal storage systems
Presentation transcript:

HumidiClean

New After 400 Hours After 800 Hours Ionic Bed

HumidiClean Series 3000 Service Life Cycle Factory set service life cycle is related to: n Steam output capacity per tank n Water hardness

HumidiClean Series 3000 Service Life Cycle Service life cycle n Determines when ionic beds need replacement n Relates to monitoring of Element on Time history n Communicates ionic bed capacity for solids n Current factory standards are 500, 1000, 2000, 3000 hours. n Is field adjustable

Ionic bed

Performance Service: 100% demand on 16 gr/gal hardness water 100% 95.6% hour 731 hours 986 hours % Maximum output

HumidiClean Capacity vs. Operation Hours of Service Percent of Original Output

Energy Savings n Does not require frequent drainage to purge solids n Does not drain to reduce output n Standard drainage once per 24 hours

Energy Consumption Due to Drainage Assumptions n 45 PPH Output n 100% Output n $ 0.045/KW Electrical Costs n Operation 212 days/yr n Incoming water 50°F Drainage Cost Comparison n HumidiClean $22.60/yr n EHU-601 $261.00/yr

IAQ Features Generates high quality steam for distribution. Design incorporates an operating cycle for cartridge replacement, both simplifying and demanding periodic attention. After 72 hours without demand, the unit drains itself and initiates a drying cycle for the ionic beds.

Maintenance Cost Comparison $ PartsLabor HumidiClean $185 Per Season Cleanable $350 Per Season Non-Cleanable $450 Per Season Dollars

HumidiClean

Frame Assembly (MickStack)

Quick Stack Header

Armstrong Frame Assembly

Unfired Steam Generator Benefits of Total Armstrong International Package n Single Source Ownership n Armstrong International Inc. name assigned to entire package n Improved equipment Coordination

Unfired Steam Generator Benefits of Total Armstrong International Package n Improved humidifier performance with Series 1000/9000 Optimum Control More capacity per unit Decreased Maintenance Greater Reliability F Reduced Cost/lb of Output

Unfired Steam Generators Information Needed to Quote n Inlet Steam Pressure n Secondary Steam Pressure n Humidification Load Required n Type of Control Desired n Materials of Construction (Is water DI?) n Supply Water Temperature

Unfired Steam Generator Disadvantages n Initial Cost n Blowdown Necessary n Need Central Boiler

Unfired Steam Generator Components n Vessel n Coil n Controls n Jacket n Insulation n Base

Unfired Steam Generators Options n Materials n Alarm Bell n Remote Control n Feed Water Solenoid n Feed Water Pump & Receiver n Feed Water Pump n Auto Blowdown -- Timer n Auto Blowdown -- TDS Sampling n High Water Cut-Off