OBD Correspondence Group(CG)

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

1/8 AND, OR and NOT b How many boys? b How many girls? b How many blue? b How many red?
Program Management Office Department of Innovation & Technology City of Boston Kickoff Meeting.
Standard Workflow Scheme v2.0. This is an interactive presentation of the Standard Workflow Scheme v2.0. Feel free to click on the boxes to see the possible.
Phase Difference = Phase Difference = 0.05.
Report from IWG on Environmental and Propulsion Performance Requirements for Light vehicles (EPPR) 69 th GRPE 5-6 th June 2014 Geneva Chair Petter ÅSMAN.
EULITA / Liese Katschinka Copyright (c) An ISO Standard for Interpreting Services in Judicial Settings Opatija, 20 March
UNECE Agenda item 2 : Matters arising since the fifteenth session Presented by the UNECE secretariat for information.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
 decimals/cc-7th-fracs-to-decimals/v/converting-fractions-to-decimals-example.
Community Plan Implementation Training 5-1 Community Plan Implementation Training 5-1.
ENL1819T Progress Report Confidence in Our Success.
Brief Report to GRPE about the progress made by EFV Informal Group during its 6 th meeting held at Geneva on 15 th January, By Mr. Ambuj Sharma Chairman.
Implementation Strategy July 2002 STANDARDS DEVELOPMENT LIFECYCLE PROCESS ORP Publishes & Maintains 8 Standing Committee Recommends Approval / Disapproval.
A Modest Proposal  With apologies to Jonathan Swift.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
CDISC CEN/TC251 GS1 HL7 IHTSDO ISO/TC215 Joint Initiative on SDO Global Health Informatics Standardization Joint Initiative Meeting Model.
REPENTURN July 5, 2015 REPENTURN REPENTURN REPENTURN.
Director’s Progress Review Closeout Meeting
TEXAS NODAL (ERCOT REVISIONS)
Worldwide ENC Database Working Group
Status report on CJK NGN Working Group
Tyre GTR # 16 Progress report
Implementation Strategy July 2002
Japan proposal on schedule
Status report on CJK NGN Working Group
ASSIGNMENT NO.-2.
2018 CompTIA PK0-004 Study Guide Killtest
Project Organization Chart Roles & Responsibilities Matrix
Vice President Education (VPE)
Inter-Regional Coordination Committee
Transformation Project Overview
Japan proposal on schedule
CEOS 3-Year Work Plan Annual Update
Director’s Progress Review Closeout Meeting
UNECE IWG on EPPR for L-category vehicles Status Report
Carbon Action Items Status
RR-TAG Opening Report July 2017
خطوات البحث العلمي.
PCC Update 07/22/09 Implementation Phase 1
Every meeting has three parts: Ramp-Up, Meeting, Follow-Up.
OBD Correspondence Group (CG)
Supporting information for OBD Correspondence Group (CG) TOR
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
India proposal to EPPR 23-06
Detailed agenda for OBD Ⅱ discussion
LAMAS Working Group December 2013
Discussion of OBD2 by “Correspondence Group” Japan’s proposal
Next Steps Advisory group debrief call Circulate meeting summary
1. Summary # items RESULTS status remarks EV_1 HEV system power
UCAAT 2015, ready for the launch!
on propulsion of OBD2 gtr
Priority substances Water Directors meeting Paris November 2008
Session #5 Closing Status November , 2003
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
Why a „test phase“? Overview
3 Week A: May 1 – 19 3 Week B: May 22 – June 9
European Statistical System Network on Culture (ESSnet Culture)
WLTP Informal Working Group
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-34
Vice President Public Relations (VPPR)
Vice President Education (VPE)
Detailed agenda for OBD Ⅱ discussion
PROJECT MANAGEMENT WORKFLOW
Subcommittee 7 Spectrum Etiquette
JAPAN AUTOMOBILE STANDARDS INTERNATIONALIZATION CENTER
OBD Correspondence Group(CG)
OBD GTR phase2 Roadmap.
1. Summary # items RESULTS status remarks EV_1 HEV system power
Presentation transcript:

OBD Correspondence Group(CG) 2nd meeting Status Report

Progress of OBD2 Correspondence Group Phase 1 Phase 2 Progress percentage;90% (open item;1) Progress percentage;90% (open item;1) Phase 1 Phase 2 Progress percentage;0% (Wait for India’s proposal) June June (Up to 5.3.11.2 ) Progress percentage;65% (open item;8) Phase 1 Phase 2 Progress percentage;90% (open item;2) June Regarding Point 6&7 list of the Type VIII tests will be verified for it’s scope and completion in time schedule by India.

Red frame item(limited to open item) Blue frame item Assignments by July 10th, 2018 By July 10th, representatives of each stakeholder coordinate opinion within the members of stakeholder and notify Vice-Chair of concrete proposal. Red frame item(limited to open item) Blue frame item Phase 1 Phase 2 (Up to 5.3.11.2 ) (From 5.3.11.2) Phase 1 Phase 2