Water directors meeting London November WGB - CEA activity

Slides:



Advertisements
Similar presentations
European Commission - DG Environment Unit D.2: Water & Marine.
Advertisements

European Commission DG Environment Marine Environment and Water Industry Unit Marine Strategy Framework Directive: Progress with Art. 12 assessment WG.
SSG on WFD and Agriculture State of play and the future
Implementation of the 2009 work programme of the
Pilot River Basin Network: Environment Directorate
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
IC network selection process
WG B Progress report Water Directors meeting Mondorf May 20 and 21
New Work Programme and mandates 2005/2006
Project Objectives, Workplan and Timescales
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
Horizontal Guidance on Wetlands
Progress report on activities and outputs of DG eco 1
SW/MW guidance Milestones
State of the WFD Implementation Process
State of play of French progress in cost-effectiveness analysis
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Agenda item 12.3 – Transboundary river basin management
Water directors meeting London November WGB- State of Play
JRC-Institute for Environment and Sustainability
European Water Conference Jorge Rodríguez Romero
Strategic Coordination Group
London Water Directors Meeting
Meeting of Water Directors WFD Common Implementation Strategy
Agenda Item 3d Ad-hoc Task Group (ATG) Hydromorphology
CIS progress June-November 2011: main highlights
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Horizontal Guidance on Wetlands
INTEGRATED TESTING OF GUIDANCE DOCUMENTS IN PILOT RIVER BASINS
Ad-hoc Activity: Biodiversity and Water Progress Report
Draft Mandate and Proposed Approach for the Drafting Group on
Meeting of Water Directors Eutrophication Guidance
Strategic Steering Group
WG 2.B Integrated River Basin Management
Research as a new activity of the CIS WG 2B
Meeting of Water Directors 2/3 December 2004
WG 2.B Integrated River Basin Management
WFD and Hydro-morphology
Progress Drafting Group on Environmental Objectives and Exemptions
WG C Groundwater Progress Report to SCG SCG-Meeting, 11/
Green Paper on Adaptation and
CIS Strategic Steering Group on Climate Change and Water
Water Directors’ Meeting Working Group D (Reporting) activities
Pilot River Basin exercise.
Pilot River Basin Water Framework Directive.
WG A Ecological Status Progress report April-October 2009
Activity on WFD and Agriculture
Environmental objective document –
Integrated Testing in Pilot River Basins
CIS Acitivity Env Objectives and Exemptions
Ad-hoc Activity: Biodiversity and Water Progress Report
CIS work programme Supporting the implementation of the first river basin management plans Water Directors' Meeting 30 November and 1 December.
WG E on Priority Substances
Item 11. Overview of EG activities
WG Integrated Testing in Pilot River Basins
Agenda item 2.1 – Overall Progress Report
Strategic Steering Group on WFD and Agriculture
Water Science-Policy Interface (CIS-SPI) Progress report
SCG meeting February 22nd DG on CEA: State of play
Status of the Nutrient Best Practice Guide
JRC-Institute for Environment and Sustainability
Brussels, 4 April, 2014 – WG Water Accounts
EU Water Framework Directive
WFD Expert Group on agriculture A new mandate for
Ad-hoc Task Group on Hydromorphology
WG A Ecological Status Progress report October 2010 – May 2011
Thierry davy Representative of the french water agencies
Environmental Objectives and Exemptions State of Play
Presentation transcript:

Water directors meeting London November 28-29 WGB - CEA activity Thierry Davy French Water agencies

CEA activity Four issues selected and addressed by the drafting group : scale, uncertainty, effectiveness of the measures, CEA in the planning process. A first draft document on CIRCA since September but … case studies and experiences are lacking. Data and experiences are difficult to obtain

CEA Activity : next steps Need to have a better idea of available experiences, methodologies and data in MS. How to progress? Using the UK questionnaire results Organising a working session, on 21 December with CEA drafters and PRB (Brussels). Each participant will be invited to present the state of play on CEA in his country, river basin, or NGO

CEA Activity : next steps The report will be modified during first trimester 2006, taking into account the new inputs, the conclusions coming from the working session, and the state of the art in the different MS. The draft new report will be discussed within WG B and SCG in 2006. Afterwards, it will be presented to Water Directors in June 2006. The final document should be practical and include examples