News from Technical Coordination

Slides:



Advertisements
Similar presentations
AMATEUR RADIO TRAINING
Advertisements

Irish IPv6 Task Force - Irish IPv6 Task Force Introduction to IPv6 Fundamentals.
Thalia M. Thomas & Amiah D. Cooke Gang Violence 2/7/12.
Status of the project E xtreme E nergy E vents area of Bari Prof. F. Romano - Politecnico di Bari & INFN Bari Dott. M. Abbrescia – Ricercatore Università.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Cooling Channel Count Recap Cooling channel components # Engineering? Absorber: temperature 8*3 yes pressure 2*3 yes He temp 2*3 level 8*3 yes length (optical)
TOF offline and calibration A. De Caro (University and INFN of Salerno)
DOE Review Caltech LXe DAQ. DOE Review Caltech Temperature and Pressure Monitoring RTD pressure sensor LXe N2 gas LN Torr MKS.
ORGANIZATIONAL DESIGN How organizations structure sub- units and coordination and control mechanisms to achieve their strategic goals.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: On-Orbit Calibration and.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.

TAU status 14/2/2012. Temperature behavior in red Delayed response No A/C T=24-25 C 19 o C Cold A/C T=19-20 C 30 o C Hot A/C T=28-32 C 16:30 18:00 04:00.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ALBA Synchrotron – 17 June 2010 Centro Nacional de MicroelectrónicaInstituto de Microelectrónica de Barcelona First Measurements on 3D Strips Detectors.
6th Annual Faculty Best Practices Showcase, 2005 Organized by Hosted by Applying the visual, verbal and kinesthetic modes of perception to interpretation.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Wireless Data Communication in Substations Mladen Kezunovic (P.I.) Costas N. Georghiades Alireza Shapoury PS ERC PSerc Review Meeting Texas A&M University.
SCCOOS Website Training Meteorological Stations. 1. Go to the Recent Meteorological Stations and Observations webpage at
Group 5 Taaruf Hussain Amjad Hussain Rukhsana Firdous Waheed ur Rehman Shairyar Hussain Ansari.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Air and Weather. What is in the air? Meteorology Study of Weather.
Task Card Templates Choose one slide below each week to create a task card for a Tech Tub station. Make sure to fill in the “Notes” below the task card.
Steven Worm – RutgersMar 25, CMS Testbeam at Fermilab: Status and Plans o Testbeam Setup Status –Big pieces are now in place: telescope, Si, ROC,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Masks and Costumes.
1. Last measurement of the distances between schools gave following results: G.Ferraris – A.Volta 1.41 km A.Volta – M.D’Azeglio 1.15 km G.Ferraris – M.D’Azeglio.
A Device for Detection of Acoustic Signals from Super High Energy Neutrinos Presenter: Presenter: G.L.Pan'kov Applied Physics Institute of Irkutsk State.
Fermi Race to build your own NASA satellite! Lynn Cominsky Sonoma State University.
S. K. PalDCS WORKSHOP 17 JUN 2002 FRONT VIEW PMD Layout and Design Two planes: Veto + PreShower Gas detector with hexagonal cells Cell cross section: 0.22.
EEE telescope time resolution D. De Gruttola, M.P. Panetta, C. Cicalò.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
Sextupole Single Coil Test Results Giovanni Volpini on behalf of the LASA Team Giovanni Volpini, CERN, 22 April 2015.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
RIGEL: an Rpc-like sIgnals GEnerator for Laboratory testing N.Montes P.Amado, P.Fonte, J.A.Garzón, A.Gil University of Santiago de Compostela -Spain- labCAF.
Extreme Energy Events M. Abbrescia Extreme Energy Events Data taking 20 BILLIONS candidate tracks!
Date of download: 7/9/2016 Copyright © ASME. All rights reserved. From: Experimental Investigation of Boiler Pressure Behavior in Closed-Open-Closed System.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Extreme Energy Events M. Abbrescia Extreme Energy Events Meetings  Our technical meeting in Grosseto postponed: Morning 15 April  same day.
Presentation on Marketing Mix
Run 3 Statistics EEE Run coordination meeting esteso alle scuole
LAV front-end and readout status
Data taking An exceptional month of March!.
Multigap Resistive Plate Chambers for EAS study in the EEE Project
Quicken Technical Service More info :
Quicken technical support number SDFGFFGGDF. QUICKEN TECHNICAL SUPPORT NUMBER QUICKEN TECHNICAL SUPPORT NUMBER
University of Illinois, at Urbana-Champaign
Sector 29 PS Systems Stability Tests for LCLS
Election IT Training DEO/RO/ARO 10/09/2018
PREDICTING THE WEATHER
Classification of Matter Task Card Classification of Matter Task Card
Project Name Coordinator: Participants:
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
#1 #2 #3 Solve: 21 ÷ Solve: Solve: 3 (7 + 4) 12 ÷ 3 – 2 + 1
RUN-4 has finished About 70 (!!!) billions of candidate tracks collected up to now About 20 (!!!) billions of candidate tracks collected in RUN-4.
Wind direction and speed, Wind is named from the direction it is coming from.
HIV Patient ART Monitoring Meeting: International Conference Centre, Geneva March 2004 Summary.
Splash.
Research program on Single-Bubble Sonoluminescence (SBSL)
ЕФЕКТИВНА РЕВИЗОРСКА ПРОГРАМА ВО ОБЛАСТА НА СППФТ
Magnet, Support and Infrastructure
Agenda Unit 3 Extra Credit Quiz WED 10/14 (short period)
Agenda Today: Intermolecular Forces, Properties of Liquids: finish summary for HW KMT Independent Study assigned via google docs: complete by WED 11/4,
Aim: Completion of Performance Task 1
Sector 29 PS Systems Stability Tests for LCLS
RUN 5 Fabrizio Coccetti Run Coordinator
I have… I have… Who has 3:40? Who has 12:20? I have… I have…
Presentation transcript:

News from Technical Coordination D. De Gruttola Centro Fermi

Summary Material for new stations New power supply New FEA cards Temperature and pressure monitoring “Masking” of noisy channels Setup for task force Material of all telescopes

Material for new stations https://sites.google.com/centrofermi.it/3etech/home/requests?authuser=0

New power supply

New power supply

New power supply

New PS and V and I monitoring

New FEA cards

T and p monitoring

Noisy channels

Setup for task force

https://sites.google.com/centrofermi.it/3etech/home/table-3?authuser=0 Telescopes material https://sites.google.com/centrofermi.it/3etech/home/table-3?authuser=0