Sub Working Group 2 Protocols & Messages

Slides:



Advertisements
Similar presentations
Doc.: IEEE /064r0 Submission March 2000 Mårten Mattsson, EricssonSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Advertisements

Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
Software Quality Assurance Plan
Date, Location, Host and Scope Date: 17 – 27 March 2014 Location: Automotive Campus, Helmond, Netherlands Host: TASS International Supported by EC Organized.
VeriFlow: Verifying Network-Wide Invariants in Real Time

Framework & Requirements for an Access Node Control Mechanism in Broadband Multi-Service Networks ANCP WG IETF 71 – Philadelphia draft-ietf-ancp-framework-05.txt.
DOCUMENT #:GSC15-PLEN-51 FOR:Presentation SOURCE:ITU AGENDA ITEM:Plenary 6.10 Conformance and Interoperability Testing.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
1 Network Administration Module 3 ARP/RARP. 2 Address Resolution The problem Physical networks use physical addresses, not IP addresses Need the physical.
TTCN-3 MOST Challenges Maria Teodorescu
DOCUMENT #:GSC15-PLEN-36 FOR:Presentation SOURCE:ETSI AGENDA ITEM:PLEN 6.6 CONTACT(S):Soeren Hess, TC ITS Chair Intelligent Transport Systems Presenter:
TP#13 oneM2M testing discussion TP#13 Source: Laurent Velez, ETSI, Meeting Date:
Presents H.323 Forum H.323 Forum Certification Status Update Presented by Anatoli Levine RADVISION.
TTCN-3 User Conference, 6-8 June 2005 Hannu Rytilä The Mythical IUT How to support automatic testing in standardization OBSAI conformance testing as an.
Mobile IPv6 in 6NET: An Overview Chris Edwards, Lancaster University, UK.
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
Gatekeeper Plan features that support person-centered planning.
Colombo, Sri Lanka, 7-10 April 2009 Need of Interoperability “within” an NGN – An approach Rajeshwar Dayal, Director Dept. of Telecommunications, India.
World Class Standards STF395 DCC / DSRC coexistence Dieter Smely © ETSI All rights reserved July 2011 | Workshop Ispra.
Overview Standards First deployment C-ITS
ETSI TC ITS Status on Standardization Martin ARNDT ETSI ESP © ETSI All rights reserved M2M Market and Technology Opportunities
2 nd oneM2M Interoperability Event Prof. Song JaeSeung (KETI, TST WG Chair) TST Introduction-to-2 nd -interop-event.
Graciela Perera Department of Computer Science and Information Systems Slide 1 of 18 INTRODUCTION NETWORKING CONCEPTS AND ADMINISTRATION CSIS 3723 Graciela.
Team Members: ECE- Wes Williams, Will Steiden, Josh Howard, Alan Jimenez Sponsor: Brad Luyster Honeywell Network Traffic Generator.
SPaT Challenge Overview and Execution
TLS authentication using ETSI TS and IEEE certificates
Understanding Standards: Nominee Training Event
C-ITS technical specifications for Interoperability status and roadmap
Software Overview Sonja Vrcic
Autostrade Tech DATEX Broker and Browser
Land Cover Side Event: A new path forward for generating products
TTCN Case Study - InterWatch
IEEE 802 OmniRAN Study Group: SDN Use Case
Automated Interoperability Testing
WPM ad-hoc group report TP#25
IEEE 802 OmniRAN EC SG July 2013 Conclusion
IEEE 802 OmniRAN EC SG July 2013 Conclusion
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Vehicular Public Key Infrastructure Scalability
Automated Interoperability Testing
Software Testing With Testopia
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
ATIS Cybersecurity DOCUMENT #: GSC13-GTSC6-12 FOR: Presentation
Precision Time Protocol
Risto Öörni, M.Sc. (Tech) Implementing eCall System,
The Only Digital Asset Management System on Microsoft Azure, MediaValet Is Uniquely Equipped to Meet Any Company’s Needs MICROSOFT AZURE ISV PROFILE: MEDIAVALET.
Environmental Data Exchange in Cooperating Driving Systems
TDL: The ETSI Test Description Language
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Carlos J. Bernardos, Alain Mourad, Akbar Rahman
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
GEO-XIII Plenary St. Petersburg Russian Federation
TDL: The ETSI Test Description Language
Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO)
William Stallings Data and Computer Communications
Mark Epstein Senior Vice President Qualcomm
Presenter: Adrian Scrase ETSI Chief Technical Officer (CTO)
July 2007 doc.: IEEE p Jan Case Study for reduced priority management frames – Vehicular Safety Communication Date:
Diagnosis of V2X communication via evaluation modules and textual rule sets Presented by Tim Ruß © All rights reserved.
Car-2-Car - A survey on CAM statistics
Interoperable NGV PHY Improvements
PSS0 Configuration Management,
Sept 2004 doc.: IEEE a Nov 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
ETSI Contribution to 3rd Meeting of EC Expert Group on RRS
ETSI BRAN Update (IEEE Co-Existence Workshop)
Editors: Bala’zs Varga, Jouni Korhonen
CTI/MTS collaboration - 3GPP TF160
DetNet Data Plane Solutions draft-ietf-detnet-dp-sol-ip-02  draft-ietf-detnet-dp-sol-mpls-02  Bala’zs Varga, Jouni Korhonen, Janos Farkas, Lou Berger,
Presentation transcript:

Sub Working Group 2 Protocols & Messages Car2Car Forum Mainz, 04.11.2015 Sub Working Group 2 Protocols & Messages Presented by Jörn Edlich, CETECOM Sebastian Müller, ETSI

Sub Working Group 2 Content Identification of Requirements related to Facilities and Networking layer CAM, DENM, GN Requirements defined based on: C2C Basic System Standards Profile ETSI Base Specifications Goal is to ensure protocol conformance Resulting Protocol Conformance Tests Provided in Human readable format Implemented in TTCN-3 17.05.2019 WG Arch

Status Update Sub Working Group 2 Current Status Requirements sheets complete (version v25) First release of Test cases complete V1.0.0 Issues on BSSP 2014-1-31v1.0.4 reported to Bugzilla 1st verification event executed in March 2015 at Plugtest Helmond GNSS scenarios and replay functionality implemented in all test cases 2nd verficiation event planned for November 2015 5/17/2019 WG-CA – SG 2 Status

Test Cases and Requirements 69 testable requirements identified overall 13 CAM, 26 DENM, 30 Network and Transport Layer 94 Test cases overall 28 Prio 1 (12 CAM + 14 DENM + 2 GN) (new developed test cases) 53 Prio 2 (13 CAM + 23 DENM + 17 GN) (ETSI mapped test cases) 13 Prio 3 (13 GN) (ETSI req. , no correlating C2C req. available yet but essential protocol features) mandatory for certification 5/17/2019 WG-CA – SG 2 Status

HIL test setup Test case DB Upper Tester Commands via Ethernet Test Controller CAN messages CAN replayer (only for PoTi test cases) Proxy (Convert CAN messages, optional) CAN Diag Ethernet CAN RF GPS signals GNSS replayer Upper Tester App App 1 App 2 Logging + Analysis FAC 11p 11p signals NET PHY DUT (ITS Station) 5/17/2019 WG-CA – SG 2 Status

HIL test setup (picture taken at ETSI Plugtest) 5/17/2019 WG-CA – SG 2 Status

Challenges Mapping of ETSI requirements to C2C BSSP requirements investigation on what is redundant and where are new test cases to be developed Verify the new developed and implemented test cases Verification events Test cases related to traces, path history, path points and message generation rules missing GNSS replay functionality in first set of test cases External GNSS simulator to replay geolocation and timing data 17.05.2019 WG-CA – SG 2 Status

(Helmond ETSI Plugtest, March 2015) Verification event Goal is to verify the correct implementation of the test cases Companies invited to verify the test cases with their equipment implementation Depending on results and analysis test cases: to be reworked accepted Status today New version including GNSS replayer Initial implementation stable version (no GNSS replayer) bugzilla Resulution implemented Final version bug fixes bug fixes bug fixes Bug report Bug report Bug report 1st verification event (Helmond ETSI Plugtest, March 2015) 2nd verification event (CETECOM, Q4/2015) 3rd verification event (final release) 17.05.2019 WG-CA – SG 2 Status

Results of 1st verification event (1/2) Precondition: 29 test case written by external companies (FSCOM & TestingTech) Test cases verified in verification event Verification done by 6 manufacturers Outcome: Overall pass rate was around 55% (16 of 29 tests) Investigation on failed test cases showed some test script implementation erros Some test cases need to be reworked Next steps: Test cases reworked and optimized Test cases to be revalidated in 2nd verification event 5/17/2019 WG-CA – SG 2 Status

Results of 1st verification event (2/2) 5/17/2019 WG-CA – SG 2 Status

Open points / next steps Providing Input for Working Group Compliance Assessment Whitepaper Implementation of bugzilla resolutions (requirements update) Planning (final) verification event for new developed test cases verification of Test System and Test Cases with GNSS replayer features (test cases available since end of October) Finalizing the Scope of Compliance Assessment 5/17/2019 WG-CA – SG 2 Status

5th C-ITS Plugtest 2016 Date: 7 – 18 November 2016 Location and Host: TBD Organized with ERTICO, Supported by EC Test Infrastructure extension with Traffic Management components Based on Central System, Traffic Controller and RSUs Support from Siemens. Any other suppliers are welcome Scope End-to-end Interop Tests SPAT, MAP, IVI, CAM, GN Selected use cases from TR 102 638 Release 1 revision and EC projects PKI Trust Center (Certificate Management) DCC tests (under study) Mitigation CEN DSRC and ITS G5 Conformance Car Drive Tests 17.05.2019 WG-CA – SG 2 Status

System Architecture – example ECo-AT 17.05.2019 WG Arch

Jörn Edlich Tel.: +49 (0) 173 87 80 286 joern.edlich@cetecom.com 5/17/2019 WG-CA – SG 2 Status

Backup 5/17/2019 WG-CA – SG 2 Status

Test case overview Test purposes are defined Test cases are implemented in TTCN-3 language on the test system are executed automatically via the test system 5/17/2019 TF-CA – Sub WG 2 Status

Requirement topics Application FAC GN Access Facility Layer (CAM&DENM) Generation Frequency (CAM) Path History (CAM & DENM) Expiry Handling (DENM) Periodic Retransmission (DENM) Trace (DENM) Geo-Networking Beaconing Single Hop Broadcast Next Hop Selection Geo Broadcast Forwarding Algorithm Duplicate Address Detection Protocol Stack Application FAC GN Access 5/17/2019 TF-CA – Sub WG 2 Status