Sector Processor Status Report

Slides:



Advertisements
Similar presentations
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Advertisements

Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 CSC Muon Trigger - Annual Review Jay Hauser, with many slides from Darin Acosta and Stan Durkin.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
CHEP March, B. Scurlock, University of Florida1 D. Acosta, V. Golovtsov, M. Kan, A. Madorsky, B. Scurlock, H. Stoeck, L. Uvarov, S.M. Wang University.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
Sector Processor 2002 Development and Test Plans Darin Acosta.
SR/SP Project Overview Walk through required on-board functionality and validation checks Latency Interface requirements and validation tests Production.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CSC Endcap Muon Port Card and Muon Sorter Upgrade Status May 2013.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
Test Beam Wrap-Up Darin Acosta. Darin Acosta, University of Florida 18 June 2004 USCMS Meeting 2 Agenda n Darin/UF: General recap of runs taken, tests.
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF Mikhail Matveev Rice University 17 August 2012.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
SP04 Production Lev Uvarov RICE Muon Trigger Meeting August 27, 2004.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Upgrade of the CSC Endcap Muon Port Card with Spartan-6 FPGA Mikhail Matveev Rice University 30 April 2012.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
The CMS Modular Track Finder (MTF7) Trigger Board D. Acosta, G. Brown, A. Carnes, M. Carver, D. Curry, G.P. Di Giovanni, I. Furic, A. Kropivnitskaya, A.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
Combined SR/SP UF Fits all of previous SP board logic! Main FPGA
Upgrade of the CSC Endcap Muon Port Card and Optical Links to CSCTF
Muon Track-Finder Trigger
CMS EMU TRIGGER ELECTRONICS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Muon Trigger - Annual Review
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
September CSC Beam Test Report
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
TMB, RAT, and ALCT Status Report
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
Track Finder Crate, Backplane and Parts
Preliminary CSC Trigger Results from September Testbeam
Regional Cal. Trigger Milestone: Production Complete - U. Wisconsin
CSC Trigger Meeting Summary
SP Main FPGA & DT transition card design status
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

Sector Processor Status Report Status of Tests  Acosta Schedule  Acosta SP Latency  Uvarov Design changes  Uvarov DT/CSC transition card  Uvarov Status of cosmic ray test stand  Stoeck Simulation results  Drozdetski Track-Finder GUI  Gray

D.Acosta, University of Florida SP Tests Completed MPCSP optical link tests Demonstrated to work April ‘03 in single crate using crystal-oscillator clock (~1 error/hour) Optical Link tests with TTC Demonstrated to work error-free during September beam test with home-built PLL+VCXO and with latest QPLL (TTCRq) No errors DT/CSC Data Exchange Test Demonstrated to work during September in both directions, with only a few minor problems with swapped bits (DT TF), connectors, and dead chips Repeat with longer cables, new transition card (see Golovtsov’s talk) and add Track-Finding tests 5/9/2019 D.Acosta, University of Florida

Recently Completed SP Tests Uvarov, Stoeck LUT Tests (SR and PT LUTs) Validated loading and read-back of all 45 SR LUTs using random numbers and simulated muon LUT files Multicast writing to all 15 Local Phi LUTs simultaneously, as well as Global Phi and Global Eta triplet LUTs Caught pin assignment error on mezzanine card layout, fixed in firmware Validated loading and read-back of 3 PT LUTs using random numbers and simulated Pt LUT file Good news, since we had to procure entire production order to get chips Tested real-time access of memory Address data loaded on just 1 BX 5/9/2019 D.Acosta, University of Florida

Recently Completed SP Tests SP Track-Finding Logic Test Validated SP track-finding logic Downloaded random data and simulated muon data into 512 BX input FIFO, read-back and compare output FIFO No discrepancies in 1.2M random events No discrepancies in 13K single muon events, or 4K triple muon events (3 single muons piled up) Validation period much faster than for first prototype since firmware and model are written with same piece of code Validated Verilog model against original C++ model Some bugs found in original model! Some residual discrepancies observed for high multiplicity events Differences in sorting for tracks in DT/CSC overlap (understood) Ghost-busting in ME1 improved Was partially working (only for ME1-ME2 tracks). Now corrected. Bunch-crossing analyzer is still under study/development Not even in original model Everything will be propagated to full ORCA, drop old model. Madorsky, Scurlock, Acosta 5/9/2019 D.Acosta, University of Florida

D.Acosta, University of Florida Remaining SP Tests Sector Processor  Muon Sorter Awaiting test results from Rice Can now test SP with PT LUT and multiplexer installed Complete SP functionality test “Chain test” of all onboard SP logic: Front FPGAs, SR LUTs, SP logic, PT LUT, with comparison against simulation Scheduled to take place this January VME block transfer Will decrease time to load LUTs VME crate multicast Load LUTs on multiple SP’s in crate at same time DDU FPGA bus validation Collect all SR input data and SP output data into FIFO in DDU FPGA (but still read out through VME) Needed for June’04 beam test Integration tests with redesigned DDU to occur after OSU completes next prototype 5/9/2019 D.Acosta, University of Florida

Other Interesting Tests Multiple MPC  SP Test Could be done any time we have several MPC’s in TF crate Verify correct synchronization between multiple boards (even better would be to have several peripheral crates…) SP  SP Test Stress-test of all 15 trigger links on SP: one SP as data-generator and one SP in normal mode Could be done anytime Multiple SP  MS Test Verify correct transmission, timing, and read-back from multiple sources Could be done once single SP  MS test validated Cosmic-Ray and Beam Tests Complete chain-test with detectors and fully operational SP Demonstrate self-triggering with tracks in multiple CSC’s Needed for June’04 beam tests 5/9/2019 D.Acosta, University of Florida

Sector Processor Schedule Completion of SP board tests: Feb ’04 Completion of major production design changes: May ’04 Lev at UF Completion of redesigned DT/CSC card: May ’04 Victor at UF Firmware changes for beam test: June ’04 2004 beam test: June ’04 Second DT/CSC test (?) June ‘04 Start of production: Sept ’04 Completion of production and board tests: Mar ‘05 5/9/2019 D.Acosta, University of Florida

D.Acosta, University of Florida Documentation General information and links: http://www.phys.ufl.edu/~acosta/cms/trigger.html Lev’s page on SP02 design specification http://www.phys.ufl.edu/~uvarov/sp_spec/SP02_spec.htm Specification of SP02 registers and VME/CCB interfaces: http://www.phys.ufl.edu/~uvarov/sp_spec/LU-SP02_Backplane_Interfaces_031210.pdf http://www.phys.ufl.edu/~uvarov/sp_spec/LU-SP02_Backplane_Interfaces_030901.pdf Specification of main SP02 FPGA VME interface: http://www.phys.ufl.edu/~madorsky/sp/Main%20FPGA%20VME%20interface.doc 5/9/2019 D.Acosta, University of Florida