AUG Query Responses 19th December Overview AUGE Guidelines require AUGE to report outcome of Query Process to UNCC UNCC to consider AUGE recommendations.
Advertisements

Application of User Pays Principles to Existing Service Lines 22nd November 2006.
New project process – timescalesDN xoserve IGT/ Agent Shipper Apply for connection Ref IG123 OR AG123 Issues quote Ref DN123 Accepts quote Quotes Developer/UIP.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
Nexus Workgroup CSEP Transition Topic June
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
PN UNC Workgroup iGT Services 7 th February 2012.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
1 Industry Shipperless &Unregistered Working Group Wednesday 7th July 10.00am at xoserve.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
13 th July 2009 Meeting of Theft of Gas Review Group (UNC245)
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime 28 May 2009 Code User Pays Services.
Connected System Exit Points Options for strategic regime change Chris Warner.
IGT and Shipper Workgroup meeting 28 th February 2011.
DCA timeline and ROM Overview 12 October Smart Metering Indicative Timeline Evaluation Service (EVS) 2528 received / Rough Order of Magnitude.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
Supply Point Register 7th December 2011
Modifications iGT 039 and GT 0440 re iGT Agency Services background
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Amendment Invoice Task Force Progress Report
Nexus Meter Read Performance April 2018
Must Read Process Guide For Shippers
PAF Risk Register and PARR mapping
Change Management Committee – June 2019 Update
R&N Timeline Release 2 Release 3 Feb-19 June-19
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Change Management Committee – June 2019 Update
Connected System Exit Points Administration Options
New project process – timescales
DSC Change Budget 17th October 2018
CSEPs Reconciliation Proposals
Change Management Committee – November 2019 Release Update
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Connected System Exit Points Administration Options
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Mod 124 Steve Nunnington.
UIG Task Force Progress Report
June 2019 Release Scope DSC Change Management Committee
Release 3 Scope Selection and Plans
AUG Query Responses 21st November 2013.
Amendment Invoice Task Force Progress Report
Connected System Exit Points - Update
Project Nexus Workgroup
SSP – PROVISIONAL LSP – SSP AMENDMENT RULES
UIG Task Force Progress Report
Nexus Workgroup Winter Consumption and the influence on Winter Annual Ratio (WAR) Bands 8th January 2014.
Lessons Learnt UKLC - November 2015
Joint Theft Reporting Review (from meeting 1st March 2019)
CSEPs SPA Rejections November 2007 update
Change Management Committee – November 2019 Release Update
Recommendations - where we are
AQ Threshold Analysis Steve Taylor Centrica plc.
AQ Review System Calculation Overview
Development Work Group 0209 Straw Man Update
Nexus Workgroup Read Validation Scenarios
Change Management Committee – November 2019 Update
UIG Task Force Progress Report
Actions Updates Action 0282/006 – Exclude from AQ process
Modification 440 Project Nexus iGT Single Service Provision
Customer Issue Management CoMC Update
Annual Quantity (AQ) 45.
CSEPs SPA Rejections January – August 2007
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Customer Issue Management CoMC Update for June 2019
Enabling Large Scale Utilisation of Class 3
UK Link Change Impacts and Release Update
Recommendations - where we are
DSC Change Committee Update
Presentation transcript:

CSEPs SPA Rejections December 2007 update

Level of reporting Rejections are reported at line level This can inflate the rejection figures: If a file is resubmitted weekly without the error being corrected, each month could contain up to five rejections for one item CSP01 rejections could be incurred for one project but multiple shippers, further increasing the reported figures

CSEPs SPA rejections – December 07

CSP01 – CSEP does not exist Resolution: xoserve manually process rejections to enable resubmitted updates to accept Current position: reduced from peak but still high

CSP01 – project level Number of projects received each month resulting in CSP01s:

Age of CSP01 rejections 1,786 CSP01 rejections in December – earliest rejection on database 35% have been rejecting since June

LMP03 – LMN is not live Resolution: IGTs should not send updates for non live LMNs Current position: was reducing, spike in December

LMP01 – EUC incorrect for LMN Resolution: IGTs should send updates using the EUC held by xoserve Current position: large increase May, peak in June, some reduction since

AQ03 – No change to supply point count or AQ Resolution: IGTs should not send updates that do not change SPA data Large peak in October (AQ review?), great improvement in November, maintained into December

AQ04 – Max CSEP AQ exceeded Resolution: xoserve will process rejections to enable updates to accept, where AQs have been increased with DNs Resolution: IGTs examine whether updates are valid (duplicate LMNs?) Current position: low volumes attributed to system issue; validation corrected October hence increase to previous levels

AQ04 – project level

LMP06 – A live or pending meter is present Resolution: IGTs should not submit new domestic sites where an LMN already exists for project/shipper combination Current position: volumes vary each month, significant increase in November