LINGO LAB 3.

Slides:



Advertisements
Similar presentations
Aggregate Planning. Dealing with the Problem Complexity through Decomposition Aggregate Planning Master Production Scheduling Materials Requirement Planning.
Advertisements

Transportation simplex method. B1B2B3B4 R R R Balanced?
IENG442 LINGO LAB3.
© 2004 Prentice-Hall, Inc. 8-1 Chapter 8 Aggregate Planning in the Supply Chain Supply Chain Management (3rd Edition)
Aggregate Planning in a Supply Chain
3. Aggregate Planning. Aggregate Planning  Provides the quantity and timing of production for intermediate future Usually 3 to 18 months into future.
Chapter 12 Aggregate Planning.
PRODUCTION AND OPERATIONS MANAGEMENT
Aggregate Planning in a Supply Chain
Aggregate Planning.
1 Inventory Control for Systems with Multiple Echelons.
Aggregate Planning Ash Soni ODT Department Kelley School of Business.
Chapter 8 Aggregate Planning in a Supply Chain
AGGREGATE PLANNING (from Course Production Analysis) Advanced Production Planning Models 1.
SE 303 Lab Multi-Period Financial Models Production planning problem.
INVENTORY SYSTEMS. Assume periodic review, i.i.d. random demands, constant (possibly non-zero) lead times and full backlogging. When to order? How much.
ISEN 315 Spring 2011 Dr. Gary Gaukler. Review: Prototype LP Problem Desk manufacturer Regular and rolltop desks, made of wood Regular: 20 sqft pine, 16.
Modeling and Optimization of Aggregate Production Planning – A Genetic Algorithm Approach B. Fahimnia, L.H.S. Luong, and R. M. Marian.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 13 Aggregate Planning.
12 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Importance of Inventory One of the most expensive assets of many companies Can be 50%
Linear Programming Topics General optimization model LP model and assumptions Manufacturing example Characteristics of solutions Sensitivity analysis Excel.
3.5 – Solving Systems of Equations in Three Variables.
OM4-1Aggregate Planning Chapter 14. OM4-2Aggregate Planning Planning Horizon Aggregate planning: Intermediate-range capacity planning, usually covering.
Operations Management
Managing Kanban Systems Two primary control parameters for a Kanban System. Kanban container size (n i ) Number of Kanbans (k i )
OPERATIONS RESEARCH Linear Programming Problem (SOLVED PROBLEM)
Introduction. MS / OR Definition: Management Science (MS) or Operations Research (OR) is the scientific discipline devoted to the analysis and solution.
Chapter 4/1 Chapter 4 Planning the Production Program.
 The McGraw-Hill Companies, Inc Irwin/McGraw-Hill 1 Facilities and Aggregate Planning Chapter 12 Due Date!
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Aggregate Planning and Master Scheduling
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
D Nagesh Kumar, IIScOptimization Methods: M6L5 1 Dynamic Programming Applications Capacity Expansion.
Chapter 7 Problem 38 Part A Decision Variables: S – Standard grade material P – Professional grade material Objective: Minimize total cost: 7.50S P.
PowerPoint presentation to accompany Chopra and Meindl Supply Chain Management, 5e 1-1 Copyright ©2013 Pearson Education, Inc. publishing as Prentice Hall.
Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering Fall, 2015.
1 Chapter 13 Production Planning Supplemental Slides.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
14-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Aggregate Planning and Master Scheduling McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 7 Aggregate Planning.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Aggregate Planning. Session Break Up Aggregate Planning Master Production Schedule.
Simplex Method for BLENDING OF AGGREGATES The contract specifications of a building project require that the course aggregate grading for concrete mixing.
SIMULATION EXAMPLES INVENTORY SYSTEMS.
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Problem 1 Demand Total There are 20 full time employees, each can produce 10.
Chapter 12 Section 1.
Aggregate Planning Chapter 13.
Chapter 14 Aggregate Planning.
BUAD306 Aggregate Planning.
Operations Management
Basic Strategies Level capacity strategy: Chase demand strategy:
Chapter 8 Aggregate Planning in the Supply Chain
13 Aggregate Planning.
Chapter 8 Aggregate Planning in the Supply Chain
9 Sales and Operations Planning: Planning Supply and Demand in a Supply Chain.
Aggregate Planning FAISAL FARIS BIN RAHIM
OUTLINE Questions? Midterm Results Go over Midterm Go over Homework
Solving Equations by Factoring and Problem Solving
Aggregate Production Planning by Linear Programming: Terminology
Chapter 8 Aggregate Planning in the Supply Chain
Chapter 7 Jeopardy! Solving Equations
SIMULATION EXAMPLES INVENTORY SYSTEMS.
GEOP 4355 Distribution Problems
Dr Sh Salleh bin Sh Ahmad
PRODUCTION AND OPERATIONS MANAGEMENT
Solving Equations 3x+7 –7 13 –7 =.
Operations Research Models
Planning the Production Program
Presentation transcript:

LINGO LAB 3

Solving the model of a production plan by lingo

The Production model 1 At: fixed setup cost in period t Yt: 0, if there is no production in period t and 1, if there is production in period t Pt: unit variable production cost in period t Xt: amount of production in period t Hk: Inventory holding cost in period k Uk: amount of inventory at the beginning of period k Bk: backlogging cost in period k Vk: amount of backlog at the end of period k Dt: required demand in period t Ct: available capacity in period t

Sets and parameters of the problem K={0,1,2,3,4} A={5000, 7000,8000,4000} D={250,300,400,500} C={500,600,800,900} P={25,30,25,20} H={3,4,5,2} B={5,6,6,7} Decision variables: X={x1, x2, x3, x4}, U={U0,U1,U2,U3,U4}, V={V0,V1,V2,V3,V4}, Y={Y1,Y2,Y3,Y4}

The objective function and constraints The objective function is to minimize summation of all costs that include fixed setup costs, production costs, inventory holding costs and backlogging costs: The first constraint satisfies demand and is a simple product flow balance equation that can be described by the figure below, and the second constraint avoids capacity violation.

Writing the model in lingo

Solution of the model ii

The Production model ii K={0,1,2} A={6000, 8000} D={500,400} C={600,700} P={40,50} H={7,9,8} B={4,7,5} Decision variables: X={x1, x2,}, U={U0,U1,U2}, V={V0,V1,V2}, Y={Y1,Y2}

Writing the model in lingo

Solution of the model ii

The Production model iii We have to prepare an aggregate plan for the future 4 periods. The forecasted demands are D= {250, 300, 330, 270}, Unit production costs are P= {25, 30, 32, 28}$, Fixed setup costs are A= {5000, 4000, 3750, 4500}$. Unit inventory holding costs are H= {5, 5, 5, 5} $ Unit backlogging costs are B= {7, 6, 8, 5} $ Production capacities are C = {500, 500, 600, 600}.   The system may increase its production capacity in a period by 200 applying overtime. In overtime production the variable production cost of a product increases by 5$. Moreover, The system may use subcontracting option. Unit subcontracting cost is 40$. Develop the Model of the problem.

The Production model iii

Writing the model in lingo

Solution of the model iii