Injection Region BLM changes

Slides:



Advertisements
Similar presentations
LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
Advertisements

LHC UFO Study Working GroupSeptember 15 th UFOs since TS#4 LHC UFO Study Group Tobias Baer September, 15 th 2011 Acknowledgements: B. Goddard, S.
Shielding studies at TDIs Results from Rob Appleby – Studies made for P8 (LHCb) – Aimed to look at what shielding can improve Local LHC BLMs LHCb RICH.
LIBD MeetingNovember 29 th MKI UFOs LIBD Meeting Tobias Baer November, 29 th 2011 Acknowledgements: M. Barnes, C. Bracco, N. Garrel, B. Goddard,
UFO Study Working GroupAugust 12 th Update on UFO Studies Tobias Baer August, 12 th 2011 Acknowledgements: G. Arduini, W. Bartmann, M. Barnes, C.
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Injection losses and protection Evian, 12-Dec-11 W. Bartmann R. Appleby, P. Baudrenghien, C. Bracco, B. Dehning, A. Di Mauro, L. Drosdal, J. Emery, E.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
Eva Barbara Holzer IEEE NSS, Puerto Rico October 26, Beam Loss Monitoring System of the LHC Eva Barbara Holzer, CERN for the LHC BLM team IEEE Nuclear.
1 BLM 2 BLM 4 BLM 2 BLM 2( BLM+SEM)3 BLM 2 BLM 4 BLM 3 BLM1 (BLM+SEM)3 BLM 2 BLM 1 SEM 1 BLM 1 (BLM+SEM) 1 BLM BPM 1 BLM 2 BLM 4 BLM2 BLM 2( BLM+SEM)3.
4 th BLMTWG Meeting, January 13, 2015 by B. Auchmann, A. Bertarelli, R. Bruce, F. Cerutti, B. Dehning, L. Esposito, E.B. Holzer, M. Kalliokoski, A. Lechner,
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
Current (recycler) timing/trigger system appears to be sufficient for TeV BPMs - add injection event to beam sync - TSG FPGAs nearly full, but dropping.
B. Auchmann, O. Picha, Joint CWG/BLMTWG Meeting August
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
Eva Barbara Holzer MPP, CERN Eva Barbara Holzer 1 Approval procedure for master threshold changes.
BLM - MPP review, BLM Team, B. Dehning1 BLM – MPP review Hardware nonconformities and safety Equipment failures IP 3 signal cross talk IP 2 sanity.
Modifications to the Threshold Calculator Application Matti Kalliokoski 15 th BLM Thresholds WG Meeting 26/05/2015.
Mariusz Sapinski (LOAO) FAIR Commissioning and Control WG GSI, November 18 th, 2015 Experience with LHC Beam Loss Monitoring system (and lessons for FAIR)
BLM “sunglasses” Filter Box. Current layout: BLM crates CIBU units Rack BY02 / SR8 BIC crate ( UA83 ) User_Permits Maskable channel Unmaskable channel.
AOB: Adjustments to BLM Thresholds in Light of Run-2 Experience with UFOs B. Auchmann, J. Ghini, L. Grob, A. Lechner, D. Wollmann. 118 th MPP,
Eva Barbara Holzer July 16, LHC MPP Eva Barbara Holzer for the BLM team LHC MPP CERN, July 17, 2010 Proposal on Threshold Corrections for RC Filters.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Review of the Monitor Factors Matti Kalliokoski 26 th BLM Thresholds WG Meeting 03/11/2015.
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
Eva Barbara Holzer MPP, CERN July 31, Eva Barbara Holzer, CERN MPP CERN, July 31, 2009 BLM System Audit Sequel.
如何利用图书馆 ——— 海南师范大学图书馆( 2014 ) ——— 海南师范大学图书馆( 2014 )
E.B. Holzer BLM Meeting: Q & A March 20, Questions and Answers.
How do you get here?
Fibre Beam Loss Monitoring system development BI - day 10 March 2016 M. Kastriotou, E. Nebot del Busto M. Boland, F. S. Domingues Sousa, E. Effinger, E.B.
Beam Loss Monitor activities at CTF3 and the Australian Synchrotron CLIC Workshop 18 January 2015 M. Kastriotou, E. Nebot del Busto M. Boland, E.B. Holzer,
Eva Barbara Holzer LHC Machine Protection ReviewSeptember 6, Eva Barbara Holzer LHC Machine Protection ReviewSeptember 6, Eva Barbara Holzer.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Current BLM Threshold Families 1st BLM Thresholds WG Meeting Matti Kalliokoski.
Overview of LHC Beam Loss Measurements
The TV Beam Observation system - BTV
BEAM LOSS MONITORING SYSTEM
J.-L. Sanchez Alvarez(PSB-EIC)
Overview of the project
Injection region BLMs – ECR
Disabling Rules.
HARMONICS AND FILTERS.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
BEAM LOSS MONITORING SYSTEM
الاسبوع الإرشادي.
Thursday morning – optics correction
Interpretation and use of BLM Data
Remote setting of LHC BLM thresholds?
Agenda 9:00-10:00 Beam Interlock System Changes Following the 2006 Audit Benjamin Todd 10:00-11:00 Beam Dump System follow-up from the 2008 Audit Jan Uythoven.
SEM monitors tests PSI February MeV protons
Alan Fisher APE Meeting
Test and start‐up procedures
BLM changes HV software interlock (SIS)
Sensitivity tests of BLM_S chamber in PSB dump
Week 35 – Technical Stop and Restart
Why do BLMs need to know the Quench Levels?
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Machine Protection during Beam Commissioning
Beam Loss Simulations LHC
Warm Magnet Thresholds
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Signal Conditioning.
Report on Beam Loss Monitors
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Tunnel hardware installation
Shall we modify BLM Thresholds on Superconducting Magnets?
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Electron Ring IP Region Optics
Presentation transcript:

Injection Region BLM changes E.B. Holzer MPP threshold WG 9.3.2011

Triplet at Over-Injection Chicane in IP8 IP8 + mirrored signals from IP2 MQX MQX MQX MQX MBX

Over-injection

  BLMEI.04L2.B1E20_TDI.4L2.B1 (disconnect from BIS or change monitor location) BLMEI.04L2.B1E10_MBXA (RC filter or disconnect from BIS) BLMEI.04L2.B1E20_MBXA (increase 450 GeV thresholds) BLMQI.03L2.B2I30_MQXA (increase 450 GeV thresholds) BLMEI.04R8.B2E20_TDI.4R8.B2 (disconnect from BIS or change monitor location) BLMEI.04R8.B2E10_MBXB (RC filter or disconnect from BIS) BLMEI.04R8.B2E20_MBXB (increase 450 GeV thresholds) BLMQI.03R8.B1I30_MQXA (RC filter)

A. Nordt presentation on “BLM sunglasses LIB meeting 15.02.2011

A. Nordt presentation on “BLM sunglasses LIB meeting 15.02.2011

A. Nordt presentation on “BLM sunglasses LIB meeting 15.02.2011

A. Nordt presentation on “BLM sunglasses LIB meeting 15.02.2011

A. Nordt presentation on “BLM sunglasses LIB meeting 15.02.2011