Drive Laser Commissioning Status

Slides:



Advertisements
Similar presentations
Strecher, compressor and time structure manipulation
Advertisements

Ultrafast XUV Coherent Diffractive Imaging Xunyou GE, CEA Saclay Director : Hamed Merdji.
CTF3 Laser Status Massimo Petrarca CLIC January
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Philippe Hering October 30, 2007 Drive Laser Commissioning Results and Plans 1 Drive Laser Commissioning results and plans Philippe.
Bill White Lasers and Ultra-precise October 29, Lasers and Ultra-precise Timing Injector Laser and Commissioning.
1 Injector Lasers Overview Sasha Gilevich, SLAC April 29, 2004 Drive Laser Specifications Challenges System Description Laser Procurement R&D Effort UV.
Dave Dowell, Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update Injector Drive Laser Update.
Sasha GilevichFacilities Advisory Committee October Injector Drive Laser Update 1 Facilities Advisory Committee Meeting.
Bill White Laser Installation and April 20, Laser Installation and Commissioning April 20, 2006 Procedures.
Bill White Drive Laser April 16, Drive Laser Commissioning Experience Reminder of requirements on Drive Laser.
Sasha GilevichFacilities Advisory Committee April Injector Drive Laser Update Facilities Advisory Committee Meeting April.
SLAC XFEL Short Bunch Measurement and Timing Workshop 1 Current status of the FERMI project (slides provided by Rene Bakker) Photoinjector laser system.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
Recent developments for the LCLS injector Feng Zhou SLAC Other contributors: Brachmann, Decker, Ding, Emma, Gilevich, Huang, Iverson, Loos, Raubenheimer,
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
Siegfried Schreiber, DESY The TTF Laser System Laser Material Properties Conclusion? Issues on Longitudinal Photoinjector.
30. Nov I.Will, G. Klemz, Max Born Institute: Optical sampling system Optical sampling system for detailed measurement of the longitudinal pulse.
DMP Product Portfolio Femtosecond Lasers Trestles Ti:Sapphire lasers …… fs; nm, mW Mavericks Cr:Forsterite lasers
The UCLA PEGASUS Plane-Wave Transformer Photoinjector G. Travish, G. Andonian, P. Frigola, S. Reiche, J. Rosenzweig, and S. Telfer UCLA Department of Physics.
Laser beam parameter measurements at PITZ J.Bähr Workshop on Laser Pulse Shaping DESY,Zeuthen, November 30, 2006.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
30 Nov. 06 I.Will et al., Max Born Institute: Long trains of flat-top laser pulses Photocathode lasers generating long trains of flat-top pulses Ingo Will,
Summary of issues. RF-Gun cavity – Disk and washer (DAW) : very fast RF ageing, 2 MeV is not enough. – Quasi travelling wave side couple structure : Lower.
Low Emittance RF Gun Developments for PAL-XFEL
ATF1/2 laser-wires Stewart T. Boogert on behalf of UK Extraction line laserwire collaboration A. Aryshev, G. Blair, S. Boogert, A. Bosco, L. Corner, L.
Recent Experiments at PITZ ICFA Future Light Sources Sub-Panel Mini Workshop on Start-to-End Simulations of X-RAY FELs August 18-22, 2003 at DESY-Zeuthen,
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
Advancement in photo-injector laser: Second Amplifier & Harmonic Generation M. Petrarca CERN M. Martyanov, G. Luchinin, V. Lozhkarev Institute of Applied.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Brian Sheehy Laser and Timing.
Bill White Commissioning October 9, 2006 Drive-Laser Commissioning Status and Plans Requirements Where do we stand today?
Schematic of Laser Transport Vacuum enclosure Laser Room Interlocked, controlled area Laser Wall Periscope in vacuum enclosure Cathode Fiduciary Beam line.
Workshop for advanced THz and Compton X-ray generation
Laser system at PITZ J.Bähr LCLS Injector Commissioning Workshop SLAC, October 9-11, 2006.
Drive Laser Introduction ‘ir’ master oscillator power amplifier chain (MOPA) uses standard chirped pulse amplification scheme (CPA) third harmonic generation.
February 17-18, 2010 R&D ERL Brian Sheehy R&D ERL Laser and laser light transport Brian Sheehy February 17-18, 2010 Laser and Laser Light Transport.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Sasha Gilevich, Alan Miahnahri Drive Laser 11/4/2004 Agenda General Information Project Status Transport Tubes Design.
An H- stripping laser using commercial, diode-pumped Nd:YAG amplifiers Russell Wilcox Laser Stripping Workshop, April 11, 2011.
Sasha GilevichDrive Laser Meeting December Launch System Outline General Layout Incidence Angle Effect of the broad bandwidth.
LASER SYSTEM STATUS G.Gatti, A. Ghigo, C.Vicario, P.Musumeci, M. Petrarca, S. Cialdi, D. Filippetto REVIEW COMMITTEE 16/11/05.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Status of the SPARC laser and “dazzler” experiments
LASER SAFETY External EHS Expert Panel Workshop
Summary of SPARC first-phase operations
Drive-Laser Commissioning Status and Plans
Laser System Upgrade Overview
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
Commissioning plan for
Drive laser specifications:
Nd:YAG Solid Laser 3-2 / A-1 on the ground
Laser Beam Transport and Integration AWAKE Collaboration meeting Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev.
Application of a Streak camera at PITZ
DESIGN AND FIRST EXPERIENCE WITH THE FERMI SEED LASER
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Gun Commissioning Status & Plans David H
Kansas Light Source Laser System J. R. Macdonald Laboratory
Advanced Research Electron Accelerator Laboratory
LASER SYSTEM STATUS G.Gatti , A. Ghigo , C.Vicario , P.Musumeci ,
Drive Laser Facility Layout Drive Laser Architecture Technical Issues
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Drive laser specifications:
Drive Laser Status and Hand-Off to Operations
Drive Laser Status and Hand-Off to Operations
LCLS Injector Laser System Paul R. Bolton, SLAC April 24, 2002
LCLS Injector System Overview D. H
Injector Drive Laser Update
Injector Drive Laser Technical Status
Presentation transcript:

Drive Laser Commissioning Status Reminder of requirements on Drive Laser Thales laser Transport system Commissioning in three areas Thales laser and it’s specs Beam conditioning and transport Virtual cathode alignment Lessons learned – remaining issues Future

UV pulse goals IR to UV conversion efficiency > 10 %, 2.5 mJ output @ 255 nm 252-258 nm, < 2% energy stability 120 Hz, MTBF > 5000 hours Spatial Profile FWHM = 1.2 – 3.0 mm Temporal Profile FWHM = 10 ps (5-20 ps) 90-10 rise and fall times < 1 ps flat-top, < 8% peak-to peak

Thales Laser system Stretcher UV Conversion Dazzler Preamplifier Compressor Oscillator Final Amplifier Regen

Active Steering Stabilization Transport Beam shaper Vacuum cell Zoom Transport tube Table in the tunnel Photocathode Virtual Cathode Steering system Active Steering Stabilization L1 L2 L3 L4 L5 L6 Waveplate Polarizer Powermeter Camera Shutter Laser Bay Launch System

Active Steering Stabilization M6 In order to meet centroid position stability requirement (min 60μm) M6 should be stabilized with 35μrad accuracy Sensitivity of the mirror mount 7arcsec – 34 μrad Laser Bay Transport Tube M4 Table in the tunnel Camera C2 M5 From Virtual Cathode M3 Camera C1 Steering Stabilization system test is underway M2 To Photocathode

Transport System in the Laser Bay Remotely Controlled Mirror Lens Shaper Beam Size Adjustment Shaper Input Adjustment To Transport tube Laser Output

Optical System next to the Photocathode From Transport tube Steering Stabilization Camera Remotely Controlled Mirror Lens Virtual Cathode camera Steering Stabilization Camera Lead Block Lens Remotely Controlled Mirrors Powermeter Lead Blocks Photocathode In vacuum mirror

Transport Commissioning Shaper Diagnostics Characterization Calibration of diagnostics GTL Installation Virtual Cathode

Timeline - Laser Commissioning Laser table and LSS in Vault Feb 13th – Began taking UV into vault Feb 23 – GTL installation began VC March 1 to March 12. Gun Installation began March 12. ARR April 4 Beam April 5

Commissioning Issues Better Schedule coordination Too many people all working in small space Minor problems have widespread impact Because of shortened laser commissioning, some laser commissioning will continue with injector commissioning

Commissioning Issues Streak Camera Cross correlator

Temporal Pulse Shaping The achieved temporal pulse shape meets physics requirements for the injector commissioning Plan to improve the temporal shape Replace the Lyot filter in the regen amplifier by the edge mirrors – this will reduce oscillations Continue working on the Dazzler settings and the optimum UV conversion crystals lengths Thales engineers are coming back in September to continue working on shaping Plan B – to use stacking of Gaussian pulses Design and parts for pulse stacking are in place

Commissioning Issues Newport aspheric telescope GBS-UV H Converts Gaussian to flat-top Requires good Gaussian input Very sensitive to alignment Aperture is just as good and much simpler to align Allows flexibility Simplifies overall transport GBS-UV H

Today

Commissioning Issues Transport Tubes 10m long Hydro-carbons coating and damaging inside of windows when exposed to UV Dust inside tube settling on inside of windows – Damage and diffraction Will go to less expensive windows and on site pump so the windows can be replaced more quickly.

Commissioning Issues Oscillator Problems Picomotor translation stage instability Femtolase will replace Coarse control currently disabled/manual Phase ambiguity due to locking at 476MHz Impacts phasing of RF This oscillator does not self start mode-locking or RF locking Femtolase will replace this oscillator with an all new unit that should address all of these issues

Jedi Pump Laser Failure of Q-switch driver Various chiller problems We diagnosed. Thales rushed a board and technician to us. 3 Days lost Various chiller problems Now have local source of spares Began purchasing spares in November CR Delayed order placement Should receive in August Hot swappable spares

Future - Hand Over to Ops Now Develop procedures for laser Automate things that can and need to be automated August 07 Down Train Operations Group on typical Operation Procedures Hand off laser by Jan 08 Laser Group will support Ops Scheduled Maintenance Issues that arise outside of the typical operation envelope

End