1 st Wave Allen plays Atascosita 9 AM, Ct 1 Allen plays Coppell 10 AM, Ct 1 2 nd Wave If Allen is 1 st in Wave 1, Play at 2:30 and 4:30 on Ct 2 (R2G1P1)

Slides:



Advertisements
Similar presentations
Digital Image Processing, 2nd ed. © 2002 R. C. Gonzalez & R. E. Woods Chapter 11 Representation & Description Chapter 11 Representation.
Advertisements

FAC Items in Process (Action Items) 1) Version Description Document (VDD) for DM2 V 2.01 o Opened: April 2010 o Process step: Incorporated into next version.
Mounting Installations SITRANS P for Differential Pressure
MAINTENANCE GUIDE SOCKET LAYOUT ………………………………..p2 SOCKET IDENTIFICATION …………………..p3 SOCKET ASSEMBLED ………………………….p4 ~p7 CONTACTS REMOVAL …………………………p8 UPPER.
ECE555 Lecture 8/9 Nam Sung Kim University of Wisconsin – Madison
2 nd Semester Final Review IX Practice and MiniQuiz.
RAD Techniques with Advantage CA-ADS Brock Shaw Torrodon Associates.
Questionnaire on Water Consumption in Sweden P1 From what source do you consume water from most frequently ? P2 Is your home connected to the public system.
Questionnaire on Water Consumption in Sweden P1 From what source do you consume water from most frequently ? P2 Is your home connected to the public system.
17 February 2011 Track 3: Value Metrics, Value Models and the Value Proposition 1 Ontology Summit 2011: Making the Case for Ontology Track 3: Value Metrics,
Virtual Reality Unit 5 Reading 1st period Unit 5 Reading 1st period.
030524, Geneva, ITU Standardization on eHealth p1 EHTEL European Health TELematics Association Interoperability in eHealth Dr.med. Martin D.
BRUSSELS AIRPORT CDM PROJECT
Genes and Evolution Comparative Genome Structure and Evolution Synteny- comparison of chromosome order in related species.
Cross-classified and Multiple membership models
P1 RJM 14/06/04Robotics : From Seven Dwarfs to R2D2 © Dr Richard Mitchell 2004 Robotics: From the Seven Dwarves to R2D2! Dr Richard Mitchell Department.
P1 RJM 13/03/08For IEEE Colloquium Control Education, Sheffield © Dr Richard Mitchell 2008 Modeling Project at Reading Dr Richard Mitchell and Dr Will.
P1 RJM 16/10/02EG1C2 Engineering Maths: Matrix Algebra Tutorial 1 A mass (weight 20N) is suspended by two wires as shown in the figure: relevant distances.
BA A = turning point B = position of 3 rd wheel/trace, mid way along beam C= possible counterweight position, above 3 rd wheel/trace C 0.87m Beams 0.9t.
Model checking with Message Sequence Charts Doron Peled Collaborators: R. Alur, E. Gunter, G. Holzmann, A. Muscholl, Z. Su Department of Computer Science.
Visual Formalisms Message Sequence Charts Book: Chapter 10.
Programming Aptitude Testing Materials, Data analysis
1 Two dimensional thining Let P =(V, m, n, B) and P ' = (V, m, n, B - D) be digital pictures, where D B. Then we say that P' is obtained from P by deleting.
Algorithms for Geometric Covering and Piercing Problems Robert Fraser PhD defence Nov. 23, 2012.
OLAP Over Uncertain and Imprecise Data T.S. Jayram (IBM Almaden) with Doug Burdick (Wisconsin), Prasad Deshpande (IBM), Raghu Ramakrishnan (Wisconsin),
17 th International World Wide Web Conference 2008 Beijing, China XML Data Dissemination using Automata on top of Structured Overlay Networks Iris Miliaraki.
Tutorial 8 Exercises CH8.
Ken C. K. Lee, Baihua Zheng, Huajing Li, Wang-Chien Lee VLDB 07 Approaching the Skyline in Z Order 1.
Differential Amplifiers and common mode feedback
What Time Is It? Lesson by Mrs. Moody, FLE. M1M2 Students will develop an understanding of the measurement of time. a Tell time to the nearest hour and.
Keeping Track: Incorporating Nvivo across Time and Space Catherine Compton-Lilly, Jieun Kim, Erin Quast, and Patricia Venegas.
Then/Now You named angle pairs formed by parallel lines and transversals. Use theorems to determine the relationships between specific pairs of angles.
This project has been funded with support from the European Commission On-line textile and clothing dictionary Fashion school II – Multimedia.
Minimum Weight Plastic Design For Steel-Frame Structures EN 131 Project By James Mahoney.
CS1104 – Computer Organization
Estimating Reliability RCMAR/EXPORT Methods Seminar Series Drew (Cobb Room 131)/ UCLA (2 nd Floor at Broxton) December 12, 2011.
SWTTail Season Conjunctions 1 UCB, Dec THEMIS SCIENCE WORKING TEAM MEETING Tail 1 Conjunctions Sabine Frey University of California - Berkeley.
Karnaugh Map Adjacent Squares
Digital Logic Design Gate-Level Minimization
Karnaugh Map Adjacent Squares
INTEGRATED STUDIO INTEGRATED STUDIO …an INTRO prepared by: dr.mazran ismail.
Washington WASHINGTON UNIVERSITY IN ST LOUIS Concurrency: Deadlock Detection Fred Kuhns Department.
1 © EURIDICE Consortium 2008 Kick Off Meeting Island of San Servolo - Venice, Italy 11th to 13th February 2008 WP12 - Domain Knowledge Formalization Kostas.
B AB CD C A D m0m1m3m2 m4 m5m7m6 m12 m8m9m11 m10 m13 m15m14 Input combo mintermExpressio n 0000m0A’B’C’D’ 0001m1A’B’C’D 0010m2A’B’CD’
BME - Budapest University of Technology and Economics 1872 BME - Budapest University of Technology and Economics 1872 RESEARCH at BME.
Computer Graphics 4: Viewing In 2D
Toulouse Blagnac campaign test results By DSNA
Shortest Violation Traces in Model Checking Based on Petri Net Unfoldings and SAT Victor Khomenko University of Newcastle upon Tyne Supported by IST project.
On Specification and Verification of Location- Based Fault Tolerant Mobile Systems Alexei Iliasov, Victor Khomenko, Maciej Koutny and Alexander Romanovsky.
Victorian Maternity Record (VMR) Pilot – a Change Management project
2 nd Semester Final Review VI Practice and MiniQuiz.
Thermal Physics x z AP Physics B Lecture Notes.
Splines IV – B-spline Curves
CVRD ECT Level 3 Workshop RMS Express (Advanced Operations) Module 7 of 9 September 09, 2013.
Geometry Introduction
Construction of a regular pentagon Dr Andrew French Const. Pent. p1 of 10. A.French 2012.
Computer Architecture CST 250 K-Map Prepared by:Omar Hirzallah.
Jim Haywood Product Manager School Census Autumn 2010 DfE Summary Report 1 Version 1.3.
NGfL CYMRU GCaD BTEC First in Performing Arts Unit E23: Working as a Musical Ensemble.
GCSE Sawston VC Gary Whitton – Head of Science.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
15-853Page :Algorithms in the Real World Error Correcting Codes I – Overview – Hamming Codes – Linear Codes.
Distributed Database Management Systems Lecture 15.
1 DOE Data Center Tools Suite Assessment Tool Development Electrical Example Lawrence Berkeley National Laboratory ANCIS EYP Mission Critical Rumsey Engineers.
Distributed Computing 9. Sorting - a lower bound on bit complexity Shmuel Zaks ©
Computer simulation of patient flow through an operating suite David E. Clark, MD FACS Department of Surgery, Maine Medical Center, Portland ME Stata Conference.
A. S. Morse Yale University University of Minnesota June 4, 2014 TexPoint fonts used in EMF. Read the TexPoint manual before you delete this box.: A A.
Chapter 6 Intermediate Code Generation
Spatial Information Systems (SIS) COMP Spatial data structures (1)
INTRODUCTION Anggra Prima, S.Pd (0711) BAHASA INGGRIS II Bobot:2 sks Penilaian:Tugas (20%), Kuis (10%), UTS(30%), UAS(40%) Buku Wajib:Kumpulan.
Presentation transcript:

1 st Wave Allen plays Atascosita 9 AM, Ct 1 Allen plays Coppell 10 AM, Ct 1 2 nd Wave If Allen is 1 st in Wave 1, Play at 2:30 and 4:30 on Ct 2 (R2G1P1) If Allen is 2 nd in Wave 1, Play at 2:30 and 3:30 on Ct 3 (R2G1P8) If Allen is 3 rd in Wave 1, Play at 2:30 and 4:30 on Ct 5 (R2G2P1)

Ct 1Ct 2Ct 3Ct 4Ct 5Ct 6Ct 7 ARENABLUEREDBOX # 1BOX #2WEST # 1WEST # 2 8:00 AMR1G1P1R1G1P2R1G1P7R1G1P8XXXXXXR1G1P9R1G1P10 9:00 AMR1G1P1R1G1P2R1G1P7R1G1P8XXXXXXR1G1P9R1G1P10 10:00 AMR1G1P1R1G1P2R1G1P7R1G1P8XXXXXXR1G1P9R1G1P10 11:00 AMR1G1P3R1G1P4R1G1P11R1G1P5XXXXXXR1G1P6R1G1P12 12:00 PMR1G1P3R1G1P4R1G1P11R1G1P5XXXXXXR1G1P6R1G1P12 1:00 PMR1G1P3R1G1P4R1G1P11R1G1P5XXXXXXR1G1P6R1G1P12 2:30 PMR2G1P2R2G1P1R2G1P8R2G1P7R2G2P1R2G2P2XXXXXX 3:30 PMR2G1P2R2G1P1R2G1P8R2G1P7R2G2P1R2G2P2XXXXXX 4:30 PMR2G1P2R2G1P1R2G1P8R2G1P7R2G2P1R2G2P2XXXXXX 5:30 PMR2G1P5R2G1P6R2G1P3R2G1P4R2G2P3R2G2P4XXXXXX 6:30 PMR2G1P5R2G1P6R2G1P3R2G1P4R2G2P3R2G2P4XXXXXX 7:30 PMR2G1P5R2G1P6R2G1P3R2G1P4R2G2P3R2G2P4XXXXXX

Ct 1Ct 2 Ct 3Ct 4Ct 5Ct 6Ct 7 ARENABLUE REDBOX # 1BOX #2WEST # 1WEST # 2 8:00 Championship M1 Championship M28 Championship M8 Championship M7 COMEBACK # 1 CONTENDER M1 CONTENDER M2 9:00 Championship M4 Championship M39 Championship M5 Championship M6 COMEBACK # 2 CONTENDER M4 CONTENDER M3 10:00 Championship M9 Championship M1210 Championship M13 Championship M16 CHALLENGE # 1 CONTENDER M5 CONTENDER M7 11:00 Championship M10 Championship M1111 Championship M14 Championship M15 CHALLENGE # 2 CONTENDER M6 CONTENDER M8 12:30 Championship M19 Championship M2012 COMEBACK M3 COMEBACK M4 CHALLENGE M4 CHARACTER M1 CHARACTER M2 1:30 Championship M17 Championship M181 CONTENDER FINALS Contender M4 CHALLENGE M3 CHARACTER M3 CHARACTER M4 3:00 CONSOLATION FINALS 4:30 CHAMPIONSHIP FINALS