Problems identified by NRAs that may lead to new infrastructure needs

Slides:



Advertisements
Similar presentations
Bruxelles, 13 February 2008 Regional Market and Cross Border Luigi de Francisci TERNA - Rete Elettrica Nazionale S.p.A.
Advertisements

Assessment of differences in market designs in the CS region Milan 18 July 2008.
Berlin, 4 December Source: ENTSO-E Ten-Year Network Developemnt Plan 2012.
Click to edit title Click to edit sub-title The European Network of Transmission System Operators Stockholm 14th of September 2009 Teun van Biert - Convener.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Pj Overview of Wind Energy Grid Integration in Australia ADB Wind Energy Grid Integration Workshop Sept 23, 2013 Dr Geoff James Specialist, Renewable Energy.
TYNDP SJWS #3 Demand TYNDP – 3 rd SJWS 08 March 2012 ENTSOG offices -- Brussels.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Sanjay Garg General Manager PGCIL/ Ministry of Power
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
Energy Agency of the Republic of Serbia
Lecture III: Energy Security of V4 What is Visegrad 4? Energy cooperation of V4 V4 as a litmus test for Internal.
UPDATES ON THE LATEST DEVELOPMENTS IN LITHUANIA Aistija Zubaviciute NCC, Lithuania 11 th Baltic Electricity Market Mini-Forum 1 st October 2010.
SLED Electricity Modelling results – Serbia László Szabó, András Mezősi
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
Energy Economics Group, TU Wien
Dena Grid Study II Integration of Renewable Energy Sources in the German Power Supply System from with an Outlook to 2025 Jaakko Iivanainen.
Nord Stream 2 – A risk for the internal market and security of supply?
Agenda TSOG 8th November
Operation of power systems with high shares of wind power
Florian Sauter-Servaes
GSR022: Review of Security and Economy Required Transfer Conditions
State Electricity Regulatory Commission BOSNIA AND HERZEGOVINA
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
PHYS-E6572 Advanced Wind Power Technology Eero Vesterinen 79925N
Matthew Wittenstein Electricity Analyst, International Energy Agency
Challenges of integrating Variable Renewable Energy Sources (V-RES)
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Review of Abnormal MCPEs
SLED Electricity Modelling results – Serbia
Ben Voorhorst, President, ENTSO-E
ISO New England System R&D Needs
STATE ENERGY AND WATER REGULATORY COMMISSION
DCC Cluster/Working Group Energy MTDS (GoT) priorities for the sector
North sea wind power hub
Public workshop: CBA 3.0 –come and improve with us the transmission and storage assessment methodology Brussels 07 November 2017.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
RG Continental Central South
Meeting of NSOG Electricity Regional Groups Preparation of the 3rd PCI list - Identification of Infrastructure Needs Brussels, 27 October 2016.
EU-IPA12/CS02 Development of the Renewable Energy Sector
TYNDP: Ten-Year Network Development Plan 2016
Additional clarifications on economic and adequacy running hours
efficient capacity allocation method
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
Views from ACER and NRAs on “problems” in the NSI West region
Walter Boltz Chairman, CEER Gas Working Group
Changes to Reserve Level Declaration Guidelines
RE Grid Integration Study with India
HEADING TOWARDS SUSTAINABLE AND DEMOCRATIC ELECTRICITY SYSTEMS
Byron Woertz, Manager—System Adequacy Planning
Problems identified by NRAs that may lead to new infrastructure needs
Byron Woertz, Manager—System Adequacy Planning
Ahmad Elberry, Abdelghani Aljayyousi
Problems identified by NRAs
Projects of Common Interest
Jim Mcintosh Director, Executive Operations Advisor California ISO
SUMMER OUTLOOKS 2019 Lea Dehaudt, Moderator ENTSO-E
Problems identified by NRAs
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
July update JANUARY 2019.
What happened in Portugal’s recent record-breaking solar auctions?
Projects of Common Interest
XBID – A review of our 1st year and future plans
Main needs of electricity system of the Czech Republic
Projects of Common Interest
Looking to the power system future An ENTSO-E perspective
Presentation transcript:

Problems identified by NRAs that may lead to new infrastructure needs 25/10/2016 NSI East Regional Group Meeting

Problems and aspects - electricity Problem categories Aspects to be assessed when deciding a need Price spreads For the past and the present: - Actual price spreads (both directions, representative of seasonal congestions) For the assessment of future time horizons: - The curves “SEW increase over cross-border capacity increase” - In case such a curve is not available, expected “marginal cost difference (€/MWh), accounting for both directions and taking into account the size of the bidding zones and the current market conditions. RES integration - Curtailments (with effect not accounted for in the curves above)> x GWh (taking into account the generation mix across boundaries) Security of supply - System adequacy - System stability (including local network problems)

Overview of NRAs input Views from NRAs were collected via an ACER questionnaire between 26 Sep and 18 Oct. For the NSI East region the following NRAs provided input: ECA (AT), ERO (CZ), AEEGSI (IT), Aze (SI), ERO (PL), MEKH (HU) Disclaimer: not all NRAs provided feedback for the exercise, therefore the list of problems presented herein is not complete. The absence of a report by an NRA may not reflect an absence of a problem in the specific region.

Specific problems identified 1. Price spreads (a) Problems Supporting facts HU: Price spreads on the HU-SK and HU-RO border Actual price spreads: In most cases (70%), day-ahead electricity hourly prices are higher (or equivalent) in Hungary both in the HU-RO and the HU-SK relation. IT: Historically, a significant price spread occurs at the Northern Italian border (AT-IT 2014: 18,7 Eur/MWh. 2015: 20,7 Eur/MWh). Historic figures, and for the future, the TYNDP 2016 identifies the Northern Italian border as one of the main boundaries. The target capacity estimations range between 10 - 13.5 GW for each 2030 vision. A reduction of the cost spread is expected in all visions, and particularly in vision 3 and 4. A more detailed analysis of the target capacity is necessary.

Specific problems identified 1. Price spreads (b) Problems Supporting facts SI: The Slovenian transmission grid is subject to very high transits of electricity (>60% of domestic peak consumption). Although NTC at the Slovenian borders is much higher than 10% of installed production capacity, direct access to all electricity markets where permanent price spread exist is not guaranteed with the existing infrastructure. PL: Loop flows minimise the possibility of trading the energy on PL<=>DE+SK+CZ profile, in such a way that the GTCs on the borders are not available.

Specific problems identified 2. RES integration (a) Problems Supporting facts AT: The fast increase of renewable (mainly PV and wind) generation capacity combined with a slower network development lead to bottlenecks, especially related to N-S flows, which influence might in turn influence SoS and market. See e.g. technical report issued by ENTSO-E in the frame of the bidding zone review. HU: interconnector capacities are decreased by loop-flows Loss of SW indicated in the latest Market Monitoring Report. See also the technical report issued by ENTSO-E in the frame of the bidding zone review. IT: Congestion at the network boundary Center South Italy - Center North Italy (about 2 Euro/MWh price spread in 2015) related to RES overgeneration in Southern Italy and consequent RES spillage (about 50 GWh/year in the period 2013-2015) Historical figures. For the future, both the EU TYNDP 2016 and the Italian plan 2016 indicate an increase of congestion from Center-South to Center-North, with an expected frequency around 25% of time, i.e. about 2200 hours/year (2020 and 2025). "Southern" RES will not reach Northern Italy and neighbouring markets. However, the size of cross-border impact is still to be assessed.

Specific problems identified 2. RES integration (b) Problems Supporting facts DE: RES integration within DE as well as the integration of RES in Scandinavian countries leads to high N-S flows. Within DE the internal HVDC links are used to transport this energy.

Specific problems identified 3. Security of Supply (a) Problems Supporting facts CZ: Loop flows originating from German-Austrian trading zone burden the Czech grid leading to a need for construction of phase-shifters and strengthening of internal lines. It’s important to note that non-infrastructure related solutions should be viewed as complement rather than substitution of infrastructure. Difference between scheduled and real cross-border power flows on individual interconnectors. HU: a. Local potential problems e.g. at Northern Hungary; b. import dependency, i.e. lack of power generators and lack of prospects of generators to be built in the future in North-East Hungary. a. relation (non-compliance or the danger thereof) to provisions in national grid codes or the ENTSO-E Operational Handbook b. import-export balance IT: The Italian Development Plan 2016 assesses system inertia and highlights local problems in specific areas of the Italian network. There is limited availability of resources for voltage regulation and short-circuit power in some areas of Italy, especially in Sardinia. The cross border impact of SoS problems is not defined at this stage, thus we deem not possible to assess it. We regret that the draft TYNDP 2016 does not provide any quantification of the SoS problems. In 2015, significant frequency (i.e. > 30% of time) of undervoltage (i.e. below 390 kV) was recorded in Campania (north of Naples) and in Southern Sardinia.

Specific problems identified 3. Security of Supply (b) Problems Supporting facts AT: The aging networks need refurbishment and upgrading. To maintain SoS during planned outages of key lines new lines including interconnections must increase. SI: The Slovenian transmission grid is subject to very high transits of electricity, which may cause operational security issues. PL: Loop flows on the DE+SK+CZ profile (caused by trade in the Germany – Austria bidding zone) cause the necessity of redispatch in Polish system and limit significantly possibility to import energy.

NSI East – map of reported problems PL DE CZ SK AT HU SI RO IT HR BG EL CY